[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-947617":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},947617,683,1,"单选题","水上打桩时，应选择排水量比桩机重量大( )以上的作业船或牢固排架。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2倍",false,{"key":16,"text":17,"correct":18},"B","4倍",true,{"key":20,"text":21,"correct":14},"C","5倍",{"key":23,"text":24,"correct":14},"D","6倍","",{"id":6,"name":27,"category":28,"favorite":29},"桩机操作工","建筑工程",0]