[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-945763":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},945763,675,1,"单选题","施工升降机在多班作业实行交接班时，双方都要全面检查，做到不漏项，交接清楚，由交方负责填写交接班记录，接方核对相符经( )后，交方才能下班。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","认可",false,{"key":16,"text":17,"correct":18},"B","签收",true,{"key":20,"text":21,"correct":14},"C","同意",{"key":23,"text":24,"correct":14},"D","接受","",{"id":6,"name":27,"category":28,"favorite":29},"建筑起重机械司机（施工升降机）","建筑工程",0]