[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-945707":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},945707,675,1,"单选题","施工升降机在正常工作状态下，下极限开关的位置，在保证吊笼碰到( )之前，下极限开关首先动作。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","混凝土基础",false,{"key":16,"text":17,"correct":14},"B","导轨架顶部",{"key":19,"text":20,"correct":21},"C","缓冲器",true,{"key":23,"text":24,"correct":14},"D","极限开关挡板","",{"id":6,"name":27,"category":28,"favorite":29},"建筑起重机械司机（施工升降机）","建筑工程",0]