[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-945373":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},945373,672,2,"多选题","某工地上拆卸塔机。先由四名人员拆除了硬性拉杆后,即令驾驶员开始下放塔臂。当塔臂下放过程中,塔身开始后倾,塔臂迅速下降并冲击地面,塔身主弦杆彻底断裂,臂架一起后倾,在塔身上部的四人随塔身倾翻在地而死亡。事故原因分析如下:( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","塔身两根前主弦杆已存在严重的疲劳裂纹",true,{"key":16,"text":17,"correct":14},"B","作业人员在拆除了硬拉杆后,未及时撤离塔身",{"key":19,"text":20,"correct":14},"C","塔机裝拆过程中缺乏必要的审查和监护",{"key":22,"text":23,"correct":24},"D","塔机生产单位在制造过程中未按规程制作",false,{"key":26,"text":27,"correct":24},"E","设备、设施、工具、附件有缺陷","ABC","",{"id":6,"name":31,"category":32,"favorite":33},"建筑起重机械安装拆卸工","建筑工程",0]