[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-945372":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},945372,672,2,"多选题","塔吊顶升前,必须对( )、电缆等部件进行认真细致的检查,合格后方进行顶升。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","液压系统",true,{"key":16,"text":17,"correct":14},"B","顶升套架",{"key":19,"text":20,"correct":14},"C","挂靴爬爪",{"key":22,"text":23,"correct":14},"D","导向装置",{"key":25,"text":26,"correct":14},"E","防脱装置","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"建筑起重机械安装拆卸工","建筑工程",0]