[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-109415":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},109415,67,2,"多选题","项目的原始总投资由（ ）构成。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","建设投资",true,{"key":16,"text":17,"correct":14},"B","流动资金投资",{"key":19,"text":20,"correct":21},"C","经营成本",false,{"key":23,"text":24,"correct":21},"D","各项税款",{"key":26,"text":27,"correct":21},"E","营业外净支出","AB","项目的原始总投资包括：①建设投资。它是建设期发生的主要现金流出量。②流动资金投资。也称垫支流动资金，是在完整投资项目中发生的用于生产经营期周转使用的营运资金投资。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 农业经济","经济金融",0]