[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-109316":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},109316,67,2,"多选题","项目的核心风险包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","完工风险",true,{"key":16,"text":17,"correct":14},"B","生产风险",{"key":19,"text":20,"correct":14},"C","技术风险",{"key":22,"text":23,"correct":14},"D","部分市场风险",{"key":25,"text":26,"correct":27},"E","项目的金融风险",false,"ABCD","项目的核心风险也称“可控制风险”，是指与项目建设和生产经营管理直接有关的风险。包括：①完工风险；②生产风险；③技术风险；④部分市场风险。E项属于项目的环境风险。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 农业经济","经济金融",0]