[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-109306":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},109306,67,2,"多选题","公司投入到拟建项目上的现金来源有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","企业新增的、可用于投资的权益资本",true,{"key":16,"text":17,"correct":14},"B","企业原有的、可用于投资现金",{"key":19,"text":20,"correct":14},"C","企业原有的非现金资产变为现金资产",{"key":22,"text":23,"correct":14},"D","企业新增的债务资金",{"key":25,"text":26,"correct":27},"E","企业原有的全部资金",false,"ABCD","在公司融资情况下，项目的总投资可分为两个部分：①公司原有的非现金资产直接利用于拟建项目，投资估算和资金筹措不必涉及此部分；②拟建项目需要公司用现金支付的投资，投资估算和资金筹措所对应的就是这一部分投资。公司能够投入到拟建项目上的现金来源有：①企业新增的、可用于投资的权益资本；②企业原有的（包括在项目建设期内将陆续产生的）、可用于投资的现金（简称提现）；③企业原有的非现金资产变为现金资产；④企业新增的债务资金。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 农业经济","经济金融",0]