[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-108565":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},108565,67,1,"单选题","（ ）是可控制风险。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目的金融风险",false,{"key":16,"text":17,"correct":14},"B","部分项目的市场风险",{"key":19,"text":20,"correct":21},"C","生产风险",true,{"key":23,"text":24,"correct":14},"D","政治风险","项目的核心风险也称“可控制风险”，是指与项目建设和生产经营管理直接有关的风险。它包括：①完工风险；②生产风险；③技术风险；④部分市场风险。ABD三项属于项目的环境风险（不可控制风险）。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 农业经济","经济金融",0]