[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-108510":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},108510,67,1,"单选题","下列选项中，关于项目经济寿命期的说法，正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目经济寿命期是指从项目开始建设到项目主要固定资产报废所经历的时间",false,{"key":16,"text":17,"correct":14},"B","项目经济寿命期是指项目建设期加上项目建成后投产或交付使用后的生产服务期",{"key":19,"text":20,"correct":14},"C","项目经济寿命期大于其自然寿命期",{"key":22,"text":23,"correct":24},"D","项目经济寿命期是指项目建设期加上在自然寿命期内能够维持经济再生产且不因无形损耗被提前淘汰的期限",true,"项目的经济寿命期指项目建设期加上在自然寿命期内能够维持经济再生产且不因无形损耗被提前淘汰的期限。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 农业经济","经济金融",0]