[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-107933":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},107933,67,1,"单选题","从项目开始建设到项目主要固定资产报废所经历的时间是项目的（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","合理寿命期",false,{"key":16,"text":17,"correct":14},"B","经济寿命期",{"key":19,"text":20,"correct":14},"C","生产服务期",{"key":22,"text":23,"correct":24},"D","自然寿命期",true,"本题考查项目财务评价的指标体系。项目自然寿命期指项目从开始建设到项目主要固定资产报废所经历的时间，它包括项目建设期加上项目建成后投产或交付使用后的生产服务期。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 农业经济","经济金融",0]