[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-945006":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},945006,669,3,"判断题","如因设计、结构、外部环境等因素发生变化确需修改的，修改后的专项方案应当重新审核、论证。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"建筑架子工","建筑工程",0]