[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-944848":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},944848,669,2,"多选题","附着升降脚手架应在下列阶段进行检查与验收（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","首次安装完毕",true,{"key":16,"text":17,"correct":14},"B","提升或下降前",{"key":19,"text":20,"correct":21},"C","使用中",false,{"key":23,"text":24,"correct":14},"D","提升、下降到位，投入使用前","ABD","",{"id":6,"name":28,"category":29,"favorite":30},"建筑架子工","建筑工程",0]