[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-943418":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},943418,666,3,"判断题","临时用电工程必须经编制、审核、批准部门和使用单位共同验收合格后方可投入使用。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"",{"id":6,"name":21,"category":22,"favorite":23},"建筑电工","建筑工程",0]