[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-942978":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},942978,666,2,"多选题","我省施工现场临时用电总体目标应当做到:在施工现场专用的中性点直接接地的电力线路中必须采用TN-S接零保护系统、( )等。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","配电箱和开关箱合格率应达到100%",true,{"key":16,"text":17,"correct":14},"B","用电设备配备应设置专用的开关箱,实行“一机一闸一漏一箱”制",{"key":19,"text":20,"correct":14},"C","施工现场临时用电必须编制专项施工方案",{"key":22,"text":23,"correct":14},"D","安装、维修或拆除临时用电工程必须由专业电工完成",{"key":25,"text":26,"correct":14},"E","建立安全技术档案","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"建筑电工","建筑工程",0]