[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-942866":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},942866,666,2,"多选题","停、送电作业必须采取以下措施是：需停电的设备或线路必须在前一级配电装置中将相应电源开关分闸断电，并悬挂醒目的停电标志牌，必要时还可加挂接地线；( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","停、送电指令必须由同一人下达",true,{"key":16,"text":17,"correct":14},"B","送电前必须先行拆除加挂接地线",{"key":19,"text":20,"correct":14},"C","停、送电操作必须有两人进行，一人操作，一人监护",{"key":22,"text":23,"correct":14},"D","穿戴绝缘防护用品",{"key":25,"text":26,"correct":14},"E","使用电工绝缘工具","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"建筑电工","建筑工程",0]