[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-942738":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},942738,666,1,"单选题","设备总用量在 ( ) 及以上时需编制临时用电施工组织设计。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","50kw",true,{"key":16,"text":17,"correct":18},"B","100kw",false,{"key":20,"text":21,"correct":18},"C","150kw",{"key":23,"text":24,"correct":18},"D","250 kw","",{"id":6,"name":27,"category":28,"favorite":29},"建筑电工","建筑工程",0]