[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-942466":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},942466,666,1,"单选题","检修高压电动机时。下列哪种行为错误？",[11,15,18],{"key":12,"text":13,"correct":14},"A","先实施停电安全措施,再在高压电动机及其附属装置的回路上进行检修工作。",false,{"key":16,"text":17,"correct":14},"B","检修工作终结,需通电实验高压电动机及其启动装置时,先让全部工作人员撤离现场,再送电试运转。",{"key":19,"text":20,"correct":21},"C","在运行的高压电动机的接地线上进行检修工作。",true,"",{"id":6,"name":24,"category":25,"favorite":26},"建筑电工","建筑工程",0]