[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-942457":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},942457,666,1,"单选题","按照《施工现场临时用电安全技术规范》JGJ46—2005的规定,施工现场临时用电设备在( )台及以上,或设备容量在50KW及以上者,应编制组织设计。临时用电组织设计变更时,必须履行“编制.审核.批准”程序,由电气工程技术人员组织编制,经相关部门审核及具有法人资格企业的技术负责人批准后实施。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","2",{"key":19,"text":20,"correct":14},"C","3",{"key":22,"text":23,"correct":24},"D","5",true,"",{"id":6,"name":27,"category":28,"favorite":29},"建筑电工","建筑工程",0]