[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-942175":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},942175,664,2,"多选题","手动滑降试验要求是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","吊栏内均匀布置额定载荷",true,{"key":16,"text":17,"correct":14},"B","将吊栏升高到小于2m处",{"key":19,"text":20,"correct":14},"C","两名操作人员同时操作手动下降装置",{"key":22,"text":23,"correct":14},"D","下降应平稳可靠,下降速度不应大于1","ABCD","",{"id":6,"name":27,"category":28,"favorite":29},"高处作业吊篮安装拆卸工","建筑工程",0]