[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-942118":3},{"question":4,"library":23},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":22},942118,664,1,"单选题","安全技术交底应当采用书面形式,交底后( )应当签字确认。",[11,15,18],{"key":12,"text":13,"correct":14},"A","作业人员",false,{"key":16,"text":17,"correct":14},"B","项目技术员",{"key":19,"text":20,"correct":21},"C","双方",true,"",{"id":6,"name":24,"category":25,"favorite":26},"高处作业吊篮安装拆卸工","建筑工程",0]