[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-104059":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},104059,66,2,"多选题","下列各项属于旅游景区总体规划成果的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","图件",true,{"key":16,"text":17,"correct":14},"B","规划文本",{"key":19,"text":20,"correct":21},"C","规划设计说明书",false,{"key":23,"text":24,"correct":14},"D","图纸比例",{"key":26,"text":27,"correct":14},"E","附件","ABDE","旅游景区总体规划的成果要求有：①规划文本；②图件，包括旅游景区区位图、综合现状图、旅游市场分析图、旅游资源评价图、总体规划图、道路交通规划图、功能分区图等其他专业规划图、近期建设规划图等；③附件，包括规划说明和其他基础资料等；④图纸比例，可根据功能需要与可能确定。C项为旅游景区修建性详细规划的成果要求。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 旅游经济","经济金融",0]