[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-103768":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},103768,66,2,"多选题","一般来说，投资的可行性研究的工作流程分为（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","投资机会研究",true,{"key":16,"text":17,"correct":14},"B","初步可行性研究和最终可行性研究",{"key":19,"text":20,"correct":14},"C","编写研究结果报告",{"key":22,"text":23,"correct":14},"D","评价和决定",{"key":25,"text":26,"correct":27},"E","对项目进行验收",false,"ABCD","E项，对项目进行验收是项目建设完成后的工作。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 旅游经济","经济金融",0]