[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-103665":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},103665,66,1,"单选题","旅游景区规划的评审人员应由（ ）确定。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","旅游景区",false,{"key":16,"text":17,"correct":14},"B","规划委托方与上一级旅游行政主管部门",{"key":19,"text":20,"correct":14},"C","规划委托方",{"key":22,"text":23,"correct":24},"D","规划委托方与当地旅游行政主管部门",true,"旅游发展规划的评审人员由规划委托方与上一级旅游行政主管部门商定。旅游景区规划的评审人员由规划委托方与当地旅游行政主管部门确定。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 旅游经济","经济金融",0]