[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-103516":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},103516,66,1,"单选题","（ ）是指以基期成本费用水平为基础，结合预算业务量水平及有关降低成本的措施，通过调整原有费用项目而编制预算的方法。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","固定预算",false,{"key":16,"text":17,"correct":14},"B","弹性预算",{"key":19,"text":20,"correct":21},"C","增量预算",true,{"key":23,"text":24,"correct":14},"D","零基预算","增量预算，是指以基期成本费用水平为基础，结合预算业务量水平及有关降低成本的措施，通过调整原有费用项目而编制预算的方法。增量预算方法比较简单，但它是以过去的水平为基础，实际上就是承认过去是合理的，无须改进。因为不加分析地保留或接受原有的成本项目，可能使原来不合理的费用继续开支而得不到控制，形成不必要开支的合理化，造成预算上的浪费。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 旅游经济","经济金融",0]