[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-102805":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},102805,66,1,"单选题","投资机会研究阶段的花费一般约占项目投资总额的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0.2%～1%",true,{"key":16,"text":17,"correct":18},"B","1%～3%",false,{"key":20,"text":21,"correct":18},"C","0.25%～1.5%",{"key":23,"text":24,"correct":18},"D","2%～5%","B项是最终可行性研究费用占项目投资总额的比例；C项是初步可行性研究费用占项目投资总额的比例。",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 旅游经济","经济金融",0]