[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-102782":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},102782,66,1,"单选题","投资回收期是指以项目的（ ）抵偿投资额所需要的时间长度。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","净收入",false,{"key":16,"text":17,"correct":18},"B","净现金流量",true,{"key":20,"text":21,"correct":14},"C","税前利润",{"key":23,"text":24,"correct":14},"D","毛收入","投资回收期（RPI）是指以项目的净现金流量抵偿全部投资所需要的时间长度。其计算公式为：",{"id":6,"name":27,"category":28,"favorite":29},"(中级) 旅游经济","经济金融",0]