[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1079881":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1079881,643,1,"单选题","在计划完成后进行的评价性控制是",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","前馈控制",false,{"key":16,"text":17,"correct":14},"B","现场控制",{"key":19,"text":20,"correct":14},"C","预防控制",{"key":22,"text":23,"correct":24},"D","反馈控制",true,"",{"id":6,"name":27,"category":28,"favorite":29},"(自考)护理管理学","医药卫生",0]