[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-52":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":702},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,52,50,2598,[13,38,53,68,83,98,112,127,141,156,170,185,199,214,229,243,257,271,286,301,315,329,343,357,371,386,400,412,427,441,456,469,483,497,510,524,538,552,566,581,595,609,623,637,651,664,678,688],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},94235,2,"多选题","房地产市场风险大，房地产市场风险来自( )。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","政策性风险",true,{"key":24,"text":25,"correct":22},"B","在预售情况下按期交房的风险",{"key":27,"text":28,"correct":22},"C","财务风险",{"key":30,"text":31,"correct":32},"D","结构性供求均衡的风险",false,{"key":34,"text":35,"correct":22},"E","开发建设周期长引起的内外风险","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},94236,"从建筑产品供给者角度看，建筑市场的风险表现在()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"定价风险",{"key":24,"text":45,"correct":32},"价格与质量的矛盾",{"key":27,"text":47,"correct":32},"价格与交货时间的矛盾",{"key":30,"text":49,"correct":22},"生产风险",{"key":34,"text":51,"correct":32},"预付款风险","AD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},94237,"为了避免工程建设市场的不均衡和市场波动造成的负面影响，政府对于工程建设市场监管的主要内容和手段主要包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"市场准入管理",{"key":24,"text":60,"correct":22},"工程项目审批管理",{"key":27,"text":62,"correct":32},"加强个人诚信教育",{"key":30,"text":64,"correct":22},"“双随机-公开”监管",{"key":34,"text":66,"correct":32},"完善个人守信激励和失信惩戒机制","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},94238,"下列政府投资项目中，可以按照国家有关规定简化需要报批的文件和审批程序的有( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"相关规划中已经明确的项目",{"key":24,"text":75,"correct":32},"投资规模较大的政府投资项目",{"key":27,"text":77,"correct":22},"部分扩建、改建项目",{"key":30,"text":79,"correct":22},"建设内容单一、技术方案简单的项目",{"key":34,"text":81,"correct":22},"应对自然灾害需要紧急建设的项目","ACDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},94239,"生产准备的主要工作内容有( )。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"组建生产管理机构",{"key":24,"text":90,"correct":22},"招聘和培训生产人员",{"key":27,"text":92,"correct":32},"办理竣工验收手续",{"key":30,"text":94,"correct":22},"落实原材料的来源",{"key":34,"text":96,"correct":22},"组织工装的制造或订货","ABDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":67,"analysis":37},94240,"下列文件中，属于政府投资项目审批内容的有( )。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"项目建议书",{"key":24,"text":105,"correct":22},"可行性研究报告",{"key":27,"text":107,"correct":32},"项目招标文件",{"key":30,"text":109,"correct":22},"项目初步设计",{"key":34,"text":111,"correct":32},"项目后评价报告",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},94241,"下列属于划拨建设用地使用权范围的是( )。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"城市公益事业用地",{"key":24,"text":119,"correct":32},"旅游用地",{"key":27,"text":121,"correct":22},"危旧房改造区居民安置用房",{"key":30,"text":123,"correct":22},"国家重点扶持的水利项目用地",{"key":34,"text":125,"correct":32},"商品房建设用地","ACD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":67,"analysis":37},94242,"住宅房屋首先要合理确定平立面参数，主要包括()。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"合理确定层高和层数",{"key":24,"text":134,"correct":22},"正确设计房屋的长和宽",{"key":27,"text":136,"correct":32},"合理确定房屋外观造型",{"key":30,"text":138,"correct":22},"合理确定户型和居住面积",{"key":34,"text":140,"correct":32},"室外地坪标高",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},94243,"房地产开发项目决策的目的是选择具体的投资项目，具体包括( )。",[145,147,149,151,153],{"key":20,"text":146,"correct":32},"市场调研",{"key":24,"text":148,"correct":22},"市场分析",{"key":27,"text":150,"correct":22},"财务评价",{"key":30,"text":152,"correct":22},"项目决策",{"key":34,"text":154,"correct":32},"项目实施","BCD",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":97,"analysis":37},94244,"房地产开发项目在工程开工前，除完成勘察设计、规划报建、相关行政许可等工作外，还应为项目开工进行各种准备，包括()。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"组织准备",{"key":24,"text":163,"correct":22},"现场准备",{"key":27,"text":165,"correct":32},"技术准备",{"key":30,"text":167,"correct":22},"物资和资金准备",{"key":34,"text":169,"correct":22},"销售准备",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},94245,"委托规划设计规划设计的主要控制指标（ ）",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"建筑间距",{"key":24,"text":177,"correct":32},"总用地面积",{"key":27,"text":179,"correct":32},"总建筑面积",{"key":30,"text":181,"correct":32},"总户数",{"key":34,"text":183,"correct":22},"居住人口密度","AE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":82,"analysis":37},94246,"下列影响房地产供给的因素中，能增加房地产供给量的有( )。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"当前该类房地产价格水平较高",{"key":24,"text":192,"correct":32},"该类房地产的开发成本上升",{"key":27,"text":194,"correct":22},"该类房地产的开发技术水平提高",{"key":30,"text":196,"correct":22},"该类房地产的开发建设水平提升",{"key":34,"text":198,"correct":22},"该种房地产的开发建设成本减少",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},94247,"下列属于建筑产品计价特点的有( )。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"单价计价",{"key":24,"text":206,"correct":32},"批量计价",{"key":27,"text":208,"correct":32},"一次计价",{"key":30,"text":210,"correct":22},"多次计价",{"key":34,"text":212,"correct":22},"分部组合计价","ADE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},94248,"对于生产性项目，建设实施阶段的工作内容有( )。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"勘察设计",{"key":24,"text":221,"correct":22},"建设准备",{"key":27,"text":223,"correct":22},"施工安装",{"key":30,"text":225,"correct":22},"生产准备工作",{"key":34,"text":227,"correct":32},"竣工验收","ABCD",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":36,"analysis":37},94249,"下列属于申请商品房预售许可证基本条件的有( )。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"已交付全部土地使用权出让金，取得土地使用权证书",{"key":24,"text":236,"correct":22},"持有建设工程规划许可证",{"key":27,"text":238,"correct":22},"已经确定施工进度和竣工交付日期",{"key":30,"text":240,"correct":32},"房屋已经竣工的材料",{"key":34,"text":242,"correct":22},"取得商品房预售许可证明",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":67,"analysis":37},94250,"房地产开发项目工程设计的管理模式包括（）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"业主直接管理模式",{"key":24,"text":250,"correct":22},"业主委托咨询公司代表业主进行设计管理模式",{"key":27,"text":252,"correct":32},"业主委托建筑企业代表业主进行设计管理模式",{"key":30,"text":254,"correct":22},"业主委托项目（工程）管理管理模式",{"key":34,"text":256,"correct":32},"业主委托监理管理管理模式",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":270,"analysis":37},94251,"下列属于工程建设领域诚信体系建设内容的有（ ）。",[261,263,265,267,268],{"key":20,"text":262,"correct":22},"工程建设市场信用法规制度建设",{"key":24,"text":264,"correct":22},"建筑市场各方主体和从业人员信用标准制定",{"key":27,"text":266,"correct":32},"推进个人信用记录建设",{"key":30,"text":66,"correct":32},{"key":34,"text":269,"correct":22},"开展工程质量诚信建设","ABE",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},94252,"以下属于施工图审查机构对施工图审查内容的有（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":32},"技术上是否可行和经济上是否合理",{"key":24,"text":278,"correct":22},"是否符合工程建设强制性标准",{"key":27,"text":280,"correct":22},"地基基础和主体结构的安全性",{"key":30,"text":282,"correct":22},"是否符合民用建筑节能强制性标准",{"key":34,"text":284,"correct":22},"勘察设计企业和注册执业人员以及相关人员是否按规定在施工图上加盖相应的图章和签字","BCDE",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":300,"analysis":37},94253,"重大工程和技术复杂工程的设计阶段有（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"初步设计阶段",{"key":24,"text":293,"correct":22},"技术设计阶段",{"key":27,"text":295,"correct":22},"施工图设计阶段",{"key":30,"text":297,"correct":32},"任务书设计阶段",{"key":34,"text":299,"correct":32},"规划设计阶段","ABC",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":228,"analysis":37},94254,"在工程项目开工建设前要切实做好各项准备工作，主要有（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"征地、拆迁和场地平整",{"key":24,"text":308,"correct":22},"完成施工用水、电、通信、道路等接通工作",{"key":27,"text":310,"correct":22},"组织招标，选择工程监理单位、施工单位及设备、材料供应商",{"key":30,"text":312,"correct":22},"办理工程质量监督和施工许可手续",{"key":34,"text":314,"correct":32},"组建生产管理机构，制定管理有关制度和规定",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":36,"analysis":37},94255,"非政府投资项目核准时，项目核准机关需要审查的内容有（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"是否危害经济安全、社会安全、生态安全等国家安全",{"key":24,"text":322,"correct":22},"是否符合相关发展建设规划",{"key":27,"text":324,"correct":22},"是否合理开发并有效利用资源",{"key":30,"text":326,"correct":32},"是否做到三大目标控制",{"key":34,"text":328,"correct":22},"是否对重大公共利益产生不利影响",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":285,"analysis":37},94256,"申请领取施工许可证，应当具备（ ）条件。",[333,335,337,339,341],{"key":20,"text":334,"correct":32},"已组建项目监理机构",{"key":24,"text":336,"correct":22},"已办理建筑工程用地批准手续",{"key":27,"text":338,"correct":22},"已经确定建筑施工企业",{"key":30,"text":340,"correct":22},"依法应当办理建设工程规划许可证的，已经取得建设工程规划许可证",{"key":34,"text":342,"correct":22},"有保证工程质量和安全的具体措施",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":67,"analysis":37},94257,"在工程经济分析中，作为衡量资金时间价值的绝对尺度，利息是指()。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"占用资金所付的代价",{"key":24,"text":350,"correct":22},"放弃使用资金所得的补偿",{"key":27,"text":352,"correct":32},"考虑通货膨胀所得的补偿",{"key":30,"text":354,"correct":22},"资金的一种机会成本",{"key":34,"text":356,"correct":32},"投资者的一种收益",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":300,"analysis":37},94258,"下列关于现金流量图的画法，描述正确的是( )。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"画一条水平线表示时间，时间单位以计息期为准",{"key":24,"text":364,"correct":22},"箭头与时间轴的交点表示现金流量发生的时间",{"key":27,"text":366,"correct":22},"箭头向上的线段表示现金流入",{"key":30,"text":368,"correct":32},"箭头向下的线段表示现金流入",{"key":34,"text":370,"correct":32},"箭头长短与现金流量值无关",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":385,"analysis":37},94259,"下列因素中，影响资金等值计算的是( )。",[375,377,379,381,383],{"key":20,"text":376,"correct":32},"资产负债率",{"key":24,"text":378,"correct":22},"资金额大小",{"key":27,"text":380,"correct":32},"内部收益率",{"key":30,"text":382,"correct":22},"资金发生时间",{"key":34,"text":384,"correct":22},"折现率大小","BDE",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":67,"analysis":37},94260,"用现金流量图表示现金流量的三要素有()。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"现金大小",{"key":24,"text":393,"correct":22},"方向",{"key":27,"text":395,"correct":32},"箭头",{"key":30,"text":397,"correct":22},"发生时间点",{"key":34,"text":399,"correct":32},"水平线",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":385,"analysis":37},94261,"下列建设项目评价指标中，属于项目财务盈利能力评价指标的有( )。",[404,406,407,408,410],{"key":20,"text":405,"correct":32},"利息备付率",{"key":24,"text":380,"correct":22},{"key":27,"text":376,"correct":32},{"key":30,"text":409,"correct":22},"净现值",{"key":34,"text":411,"correct":22},"投资回收期",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":426,"analysis":37},94262,"下列关于内部收益率的说法，正确的是( )。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"内部收益率是项目净现值等于零时的折现率",{"key":24,"text":419,"correct":32},"内部收益率是静态评价指标",{"key":27,"text":421,"correct":22},"内部收益率考虑了资金的时间价值",{"key":30,"text":423,"correct":32},"内部收益率计算受基准收益参数的影响",{"key":34,"text":425,"correct":22},"内部收益率能够直接衡量项目未回收投资的收益率","ACE",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":52,"analysis":37},94263,"某常规投资方案的基准收益率为10％，内部收益率为15％，则该方案( )。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"净现值大于零",{"key":24,"text":434,"correct":32},"不可行",{"key":27,"text":436,"correct":32},"净现值小于零",{"key":30,"text":438,"correct":22},"可行",{"key":34,"text":440,"correct":32},"无法判断是否可行",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":455,"analysis":37},94264,"下列关于偿债能力分析指标的说法中，错误的是( )。",[445,447,449,451,453],{"key":20,"text":446,"correct":32},"偿债能力分析指标有利息备付率、偿债备付率和资产负债率",{"key":24,"text":448,"correct":22},"偿债备付率属于动态评价指标",{"key":27,"text":450,"correct":32},"资产负债率属于静态评价指标",{"key":30,"text":452,"correct":32},"利息备付率越高，表明利息偿付的保障程度越高",{"key":34,"text":454,"correct":22},"偿债备付率越高，表明可用于还本付息的资金保障程度越低","BE",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":468,"analysis":37},94265,"某建设项目，当i1=12%时，净现值为450万元；当i2=15%时，净现值为－200万元，平均资金成本率为13.2%，基准收益率为10%，则该项目（ ）。",[460,462,463,464,466],{"key":20,"text":461,"correct":22},"内部收益率在12～15%之间",{"key":24,"text":436,"correct":32},{"key":27,"text":438,"correct":22},{"key":30,"text":465,"correct":32},"净年值小于零",{"key":34,"text":467,"correct":32},"净将来值小于零","AC",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":82,"analysis":37},94266,"下列评价方法中，可用于寿命期不同的互斥方案比选的方法有( )。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"年值法",{"key":24,"text":476,"correct":32},"内部收益率法",{"key":27,"text":478,"correct":22},"最小公倍数法",{"key":30,"text":480,"correct":22},"研究期法",{"key":34,"text":482,"correct":22},"费用年值法",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":67,"analysis":37},94267,"对寿命期相等的互斥方案，比选方法正确的有( )。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"各备选方案的净现值大于等于零，并且净现值越大，方案越优",{"key":24,"text":490,"correct":22},"各备选方案的净年值大于等于零，并且净年值越大，方案越优",{"key":27,"text":492,"correct":32},"各备选方案的内部收益率大于等于基准收益率，并且内部收益率越大，方案越优",{"key":30,"text":494,"correct":22},"各备选方案产生的效果相同，可用最小费用法比选，费用越小，方案越优",{"key":34,"text":496,"correct":32},"各备选方案的净现值率大于等于1，并且净现值率越大，方案越优",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":300,"analysis":37},94268,"下列建设项目评价指标中，可用于选择互斥投资方案的指标有( )。",[501,502,504,506,508],{"key":20,"text":409,"correct":22},{"key":24,"text":503,"correct":22},"增量内部收益率",{"key":27,"text":505,"correct":22},"净年值",{"key":30,"text":507,"correct":32},"投资利税率",{"key":34,"text":509,"correct":32},"总投资收益率",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":300,"analysis":37},94269,"投资项目敏感性分析的主要作用有( )。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"有助于鉴别敏感因素",{"key":24,"text":517,"correct":22},"提高决策的可靠性",{"key":27,"text":519,"correct":22},"降低投资的风险性",{"key":30,"text":521,"correct":32},"测算风险发生的概率",{"key":34,"text":523,"correct":32},"测算投资的盈利性",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":270,"analysis":37},94270,"下列分析方法中，可同时用于财务评价和国民经济评价的是()。",[528,530,532,534,536],{"key":20,"text":529,"correct":22},"单因素敏感性分析",{"key":24,"text":531,"correct":22},"多因素敏感性分析",{"key":27,"text":533,"correct":32},"线性盈亏平衡分析",{"key":30,"text":535,"correct":32},"非线性盈亏平衡分析",{"key":34,"text":537,"correct":22},"风险分析",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":300,"analysis":37},94271,"线性盈亏平衡分析中，在求产量的盈亏平衡点时，需要假定在一定时期内( )都保持一个确定的量值。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"固定成本",{"key":24,"text":545,"correct":22},"单位产品的销售价格",{"key":27,"text":547,"correct":22},"单位产品的变动成本",{"key":30,"text":549,"correct":32},"产品的需求量",{"key":34,"text":551,"correct":32},"年销售收益",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":228,"analysis":37},94272,"下列有关敏感性分析的说法中，正确的是( )。",[556,558,560,562,564],{"key":20,"text":557,"correct":22},"敏感性分析有助于帮助鉴别敏感因素，提高决策的准确性",{"key":24,"text":559,"correct":22},"敏感性分析可分为单因素敏感性分析和多因素敏感性分析",{"key":27,"text":561,"correct":22},"敏感性分析属于不确定性分析",{"key":30,"text":563,"correct":22},"判别敏感因素的方法有相对测定法和绝对测定法",{"key":34,"text":565,"correct":32},"敏感性分析能确定因素发生变化的可能性大小",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":580,"analysis":37},94273,"下列有关盈亏平衡分析和敏感性分析的说法中，正确的是( )。",[570,572,574,576,578],{"key":20,"text":571,"correct":32},"盈亏平衡分析可用于国民经济评价",{"key":24,"text":573,"correct":22},"敏感性分析可同时用于财务评价和国民经济评价",{"key":27,"text":575,"correct":22},"不确定性分析主要包括盈亏平衡分析和敏感性分析",{"key":30,"text":577,"correct":32},"盈亏平衡分析能够度量项目风险大小，能揭示产生项目风险的根源",{"key":34,"text":579,"correct":22},"敏感性分析不能说明不确定因素发生变动的可能性大小","BCE",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":213,"analysis":37},94274,"下列产品中，应选择( )作为价值工程的研究对象。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"结构复杂的产品",{"key":24,"text":588,"correct":32},"生产数量少的产品",{"key":27,"text":590,"correct":32},"用户意见少的产品",{"key":30,"text":592,"correct":22},"市场竞争激烈的产品",{"key":34,"text":594,"correct":22},"技术落后的产品",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":82,"analysis":37},94275,"价值工程中常用的方案创新方法主要有( )。",[599,601,603,605,607],{"key":20,"text":600,"correct":22},"哥顿法",{"key":24,"text":602,"correct":32},"统计分析方法",{"key":27,"text":604,"correct":22},"头脑风暴法",{"key":30,"text":606,"correct":22},"德尔菲法",{"key":34,"text":608,"correct":22},"专家检查法",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":426,"analysis":37},94276,"在价值工程活动中进行功能评价时，可用于确定功能重要性系数的方法有( )。",[613,615,617,619,621],{"key":20,"text":614,"correct":22},"强制打分法",{"key":24,"text":616,"correct":32},"排列图法",{"key":27,"text":618,"correct":22},"直接评分法",{"key":30,"text":620,"correct":32},"因素分析法",{"key":34,"text":622,"correct":22},"倍比法",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":300,"analysis":37},94277,"下列资金的时间价值产生原因，正确的说法有（ ）。",[627,629,631,633,635],{"key":20,"text":628,"correct":22},"通过资金运动可以使货币增值",{"key":24,"text":630,"correct":22},"承担风险",{"key":27,"text":632,"correct":22},"通货膨胀、货币贬值",{"key":30,"text":634,"correct":32},"只要有资金就会产生收益",{"key":34,"text":636,"correct":32},"产生现金流量的大小",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":650,"analysis":37},94278,"下列关于资金时间价值产生原因的说法，不正确的有()。",[641,643,645,647,649],{"key":20,"text":642,"correct":32},"通货膨胀，货币贬值",{"key":24,"text":644,"correct":22},"利润的生产需要时间",{"key":27,"text":646,"correct":22},"利润与时间成正比",{"key":30,"text":648,"correct":32},"资金运动，货币增值",{"key":34,"text":630,"correct":32},"BC",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":82,"analysis":37},94279,"下列投资方案评价方法中，不可以用于独立方案选择的有（）。",[655,657,658,660,662],{"key":20,"text":656,"correct":22},"净现值法",{"key":24,"text":476,"correct":32},{"key":27,"text":659,"correct":22},"差额净年值法",{"key":30,"text":661,"correct":22},"投资回收期法",{"key":34,"text":663,"correct":22},"追加投资收益率法",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":228,"analysis":37},94280,"建设项目财务评价与国民经济评价的区别主要有（）。",[668,670,672,674,676],{"key":20,"text":669,"correct":22},"评价的角度不同",{"key":24,"text":671,"correct":22},"采用的价格不同",{"key":27,"text":673,"correct":22},"效益和费用的含义不同",{"key":30,"text":675,"correct":22},"主要参数不同",{"key":34,"text":677,"correct":32},"评价的方法和基础不同",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":67,"analysis":37},94281,"下列评价指标中，适于建设项目财务盈利分析的有（）。",[682,683,685,686,687],{"key":20,"text":411,"correct":22},{"key":24,"text":684,"correct":22},"财务净现值",{"key":27,"text":376,"correct":32},{"key":30,"text":509,"correct":22},{"key":34,"text":405,"correct":32},{"id":689,"libraryId":5,"type":15,"typeLabel":16,"stem":690,"options":691,"answer":126,"analysis":37},94282,"依据《中华人民共和国环境影响评价法》，该项目应进行环境影响评价，这是对项目实施后可能造成的环境影响进行（）。",[692,694,696,698,700],{"key":20,"text":693,"correct":22},"评估",{"key":24,"text":695,"correct":32},"限制",{"key":27,"text":697,"correct":22},"分析",{"key":30,"text":699,"correct":22},"预测",{"key":34,"text":701,"correct":32},"调研",[703,707,710,713,716,718],{"id":704,"name":705,"category":7,"favorite":706},109,"发布证券研究报告业务",1,{"id":708,"name":709,"category":7,"favorite":8},30,"经济师",{"id":711,"name":712,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":714,"name":715,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":717,"category":7,"favorite":8},"(初级)保险专业",{"id":719,"name":720,"category":7,"favorite":8},51,"(初级)财政税收"]