[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-50":3},{"library":4,"page":9,"limit":9,"total":10,"questions":11,"related":727},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,50,2598,[12,37,52,65,80,95,109,123,137,152,167,182,196,211,225,239,253,268,282,297,311,325,340,355,370,385,399,412,426,439,453,467,481,495,509,520,529,542,556,570,584,599,613,628,642,656,670,684,698,713],{"id":13,"libraryId":5,"type":14,"typeLabel":15,"stem":16,"options":17,"answer":35,"analysis":36},94134,2,"多选题","下列房地产投资项目可行性研究报告的内容中，应在项目总说明中介绍的有 ( )。",[18,22,26,29,32],{"key":19,"text":20,"correct":21},"A","项目地理位置",false,{"key":23,"text":24,"correct":25},"B","项目背景",true,{"key":27,"text":28,"correct":25},"C","项目评估的目的",{"key":30,"text":31,"correct":21},"D","项目性质",{"key":33,"text":34,"correct":25},"E","项目参与者","BCE","",{"id":38,"libraryId":5,"type":14,"typeLabel":15,"stem":39,"options":40,"answer":51,"analysis":36},94135,"下列费用中，属于工程项目固定成本的有( )。",[41,43,45,47,49],{"key":19,"text":42,"correct":25},"折旧费",{"key":23,"text":44,"correct":25},"摊销费",{"key":27,"text":46,"correct":21},"外购原材料费",{"key":30,"text":48,"correct":21},"计件工资",{"key":33,"text":50,"correct":25},"职工福利费","ABE",{"id":53,"libraryId":5,"type":14,"typeLabel":15,"stem":54,"options":55,"answer":64,"analysis":36},94136,"工程项目的总成本费用包括( )。",[56,58,59,60,62],{"key":19,"text":57,"correct":25},"经营成本",{"key":23,"text":42,"correct":25},{"key":27,"text":44,"correct":25},{"key":30,"text":61,"correct":25},"利息支出",{"key":33,"text":63,"correct":21},"增值税","ABCD",{"id":66,"libraryId":5,"type":14,"typeLabel":15,"stem":67,"options":68,"answer":79,"analysis":36},94137,"建设项目环境影响报告书的内容应当包括( )",[69,71,73,75,77],{"key":19,"text":70,"correct":25},"建设项目概况",{"key":23,"text":72,"correct":25},"建设项目周围环境现状",{"key":27,"text":74,"correct":25},"对建设项目实施环境监测的建议",{"key":30,"text":76,"correct":21},"风险评价的结论",{"key":33,"text":78,"correct":25},"建设项目对环境可能造成影响的分析、预测和评估","ABCE",{"id":81,"libraryId":5,"type":14,"typeLabel":15,"stem":82,"options":83,"answer":94,"analysis":36},94138,"下列各项，属于房地产项目环境敏感区的有( )。",[84,86,88,90,92],{"key":19,"text":85,"correct":21},"高新技术开发区",{"key":23,"text":87,"correct":25},"海洋特别保护区",{"key":27,"text":89,"correct":21},"重工业地区",{"key":30,"text":91,"correct":25},"野生动物重要栖息地",{"key":33,"text":93,"correct":25},"文物保护单位","BDE",{"id":96,"libraryId":5,"type":14,"typeLabel":15,"stem":97,"options":98,"answer":64,"analysis":36},94139,"工程项目可行性研究报告中，环境影响评价的内容有( )。",[99,101,103,105,107],{"key":19,"text":100,"correct":25},"环境条件调查",{"key":23,"text":102,"correct":25},"项目生产对环境的影响",{"key":27,"text":104,"correct":25},"环境保护措施",{"key":30,"text":106,"correct":25},"环境保护投资",{"key":33,"text":108,"correct":21},"环境风险分析",{"id":110,"libraryId":5,"type":14,"typeLabel":15,"stem":111,"options":112,"answer":79,"analysis":36},94140,"工程项目可行性研究报告中，项目评价内容主要包括( )。",[113,115,117,119,121],{"key":19,"text":114,"correct":25},"财务评价",{"key":23,"text":116,"correct":25},"国民经济评价",{"key":27,"text":118,"correct":25},"环境影响评价",{"key":30,"text":120,"correct":21},"市场及拟建规模评价",{"key":33,"text":122,"correct":25},"社会评价",{"id":124,"libraryId":5,"type":14,"typeLabel":15,"stem":125,"options":126,"answer":51,"analysis":36},94141,"下列属于经济费用效益分析指标的有( )。",[127,129,131,133,135],{"key":19,"text":128,"correct":25},"经济净现值",{"key":23,"text":130,"correct":25},"经济内部收益率",{"key":27,"text":132,"correct":21},"影子价格",{"key":30,"text":134,"correct":21},"折现率",{"key":33,"text":136,"correct":25},"经济效益费用比",{"id":138,"libraryId":5,"type":14,"typeLabel":15,"stem":139,"options":140,"answer":151,"analysis":36},94142,"在进行工程项目国民经济评价时，国民经济内部的转移支付主要内容有( )。",[141,143,145,147,149],{"key":19,"text":142,"correct":25},"税收",{"key":23,"text":144,"correct":21},"利润",{"key":27,"text":146,"correct":25},"国内银行借款利息",{"key":30,"text":148,"correct":25},"国家和地方政府给予项目的补贴",{"key":33,"text":150,"correct":21},"国外银行借款利息","ACD",{"id":153,"libraryId":5,"type":14,"typeLabel":15,"stem":154,"options":155,"answer":166,"analysis":36},94143,"下列关于财务评价与国民经济评价的主要区别，说法不正确的是( )。",[156,158,160,162,164],{"key":19,"text":157,"correct":21},"国民经济评价称为“宏观评价”",{"key":23,"text":159,"correct":21},"财务评价只计算项目直接发生的效益与费用",{"key":27,"text":161,"correct":21},"国民经济评价对项目引起的间接效益与费用，即外部效果，也要进行计算和分析",{"key":30,"text":163,"correct":25},"国民经济评价采用现行价格",{"key":33,"text":165,"correct":25},"财务评价对投入物和产出物采用根据机会成本和供求关系确定的影子价格","DE",{"id":168,"libraryId":5,"type":14,"typeLabel":15,"stem":169,"options":170,"answer":181,"analysis":36},94144,"房地产开发项目可行性研究报告中，需要编制开发建设计划，其中前期开发计划包括( )。",[171,173,175,177,179],{"key":19,"text":172,"correct":25},"项目创意",{"key":23,"text":174,"correct":25},"可行性研究",{"key":27,"text":176,"correct":25},"获取开工许可证",{"key":30,"text":178,"correct":21},"单项工程开工时间",{"key":33,"text":180,"correct":21},"单项工程竣工时间","ABC",{"id":183,"libraryId":5,"type":14,"typeLabel":15,"stem":184,"options":185,"answer":64,"analysis":36},94145,"可行性研究通常包含的主要内容有( )。",[186,188,190,192,194],{"key":19,"text":187,"correct":25},"项目总说明",{"key":23,"text":189,"correct":25},"市场需求情况",{"key":27,"text":191,"correct":25},"技术方案",{"key":30,"text":193,"correct":25},"投资估算",{"key":33,"text":195,"correct":21},"法律可行性",{"id":197,"libraryId":5,"type":14,"typeLabel":15,"stem":198,"options":199,"answer":210,"analysis":36},94146,"工程项目社会评价适用于( )的投资项目。",[200,202,204,206,208],{"key":19,"text":201,"correct":25},"社会因素较为复杂",{"key":23,"text":203,"correct":25},"社会影响较为久远",{"key":27,"text":205,"correct":21},"社会发展较快地区",{"key":30,"text":207,"correct":25},"社会效益较为显著",{"key":33,"text":209,"correct":25},"社会矛盾较为突出","ABDE",{"id":212,"libraryId":5,"type":14,"typeLabel":15,"stem":213,"options":214,"answer":64,"analysis":36},94147,"工程项目可行性研究分为四个阶段，包括（ ）。",[215,217,219,221,223],{"key":19,"text":216,"correct":25},"投资机会研究",{"key":23,"text":218,"correct":25},"初步可行性研究",{"key":27,"text":220,"correct":25},"详细可行性研究",{"key":30,"text":222,"correct":25},"项目评估决策",{"key":33,"text":224,"correct":21},"项目投资决策",{"id":226,"libraryId":5,"type":14,"typeLabel":15,"stem":227,"options":228,"answer":79,"analysis":36},94149,"下列属于国民经济评价与财务评价区别的有（）。",[229,231,233,235,237],{"key":19,"text":230,"correct":25},"评价角度不同",{"key":23,"text":232,"correct":25},"效益和费用含义及划分范围不同",{"key":27,"text":234,"correct":25},"评价采用的价格不同",{"key":30,"text":236,"correct":21},"评价的基础工作不同",{"key":33,"text":238,"correct":25},"主要参数不同",{"id":240,"libraryId":5,"type":14,"typeLabel":15,"stem":241,"options":242,"answer":252,"analysis":36},94150,"工程项目社会评价的主要内容包括( )。",[243,244,246,248,250],{"key":19,"text":114,"correct":21},{"key":23,"text":245,"correct":25},"社会影响分析",{"key":27,"text":247,"correct":25},"社会风险分析",{"key":30,"text":249,"correct":25},"互适性分析",{"key":33,"text":251,"correct":21},"市场分析","BCD",{"id":254,"libraryId":5,"type":14,"typeLabel":15,"stem":255,"options":256,"answer":267,"analysis":36},94151,"社会评价的基本步骤包括( )。",[257,259,261,263,265],{"key":19,"text":258,"correct":25},"调查社会资料",{"key":23,"text":260,"correct":25},"识别社会因素",{"key":27,"text":262,"correct":21},"分析社会效益",{"key":30,"text":264,"correct":25},"论证比选方案",{"key":33,"text":266,"correct":21},"方案优化","ABD",{"id":269,"libraryId":5,"type":14,"typeLabel":15,"stem":270,"options":271,"answer":181,"analysis":36},94152,"在对互斥方案进行直接比选时必须具备的可比条件有()。",[272,274,276,278,280],{"key":19,"text":273,"correct":25},"被比较方案的费用及效益计算口径一致",{"key":23,"text":275,"correct":25},"被比较方案具有相同的计算期",{"key":27,"text":277,"correct":25},"被比较方案现金流量具有相同的时间单位",{"key":30,"text":279,"correct":21},"被比较方案的投资额相同或相近",{"key":33,"text":281,"correct":21},"被比较方案具有相同的不确定因素",{"id":283,"libraryId":5,"type":14,"typeLabel":15,"stem":284,"options":285,"answer":296,"analysis":36},94153,"下列风险中，属于房地产投资非系统风险的是()。",[286,288,290,292,294],{"key":19,"text":287,"correct":21},"变现风险",{"key":23,"text":289,"correct":25},"比较风险",{"key":27,"text":291,"correct":25},"时间风险",{"key":30,"text":293,"correct":25},"持有期风险",{"key":33,"text":295,"correct":25},"收益现金流风险","BCDE",{"id":298,"libraryId":5,"type":14,"typeLabel":15,"stem":299,"options":300,"answer":79,"analysis":36},94154,"对于需要进行比较的多个互斥方案，若采用差额净现值法，则下列表述中正确的是（）。",[301,303,305,307,309],{"key":19,"text":302,"correct":25},"差额净现值只能用来检验差额投资的效果，或者说是相对效果",{"key":23,"text":304,"correct":25},"在采用差额净现值法对方案进行比较时，通常也先设有一个零投资方案，并先假设零投资方案为临时最优方案",{"key":27,"text":306,"correct":25},"差额净现值大于零只表明增加的投资是合理的，并不表明全部投资是合理的",{"key":30,"text":308,"correct":21},"差额净现值大于零不仅表明增加的投资是合理的，而且表明全部投资是合理的",{"key":33,"text":310,"correct":25},"用差额净现值法对互斥方案比选的结论也往往与净现值率法比选的结论不一致",{"id":312,"libraryId":5,"type":14,"typeLabel":15,"stem":313,"options":314,"answer":181,"analysis":36},94155,"在房地产投资项目线性盈亏平衡分析中，主要的假设条件有()。",[315,317,319,321,323],{"key":19,"text":316,"correct":25},"房地产开发量在预期内全部售出",{"key":23,"text":318,"correct":25},"房地产销售均价在预期内保持不变",{"key":27,"text":320,"correct":25},"房地产产品的单位变动成本在预期内保持不变",{"key":30,"text":322,"correct":21},"房地产开发企业在预期内没有新的投资项目",{"key":33,"text":324,"correct":21},"土地出让价格在预期内不受市场变化的影响",{"id":326,"libraryId":5,"type":14,"typeLabel":15,"stem":327,"options":328,"answer":339,"analysis":36},94156,"下列关于房地产投资风险的表述中，正确的有（）。",[329,331,333,335,337],{"key":19,"text":330,"correct":25},"房地产投资风险是客观存在的，不以人的意志为转移",{"key":23,"text":332,"correct":21},"房地产风险具有潜在性，他不是显现在表面的东西，所以风险是不可认识的",{"key":27,"text":334,"correct":25},"房地产投资风险不但存在着风险损失，同时也存在着风险报酬",{"key":30,"text":336,"correct":25},"同一风险事件按对不同的投资者会产生不同的风险",{"key":33,"text":338,"correct":25},"同一投资者由于其决策或采用的策略不同，会面临不同的风险结果","ACDE",{"id":341,"libraryId":5,"type":14,"typeLabel":15,"stem":342,"options":343,"answer":354,"analysis":36},94157,"对互斥型房地产投资方案进行直接比选时，比较方案之间必须具备的可比性条件有()。",[344,346,348,350,352],{"key":19,"text":345,"correct":21},"各方案均为房地产开发投资项目",{"key":23,"text":347,"correct":21},"各方案有相同的投资收益率",{"key":27,"text":349,"correct":25},"各方案费用和效益的计算口径一致",{"key":30,"text":351,"correct":25},"各方案有相同的计算期",{"key":33,"text":353,"correct":25},"各方案现金流量有相同的时间单位","CDE",{"id":356,"libraryId":5,"type":14,"typeLabel":15,"stem":357,"options":358,"answer":369,"analysis":36},94158,"某投资者拥有1000万元的资金，甲、乙、丙、丁四个独立投资方案所需要的投资分别为500万元、300万元、600万元和680万元。该投资者完全用自有资金投资的可选方案有()。",[359,361,363,365,367],{"key":19,"text":360,"correct":25},"甲+乙",{"key":23,"text":362,"correct":21},"甲+丙",{"key":27,"text":364,"correct":21},"甲+丁",{"key":30,"text":366,"correct":25},"乙+丁",{"key":33,"text":368,"correct":25},"乙+丙","ADE",{"id":371,"libraryId":5,"type":14,"typeLabel":15,"stem":372,"options":373,"answer":384,"analysis":36},94159,"出售型房地产开发投资的不确定因素有()。",[374,376,378,380,382],{"key":19,"text":375,"correct":25},"建安工程费",{"key":23,"text":377,"correct":21},"空置率",{"key":27,"text":379,"correct":21},"租金水平",{"key":30,"text":381,"correct":25},"开发周期",{"key":33,"text":383,"correct":21},"房地产开发贷款利率","AD",{"id":386,"libraryId":5,"type":14,"typeLabel":15,"stem":387,"options":388,"answer":79,"analysis":36},94160,"房地产投资风险的特征包括（）。",[389,391,393,395,397],{"key":19,"text":390,"correct":25},"客观性",{"key":23,"text":392,"correct":25},"不确定性",{"key":27,"text":394,"correct":25},"潜在性",{"key":30,"text":396,"correct":21},"周期性",{"key":33,"text":398,"correct":25},"相关性",{"id":400,"libraryId":5,"type":14,"typeLabel":15,"stem":401,"options":402,"answer":181,"analysis":36},94161,"下列选项中属于房地产投资系统风险的有（）。",[403,405,407,409,411],{"key":19,"text":404,"correct":25},"通货膨胀风险",{"key":23,"text":406,"correct":25},"市场供求风险",{"key":27,"text":408,"correct":25},"周期风险",{"key":30,"text":410,"correct":21},"资本价值风险",{"key":33,"text":291,"correct":21},{"id":413,"libraryId":5,"type":14,"typeLabel":15,"stem":414,"options":415,"answer":79,"analysis":36},94162,"投资项目可行性研究报告的作用有（）。",[416,418,420,422,424],{"key":19,"text":417,"correct":25},"为申请项目核准提供依据",{"key":23,"text":419,"correct":25},"为项目筹集建设资金提供依据",{"key":27,"text":421,"correct":25},"为项目考核和后评价提供依据",{"key":30,"text":423,"correct":21},"为项目营销提供依据",{"key":33,"text":425,"correct":25},"为规划设计工作提供依据",{"id":427,"libraryId":5,"type":14,"typeLabel":15,"stem":428,"options":429,"answer":181,"analysis":36},94163,"房地产投资风险识别的特点有（）。",[430,432,434,436,437],{"key":19,"text":431,"correct":25},"系统性",{"key":23,"text":433,"correct":25},"连续性",{"key":27,"text":435,"correct":25},"制度性",{"key":30,"text":394,"correct":21},{"key":33,"text":438,"correct":21},"可测性",{"id":440,"libraryId":5,"type":14,"typeLabel":15,"stem":441,"options":442,"answer":79,"analysis":36},94164,"下列关于敏感性分析的表述中，正确的有（）。",[443,445,447,449,451],{"key":19,"text":444,"correct":25},"项目对某种不确定因素的敏感程度，可表示为该因素按一定比例变化时引起项目指标的变化幅度（通常是列表表示）",{"key":23,"text":446,"correct":25},"敏感性分析可以判定不确定因素在什么范围内变化能是投资项目的经济效益情况为最好，在什么范围变化时，投资项目的经济效益情况最差等这类最乐观和最悲观真的边界条件或边界数值。",{"key":27,"text":448,"correct":25},"敏感性分析有单因素敏感性分析和多因素敏感性分析两种",{"key":30,"text":450,"correct":21},"敏感性分析只可用于对静态经济指标的分析，而不可用于动态经济指标的分析",{"key":33,"text":452,"correct":25},"敏感性分析既可用于对静态经济指标的分析，也可用于对动态经济指标的分析",{"id":454,"libraryId":5,"type":14,"typeLabel":15,"stem":455,"options":456,"answer":51,"analysis":36},94165,"不确定性分析包括（）。",[457,459,461,463,465],{"key":19,"text":458,"correct":25},"盈亏平衡分析",{"key":23,"text":460,"correct":25},"敏感性分析",{"key":27,"text":462,"correct":21},"需求分析",{"key":30,"text":464,"correct":21},"供给分析",{"key":33,"text":466,"correct":25},"风险分析",{"id":468,"libraryId":5,"type":14,"typeLabel":15,"stem":469,"options":470,"answer":181,"analysis":36},94166,"房地产投资项目比选，对投资者能起到的帮助有（）。",[471,473,475,477,479],{"key":19,"text":472,"correct":25},"有利于投资者把握最佳的投资机会",{"key":23,"text":474,"correct":25},"有利于投资者选择最佳的投资方案",{"key":27,"text":476,"correct":25},"能使投资者有限的资金得到相对安全和有效的利用",{"key":30,"text":478,"correct":21},"有利于提高投资者科学决策的能力，避免或减少投资失误",{"key":33,"text":480,"correct":21},"有利于增强投资者的市场竞争能力",{"id":482,"libraryId":5,"type":14,"typeLabel":15,"stem":483,"options":484,"answer":339,"analysis":36},94167,"房地产开发项目前期策划应遵循的原则有（ ）。",[485,487,489,491,493],{"key":19,"text":486,"correct":25},"约束性原则",{"key":23,"text":488,"correct":21},"求同性原则",{"key":27,"text":490,"correct":25},"差异性原则",{"key":30,"text":492,"correct":25},"系统性原则",{"key":33,"text":494,"correct":25},"预测性原则",{"id":496,"libraryId":5,"type":14,"typeLabel":15,"stem":497,"options":498,"answer":210,"analysis":36},94168,"房地产开发项目前期策划的主要内容有（ ）。",[499,501,503,505,507],{"key":19,"text":500,"correct":25},"环境分析",{"key":23,"text":502,"correct":25},"市场定位",{"key":27,"text":504,"correct":21},"营销策略",{"key":30,"text":506,"correct":25},"运行建议",{"key":33,"text":508,"correct":25},"经济评价",{"id":510,"libraryId":5,"type":14,"typeLabel":15,"stem":511,"options":512,"answer":296,"analysis":36},94169,"建设项目可行性研究包括（ ）等阶段。",[513,515,516,517,518],{"key":19,"text":514,"correct":21},"项目建议书",{"key":23,"text":216,"correct":25},{"key":27,"text":218,"correct":25},{"key":30,"text":220,"correct":25},{"key":33,"text":519,"correct":25},"项目评估和决策",{"id":521,"libraryId":5,"type":14,"typeLabel":15,"stem":522,"options":523,"answer":79,"analysis":36},94170,"下列属于国民经济评价与财务评价区别的有（ ）。",[524,525,526,527,528],{"key":19,"text":230,"correct":25},{"key":23,"text":232,"correct":25},{"key":27,"text":234,"correct":25},{"key":30,"text":236,"correct":21},{"key":33,"text":238,"correct":25},{"id":530,"libraryId":5,"type":14,"typeLabel":15,"stem":531,"options":532,"answer":541,"analysis":36},94171,"工程项目经济评价包括（ ）。",[533,535,536,537,539],{"key":19,"text":534,"correct":21},"环境效益评价",{"key":23,"text":114,"correct":25},{"key":27,"text":116,"correct":25},{"key":30,"text":538,"correct":21},"盈利能力分析",{"key":33,"text":540,"correct":21},"清偿能力分析","BC",{"id":543,"libraryId":5,"type":14,"typeLabel":15,"stem":544,"options":545,"answer":369,"analysis":36},94172,"下列关于国民经济评价与财务评价的说法，正确的有（ ）。",[546,548,550,552,554],{"key":19,"text":547,"correct":25},"财务评价是从财务角度考察货币收支、盈利状况及借款偿还能力，以确定投资行为的财务可行性",{"key":23,"text":549,"correct":21},"国民经济评价只计算项目直接发生的效益和费用",{"key":27,"text":551,"correct":21},"财务评价对投入物和产出物采用影子价格",{"key":30,"text":553,"correct":25},"国民经济评价采用由国家统一测定的影子汇率和社会折现率",{"key":33,"text":555,"correct":25},"国民经济评价可以在财务评价的基础上进行，也可以直接进行",{"id":557,"libraryId":5,"type":14,"typeLabel":15,"stem":558,"options":559,"answer":210,"analysis":36},94173,"下列内容属于初步可行性研究重点工作的有（ ）。",[560,562,564,566,568],{"key":19,"text":561,"correct":25},"分析投资机会研究结论，判断项目是否值得投资",{"key":23,"text":563,"correct":25},"确定的项目要领是否准确，是否需进行详细可行性研究",{"key":27,"text":565,"correct":21},"从技术、财务和社会经济等方面深入详细地分析项目建设的必要性、可能性和经济合理性",{"key":30,"text":567,"correct":25},"对于影响项目建设实施的一些关键问题进行专题研究",{"key":33,"text":569,"correct":25},"初选和审定项目实施方案",{"id":571,"libraryId":5,"type":14,"typeLabel":15,"stem":572,"options":573,"answer":384,"analysis":36},94174,"英国NEC合同文本中，关于主要选项条款的说法，错误的有( )。",[574,576,578,580,582],{"key":19,"text":575,"correct":25},"选项A适用于承包加酬金合同",{"key":23,"text":577,"correct":21},"选项B适用于综合单价计量承包",{"key":27,"text":579,"correct":21},"选项C适用于拟建工程范围在订立合同时还没有完全界定的情况",{"key":30,"text":581,"correct":25},"选项E适用于工程范围的界定已经明确的情况",{"key":33,"text":583,"correct":21},"选项F适用于施工管理承包",{"id":585,"libraryId":5,"type":14,"typeLabel":15,"stem":586,"options":587,"answer":598,"analysis":36},94175,"下列关于工程勘察合同履行中发包人主要义务的说法中，正确的有( )。",[588,590,592,594,596],{"key":19,"text":589,"correct":21},"符合专用合同条款约定的开始勘察条件的，发包人应提前14天向勘察人发出开始勘察通知",{"key":23,"text":591,"correct":25},"勘察服务期限自开始勘察通知中载明的开始勘察日期起计算",{"key":27,"text":593,"correct":21},"发包人接收勘察文件之后，必须组织专家会进行审查",{"key":30,"text":595,"correct":25},"发包人对于勘察文件的审查期限，自文件接收之日起不应超过l4天",{"key":33,"text":597,"correct":21},"勘察人应当组织勘察技术交底会","BD",{"id":600,"libraryId":5,"type":14,"typeLabel":15,"stem":601,"options":602,"answer":296,"analysis":36},94176,"在工程勘察合同履行中发生的下列情况，属勘察人违约的有( )。",[603,605,607,609,611],{"key":19,"text":604,"correct":21},"发包人停止履行合同",{"key":23,"text":606,"correct":25},"勘察人未经发包人同意擅自分包勘察任务",{"key":27,"text":608,"correct":25},"勘察文件不符合法律及合同约定",{"key":30,"text":610,"correct":25},"勘察人未按合同计划完成勘察，从而造成工程损失",{"key":33,"text":612,"correct":25},"勘察人无法履行合同",{"id":614,"libraryId":5,"type":14,"typeLabel":15,"stem":615,"options":616,"answer":627,"analysis":36},94177,"下列不属于建设工程合同的有( )。",[617,619,621,623,625],{"key":19,"text":618,"correct":21},"工程设计合同",{"key":23,"text":620,"correct":21},"工程勘察合同",{"key":27,"text":622,"correct":25},"工程咨询合同",{"key":30,"text":624,"correct":21},"工程施工合同",{"key":33,"text":626,"correct":25},"工程采购合同","CE",{"id":629,"libraryId":5,"type":14,"typeLabel":15,"stem":630,"options":631,"answer":64,"analysis":36},94178,"下列单位中，参与设计技术交底会的有( )。",[632,634,636,638,640],{"key":19,"text":633,"correct":25},"设计人",{"key":23,"text":635,"correct":25},"发包人",{"key":27,"text":637,"correct":25},"监理人",{"key":30,"text":639,"correct":25},"施工承包人",{"key":33,"text":641,"correct":21},"造价咨询单位",{"id":643,"libraryId":5,"type":14,"typeLabel":15,"stem":644,"options":645,"answer":252,"analysis":36},94179,"根据《标准施工招标文件》（2007年版），发包人在施工准备阶段的主要义务有( )。",[646,648,650,652,654],{"key":19,"text":647,"correct":21},"负责修建和管理施工所需的临时道路",{"key":23,"text":649,"correct":25},"组织设计交底",{"key":27,"text":651,"correct":25},"提供施工现场",{"key":30,"text":653,"correct":25},"办理取得出入施工场地的专用和临时道路的通行权",{"key":33,"text":655,"correct":21},"编制施工组织设计",{"id":657,"libraryId":5,"type":14,"typeLabel":15,"stem":658,"options":659,"answer":339,"analysis":36},94180,"关于施工阶段承包人施工安全责任的说法，正确的有( )。",[660,662,664,666,668],{"key":19,"text":661,"correct":25},"合同约定的安全施工措施费用应遵守规定，并包含在相关工作的合同价格中",{"key":23,"text":663,"correct":21},"由于发包人原因造成承包人人员的工伤事故，应由承包人承担责任",{"key":27,"text":665,"correct":25},"承包人因采取合同未约定安全施工措施增加的费用，由监理人商定或确定",{"key":30,"text":667,"correct":25},"承包人对分包人人员的工伤事故承担责任",{"key":33,"text":669,"correct":25},"承包人应按监理人的指示制定应对灾害的紧急预案，报送监理人审批",{"id":671,"libraryId":5,"type":14,"typeLabel":15,"stem":672,"options":673,"answer":296,"analysis":36},94181,"工程变更的范围和内容包括( )。",[674,676,678,680,682],{"key":19,"text":675,"correct":21},"取消合同中任何一项工作，被取消的工作转由发包人或其他人实施",{"key":23,"text":677,"correct":25},"改变合同中任何一项工作的质量或其他特性",{"key":27,"text":679,"correct":25},"改变合同工程的基线、标高、位置或尺寸",{"key":30,"text":681,"correct":25},"改变合同中任何一项工作的施工时间或改变已批准的施工工艺或顺序",{"key":33,"text":683,"correct":25},"为完成工程需要追加的额外工作",{"id":685,"libraryId":5,"type":14,"typeLabel":15,"stem":686,"options":687,"answer":267,"analysis":36},94182,"根据《标准施工招标文件》，下列事件中，承包人向发包人既可索赔工期又可索赔费用的有( )。",[688,690,692,694,696],{"key":19,"text":689,"correct":25},"发包人原因导致的工程缺陷和损失",{"key":23,"text":691,"correct":25},"承包人遇到不利物质条件",{"key":27,"text":693,"correct":21},"不可抗力停工期间的照管和后续清理",{"key":30,"text":695,"correct":25},"施工过程发现文物",{"key":33,"text":697,"correct":21},"承包人遇到异常恶劣的气候条件",{"id":699,"libraryId":5,"type":14,"typeLabel":15,"stem":700,"options":701,"answer":712,"analysis":36},94183,"根据《标准施工招标文件》（2007年版），履约担保的特点有()。",[702,704,706,708,710],{"key":19,"text":703,"correct":25},"担保期限自合同签订日起到签发工程移交证书日止",{"key":23,"text":705,"correct":25},"采用无条件担保方式",{"key":27,"text":707,"correct":21},"能快速解决承包方严重违约对施工的影响",{"key":30,"text":709,"correct":21},"能降低发包人合同风险",{"key":33,"text":711,"correct":21},"有助于加强发包人的履约责任心","AB",{"id":714,"libraryId":5,"type":14,"typeLabel":15,"stem":715,"options":716,"answer":296,"analysis":36},94184,"当工程具备( )等条件时，承包人即可向监理人报送竣工验收申请报告。",[717,719,721,723,725],{"key":19,"text":718,"correct":21},"监理人不同意列入缺陷责任期内完成的尾工工程",{"key":23,"text":720,"correct":25},"已按合同约定的内容和份数备齐了符合要求的竣工资料",{"key":27,"text":722,"correct":25},"监理人要求在竣工验收前应完成的其他工作",{"key":30,"text":724,"correct":25},"监理人要求提交的竣工验收资料清单",{"key":33,"text":726,"correct":25},"已按监理人要求编制了在缺陷责任期内完成的尾工工程和缺陷修补工作清单",[728,732,735,738,741,743],{"id":729,"name":730,"category":7,"favorite":731},109,"发布证券研究报告业务",1,{"id":733,"name":734,"category":7,"favorite":8},30,"经济师",{"id":736,"name":737,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":739,"name":740,"category":7,"favorite":8},49,"初级经济师",{"id":9,"name":742,"category":7,"favorite":8},"(初级)保险专业",{"id":744,"name":745,"category":7,"favorite":8},51,"(初级)财政税收"]