[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":571},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,5,50,2598,[13,34,46,58,67,79,91,103,115,126,137,149,159,169,178,187,199,210,222,230,242,254,266,274,283,295,303,315,327,336,348,360,370,379,388,398,410,418,427,439,451,463,475,487,499,511,523,535,547,559],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},90963,1,"单选题","采用修正总费用法计算索赔费用的计算公式为（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","索赔金额=直接费+间接费+利润",false,{"key":24,"text":25,"correct":22},"B","索赔金额=实际总费用-投标报价估算总费用",{"key":27,"text":28,"correct":29},"C","索赔金额=某项工作调整后的实际总费用-该项工作报价费用",true,{"key":31,"text":32,"correct":22},"D","索赔金额=直接费+间接费+利润+税金","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},90964,"根据《建设工程工程量清单计价规范》，关于确定因非承包人原因引起工程量增减的综合单价的说法，正确的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"因合同中已有适用的综合单价，故应继续按合同中已有的综合单价执行",{"key":24,"text":41,"correct":22},"必须由承包人提出新的综合单价，经发包人确认后执行",{"key":27,"text":43,"correct":29},"若该工程量的增减在合同约定幅度以内，应执行原有的综合单价",{"key":31,"text":45,"correct":22},"若该项工程量变化在合同约定幅度以外，其综合单价应予以调整，但措施费不能调整",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},90966,"假定某一建筑承包工程的结算价款总额为2000万元，预付备料款占价款的25%，主要材料和结构件金额占工程价款的62.5%。按照理论扣回方式，预付备料款起扣点是( )万元。",[50,52,54,56],{"key":20,"text":51,"correct":22},"500",{"key":24,"text":53,"correct":22},"800",{"key":27,"text":55,"correct":29},"1200",{"key":31,"text":57,"correct":22},"1500",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},90967,"假定某一建筑承包工程的结算价款总额为3000万元，预付备料款占价款的25%，主要材料和结构件金额占工程价款的75%。按照理论扣回方式，预付备料款起扣点是( )万元。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":57,"correct":22},{"key":31,"text":66,"correct":29},"2000",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":31,"analysis":33},90968,"某工程合同价为1000万元，合同中约定采用调值公式法进行工程价款动态结算，其中固定要素比重为0.2，调价要素 A、 B、C在合同总价中所占比重分别为0.15、0.35、0.3。结算时，三项要素的价格指数分别增长了10％、15％、25％，则该工程的实际结算款是( )万元。",[71,73,75,77],{"key":20,"text":72,"correct":22},"942.5",{"key":24,"text":74,"correct":22},"1015.6",{"key":27,"text":76,"correct":22},"1067.5",{"key":31,"text":78,"correct":29},"1142.5",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":27,"analysis":33},90970,"《建设工程价款结算暂行办法》规定，在具备施工条件的前提下，发包人不按约定预付，承包人应在预付时间到期后( )天内向发包人发出要求预付的通知。",[83,85,87,89],{"key":20,"text":84,"correct":22},"5",{"key":24,"text":86,"correct":22},"7",{"key":27,"text":88,"correct":29},"10",{"key":31,"text":90,"correct":22},"14",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":31,"analysis":33},90971,"已标价工程量清单中没有适用也没有类似于变更工程项目，且工程造价管理机构发布的信息价格缺价的，由（ ）提出变更工程项目的单价，并报发包人确认后调整。",[95,97,99,101],{"key":20,"text":96,"correct":22},"监理工程师",{"key":24,"text":98,"correct":22},"总监理工程师",{"key":27,"text":100,"correct":22},"监理工程师或承包人",{"key":31,"text":102,"correct":29},"承包人",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":20,"analysis":33},90972,"下列关于工程项目竣工决算的说法中，正确的是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":29},"竣工决算应包括从筹建到竣工投产全过程的实际支出费用",{"key":24,"text":110,"correct":22},"中央级大、中型基本建设项目竣工财务决算直接由财政部审核与审批",{"key":27,"text":112,"correct":22},"国家确定的重点小型项目竣工财务决算直接由财政部审核与审批",{"key":31,"text":114,"correct":22},"地方级基本建设项目竣工财务决算经主管部门审核后报财政部审批",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":27,"analysis":33},90973,"根据基本建设项目竣工财务决算大中小型划分标准，非经营性项目投资额在（ ）万元以上者为大中型项目。",[119,121,123,125],{"key":20,"text":120,"correct":22},"5000",{"key":24,"text":122,"correct":22},"4000",{"key":27,"text":124,"correct":29},"3000",{"key":31,"text":66,"correct":22},{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":24,"analysis":33},90975,"完成某工作的最短持续时间为8天、最长持续时间为16天、最可能持续时间为15天，则该工作的持续时间是( )天。",[130,132,133,135],{"key":20,"text":131,"correct":22},"13",{"key":24,"text":90,"correct":29},{"key":27,"text":134,"correct":22},"15",{"key":31,"text":136,"correct":22},"16",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":31,"analysis":33},90976,"网络计划中的关键线路一定是（ ）的线路。",[141,143,145,147],{"key":20,"text":142,"correct":22},"总时差为零",{"key":24,"text":144,"correct":22},"自由时差为零",{"key":27,"text":146,"correct":22},"不包括虚箭线",{"key":31,"text":148,"correct":29},"总的工作持续时间最长",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":27,"analysis":33},90977,"在工程网络计划中，工作M的最迟完成时间为第28天，其持续时间为6天。该工作有两项紧前工作，它们的最早完成时间分别为第12天和第15天，则工作M的总时差为（ ）天。",[153,154,156,157],{"key":20,"text":84,"correct":22},{"key":24,"text":155,"correct":22},"6",{"key":27,"text":86,"correct":29},{"key":31,"text":158,"correct":22},"8",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":20,"analysis":33},90978,"双代号网络计划中，工作H的持续时间是7天，最早完成时间是第13天，总时差是9天，则工作H的最迟开始时间为第（ ）天。",[163,164,165,167],{"key":20,"text":134,"correct":29},{"key":24,"text":136,"correct":22},{"key":27,"text":166,"correct":22},"20",{"key":31,"text":168,"correct":22},"22",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":20,"analysis":33},90980,"在工程网络计划中，工作F的最早开始时间是第8天，其持续时间为4天，该工作有三项紧后工作，其最迟开始时间分别为第15天、第17天、第20天，则工作F的总时差为（ ）天。",[173,175,176,177],{"key":20,"text":174,"correct":29},"3",{"key":24,"text":84,"correct":22},{"key":27,"text":158,"correct":22},{"key":31,"text":88,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},90981,"双代号网络计划中，工作N有四项紧前工作，其最早完成时间分别是第16周、第19周、第22周和第20周，则工作N的最早开始时间是第（ ）周。",[182,183,185,186],{"key":20,"text":136,"correct":22},{"key":24,"text":184,"correct":22},"19",{"key":27,"text":166,"correct":22},{"key":31,"text":168,"correct":29},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},90982,"某工程程网络计划中，E工作的总时差为5天，自由时差为4天，在检查实际进度时发现该工作的持续时间延长了6天，则E工作的实际进度对其紧后工作的最早开始时间及总工期的影响是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":29},"使其紧后工作的最早开始时间推迟2天，并使总工期推迟1天",{"key":24,"text":194,"correct":22},"使其紧后工作的最早开始时间推迟2天，并使总工期推迟2天",{"key":27,"text":196,"correct":22},"使其紧后工作的最早开始时间推迟2天，但不影响总工期",{"key":31,"text":198,"correct":22},"使其紧后工作的最早开始时间推迟1天，但不影响总工期",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":27,"analysis":33},90983,"下列关于关键线路的说法，错误的是（）。",[203,205,206,208],{"key":20,"text":204,"correct":22},"由关键工作组成",{"key":24,"text":148,"correct":22},{"key":27,"text":207,"correct":29},"由工作时差最小的工作组成",{"key":31,"text":209,"correct":22},"可以用双线标注",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},90985,"在工程网络计划中，判别关键工作的条件是（ ）",[214,216,218,220],{"key":20,"text":215,"correct":22},"该工作与其紧后工作开始之间的时距最小",{"key":24,"text":217,"correct":22},"该工作与其紧前工作之间的时间间隔为零",{"key":27,"text":219,"correct":22},"该工作与其紧后工作之间的时间间隔为零",{"key":31,"text":221,"correct":29},"该工作最迟开始时间与最早开始时间的差值最小",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},90987,"某双代号网络计划中，工作M的持续时间是7天，最早完成时间是第13天，总时差是9天，则工作M的最迟开始时间是第( )天。",[226,227,228,229],{"key":20,"text":134,"correct":29},{"key":24,"text":136,"correct":22},{"key":27,"text":166,"correct":22},{"key":31,"text":168,"correct":22},{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":31,"analysis":33},90988,"在某工程网络计划中，工作H的最早开始时间和最迟开始时间分别为第20天和第25天，其持续时间为9天。该工作有两项紧后工作，它们的最早开始时间分别为第32天和第34天，则工作H的总时差和自由时差分别为（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":22},"3天和0天",{"key":24,"text":237,"correct":22},"3天和2天",{"key":27,"text":239,"correct":22},"5天和0天",{"key":31,"text":241,"correct":29},"5天和3天",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":27,"analysis":33},90991,"下列关于双代号时标网络计划的说法中，不正确的是( )。",[246,248,250,252],{"key":20,"text":247,"correct":22},"能够清楚地表明计划的时间进程，使用方便",{"key":24,"text":249,"correct":22},"能在图上直接显示出各项工作的开始与完成时间，工作的自由时差及关键线路",{"key":27,"text":251,"correct":29},"虚工作可以用水平方向的虚箭线表示",{"key":31,"text":253,"correct":22},"可以统计每一个单位时间对资源的需要量",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":27,"analysis":33},90992,"时标网络计划应以波形线表示( )。",[258,260,262,264],{"key":20,"text":259,"correct":22},"工作",{"key":24,"text":261,"correct":22},"虚工作",{"key":27,"text":263,"correct":29},"工作的自由时差",{"key":31,"text":265,"correct":22},"工作的总时差",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":27,"analysis":33},90993,"在双代号时标网络计划中，工作D有四项紧后工作，其工作总时差分别为6周、4周、7周和5周，工作D的自由时差为3周，则工作D的总时差为( )周。",[270,271,272,273],{"key":20,"text":174,"correct":22},{"key":24,"text":155,"correct":22},{"key":27,"text":86,"correct":29},{"key":31,"text":88,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},90995,"在工程网络计划中，工作M的持续时间为5天，其最早开始时间是第6天。该工作有三项紧后工作，最迟开始时间分别为第16天、18天、20天。则工作M的总时差是( )天。",[278,279,280,281],{"key":20,"text":174,"correct":22},{"key":24,"text":84,"correct":29},{"key":27,"text":86,"correct":22},{"key":31,"text":282,"correct":22},"9",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":27,"analysis":33},90996,"下列关于双代号网络图的说法中，正确的是（ ）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"节点表示工作，即占时间，又消耗资源",{"key":24,"text":290,"correct":22},"实箭线表示工作，既占时间，又消耗资源",{"key":27,"text":292,"correct":29},"虚箭线表示虚拟工作，不占时间，也不消耗资源",{"key":31,"text":294,"correct":22},"虚箭线表示虚拟工作，只占时间，不消耗资源",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},90997,"工作A有三项紧后工作 B、 C、 D，其持续时间分别为5天、6天、7天，且 B、 C、D三项工作的最迟完成时间分别为第13天、第15天和第13天，则工作A的最迟完成时间是第( )天。",[299,300,301,302],{"key":20,"text":84,"correct":22},{"key":24,"text":155,"correct":29},{"key":27,"text":158,"correct":22},{"key":31,"text":282,"correct":22},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":31,"analysis":33},90999,"在网络计划中，工作自由时差与总时差的关系通常是( )。",[307,309,311,313],{"key":20,"text":308,"correct":22},"自由时差=总时差",{"key":24,"text":310,"correct":22},"自由时差>总时差",{"key":27,"text":312,"correct":22},"自由时差≥总时差",{"key":31,"text":314,"correct":29},"自由时差≤总时差",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":20,"analysis":33},91000,"下列关于工作总时差的说法中，正确的是（ ）。",[319,321,323,325],{"key":20,"text":320,"correct":29},"总时差是在不影响总工期的前提下，本工作可以利用的机动时间",{"key":24,"text":322,"correct":22},"总时差是在不影响其后续工作最迟开始时间的前提下，本工作可以利用的机动时间",{"key":27,"text":324,"correct":22},"总时差是在不影响其后续工作最早完成时间的前提下，本工作可以利用的机动时间",{"key":31,"text":326,"correct":22},"总时差是在不影响其紧后工作最早开始时间的前提下，本工作可以利用的机动时间",{"id":328,"libraryId":5,"type":15,"typeLabel":16,"stem":329,"options":330,"answer":31,"analysis":33},91001,"工作E有四项紧前工作 A、 B、 C、 D，其持续时间分别为2天、6天、7天、5天，最早开始时间分别为第8天、4天、6天、10天，则工作E的最早开始时间为第（ ）天。",[331,332,334,335],{"key":20,"text":88,"correct":22},{"key":24,"text":333,"correct":22},"12",{"key":27,"text":131,"correct":22},{"key":31,"text":134,"correct":29},{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},91003,"根据表中给出的逻辑关系绘制的双代号网络图如下图所示，图中绘图的错误是()",[340,342,344,346],{"key":20,"text":341,"correct":22},"逻辑关系表达不正确",{"key":24,"text":343,"correct":29},"节点编号有错误",{"key":27,"text":345,"correct":22},"出现了相同代号的工作",{"key":31,"text":347,"correct":22},"有多余的虚工作",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":27,"analysis":33},91004,"在网络计划执行过程中，发现工作G尚需5天完成，至该工作最迟完成时间还有3天，则该事项造成的影响是( )。",[352,354,356,358],{"key":20,"text":353,"correct":22},"工作G的实际进度比计划进度拖后3天",{"key":24,"text":355,"correct":22},"工作G的实际进度比计划进度拖后5天",{"key":27,"text":357,"correct":29},"将使总工期拖后2天",{"key":31,"text":359,"correct":22},"将使总工期拖后3天",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":31,"analysis":33},91005,"双代号网络计划中，工作N的持续时间为10周。其有四项紧前工作，其最早完成时间分别是第16周、第19周、第21周和第20周，则工作N的最早完成时间是第（ ）周。",[364,365,366,368],{"key":20,"text":136,"correct":22},{"key":24,"text":166,"correct":22},{"key":27,"text":367,"correct":22},"27",{"key":31,"text":369,"correct":29},"31",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},91006,"双代号网络计划中，工作N的持续时间为5周。其有四项紧后工作，其最迟开始时间分别是第13周、第19周、第21周和第20周，则工作N的最迟开始时间是第（ ）周。",[374,375,376,378],{"key":20,"text":155,"correct":22},{"key":24,"text":158,"correct":29},{"key":27,"text":377,"correct":22},"11",{"key":31,"text":131,"correct":22},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},91008,"在双代号网络计划中，工作N的持续时间是6天，最早完成时间是第13天，其总时差为5天，则工作N的最迟开始时间是第()天。。",[383,384,385,386],{"key":20,"text":377,"correct":22},{"key":24,"text":333,"correct":29},{"key":27,"text":131,"correct":22},{"key":31,"text":387,"correct":22},"18",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},91009,"在工程网络计划中，工作M有 B、 D、E三项紧前工作，其持续时间和工作最早开始时间如下表所示，则工作M的最早开始时间是第( )天。",[392,393,394,396],{"key":20,"text":166,"correct":22},{"key":24,"text":168,"correct":22},{"key":27,"text":395,"correct":22},"24",{"key":31,"text":397,"correct":29},"26",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":27,"analysis":33},91010,"在单代号网络计划中，某工作与其紧后工作之间的时间间隔应等于( )。",[402,404,406,408],{"key":20,"text":403,"correct":22},"该工作紧后工作的最早开始时间与该工作最早开始时间之差",{"key":24,"text":405,"correct":22},"该工作紧后工作的最迟开始时间与该工作最早完成时间之差",{"key":27,"text":407,"correct":29},"该工作紧后工作的最早开始时间与该工作最早完成时间之差",{"key":31,"text":409,"correct":22},"该工作紧后工作的最迟开始时间与该工作最迟完成时间之差",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":27,"analysis":33},91012,"某单代号网络计划中，工作B与其紧后工作 E、G之间的时间间隔分别是3天和6天，工作E和G的总时差分别为5天和3天，则工作B的总时差应为（ ）天。",[414,415,416,417],{"key":20,"text":174,"correct":22},{"key":24,"text":155,"correct":22},{"key":27,"text":158,"correct":29},{"key":31,"text":282,"correct":22},{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},91013,"在单代号网络计划中，工作H的最早开始时间为第12天，持续时间为6天。工作H有三项紧后工作，最早开始时间分别为第22天、24天、26天，则工作H的自由时差是( )天。",[422,424,425,426],{"key":20,"text":423,"correct":29},"4",{"key":24,"text":155,"correct":22},{"key":27,"text":158,"correct":22},{"key":31,"text":88,"correct":22},{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},91014,"某单代号网络计划中，工作M的最早开始时间和最迟开始时间分别为第20天和第25天，持续时间为9天。该工作有两项紧后工作，它们的最早开始时间分别为第32天和第34天，则工作M的总时差和自由时差分别为( )天。",[431,433,435,437],{"key":20,"text":432,"correct":22},"3和0",{"key":24,"text":434,"correct":22},"3和2",{"key":27,"text":436,"correct":22},"5和0",{"key":31,"text":438,"correct":29},"5和3",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":20,"analysis":33},91015,"在单代号网络计划中，某工作的紧后工作最早开始时间的最小值与本工作的最早完成时间之差是( )。",[443,445,447,449],{"key":20,"text":444,"correct":29},"本工作的自由时差",{"key":24,"text":446,"correct":22},"紧后工作的自由时差",{"key":27,"text":448,"correct":22},"本工作与其紧后工作之间的时间间隔",{"key":31,"text":450,"correct":22},"本工作的总时差",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":24,"analysis":33},91017,"下列关于单代号网络图的绘图规则的说法中，不正确的是( )。",[455,457,459,461],{"key":20,"text":456,"correct":22},"必须正确表达已定的逻辑关系",{"key":24,"text":458,"correct":29},"特殊情况下可以出现循环回路",{"key":27,"text":460,"correct":22},"严禁出现双向箭头或无箭头的连线",{"key":31,"text":462,"correct":22},"严禁出现没有箭尾节点的箭线和没有箭头节点的箭线",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},91018,"在网络计划的检查过程中，发现某工作的实际进度延后了3天，而该工作的总时差和自由时差分别为7天和4天，则此工作的进度拖延（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"不影响总工期，但将其后续工作的最早开始时间推迟3天",{"key":24,"text":470,"correct":29},"既不影响总工期，也不影响其后续工作的正常进行",{"key":27,"text":472,"correct":22},"将使总工期延长3天，但不影响其后续工作的正常进行",{"key":31,"text":474,"correct":22},"将使总工期及其后续工作的最早开始时间均推迟3天",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},91019,"如果某工程关键线路实际进度比计划进度延误，应在未完成的工作中选择适当对象压缩其持续时间，选择的对象应是（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"后续总时差小的非关键工作",{"key":24,"text":482,"correct":22},"后续总时差大的非关键工作",{"key":27,"text":484,"correct":22},"尚未完成的关键工作中资源强度大或直接费用率高的工作",{"key":31,"text":486,"correct":29},"尚未完成的关键工作中资源强度小或直接费用率低的工作",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":27,"analysis":33},91021,"某网络计划的执行中，检查发现D工作的总时差由3天变成了-1天，则D工作（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"工期拖后1天，影响工期1天",{"key":24,"text":494,"correct":22},"工期拖后3天，影响工期1天",{"key":27,"text":496,"correct":29},"工期拖后4天，影响工期1天",{"key":31,"text":498,"correct":22},"工期拖后4天，影响工期3天",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":27,"analysis":33},91022,"在原时标网络计划上，自上而下地从计划执行中某一检查时刻的时标点出发，用点划线依次将各项工作实际进度达到的前锋点连接而成的折线，称为( )。",[503,505,507,509],{"key":20,"text":504,"correct":22},"实际进度曲划线",{"key":24,"text":506,"correct":22},"实际进度中锋线",{"key":27,"text":508,"correct":29},"实际进度前锋线",{"key":31,"text":510,"correct":22},"实际进度后置线",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},91023,"在工程网络计划执行过程中，若某项工作进度比原计划拖后，而拖后的时间未超过其自由时差，则( )。",[515,517,519,521],{"key":20,"text":516,"correct":29},"总工期及后续工作均不受影响",{"key":24,"text":518,"correct":22},"不影响后续工作，影响总工期",{"key":27,"text":520,"correct":22},"不影响总工期，影响后续工作",{"key":31,"text":522,"correct":22},"对总工期及后续工作均有影响",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},91024,"在工程网络计划执行过程中，如果发现某工作进度拖后，则受影响的工作一定是该工作的( )。",[527,529,531,533],{"key":20,"text":528,"correct":22},"平行工作",{"key":24,"text":530,"correct":29},"后续工作",{"key":27,"text":532,"correct":22},"先行工作",{"key":31,"text":534,"correct":22},"紧前工作",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},91026,"将风险分为纯风险和投机风险的标准是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"风险产生的根源",{"key":24,"text":542,"correct":29},"风险造成的后果",{"key":27,"text":544,"correct":22},"风险分布的情况",{"key":31,"text":546,"correct":22},"风险控制的角度",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},91027,"风险是指在给定情况下和特定时间内，那些可能发生的结果间的差异，若两种可能各占50%，则（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":29},"风险最大",{"key":24,"text":554,"correct":22},"风险最小",{"key":27,"text":556,"correct":22},"没有风险",{"key":31,"text":558,"correct":22},"风险不确定",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},91028,"在FIDIC条件下，如遇工程所在国家发生战争给承包商造成的损失，应有（ ）给予补偿。",[563,565,567,569],{"key":20,"text":564,"correct":22},"承包商自己",{"key":24,"text":566,"correct":29},"业主",{"key":27,"text":568,"correct":22},"工程所在国政府",{"key":31,"text":570,"correct":22},"业主与承包商共同",[572,575,578,581,584,586],{"id":573,"name":574,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":576,"name":577,"category":7,"favorite":8},30,"经济师",{"id":579,"name":580,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":582,"name":583,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":585,"category":7,"favorite":8},"(初级)保险专业",{"id":587,"name":588,"category":7,"favorite":8},51,"(初级)财政税收"]