[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-48":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":688},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,48,50,2598,[13,38,53,68,83,98,113,128,142,157,172,185,199,213,227,242,256,271,284,297,311,325,338,350,365,380,393,403,411,425,437,452,466,477,491,502,516,530,544,555,569,583,593,605,615,625,640,652,664,678],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},94033,2,"多选题","网络计划实施中的控制主要包括（）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","检查并掌握工程的实际进展情况",true,{"key":24,"text":25,"correct":26},"B","掌握工程成本的控制情况",false,{"key":28,"text":29,"correct":22},"C","分析产生进度偏差的主要原因",{"key":31,"text":32,"correct":22},"D","确定相应的纠偏措施或调整方法",{"key":34,"text":35,"correct":26},"E","保证项目按照合同要求的工期按时完工","ACD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},94034,"双代号网络图的绘图规则有（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"可以使用母线法绘制",{"key":24,"text":45,"correct":22},"图中严禁出现循环回路",{"key":28,"text":47,"correct":22},"必须正确表达一定的逻辑关系",{"key":31,"text":49,"correct":26},"图中严禁出现箭线交叉",{"key":34,"text":51,"correct":22},"应只有一个起点节点和一个终点节点","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},94035,"调整网络计划非关键工作时差的方法是（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"将工作在其最早开始时间和最早完成时间范围内移动",{"key":24,"text":60,"correct":22},"将工作在其最早开始时间和最迟完成时间范围内移动",{"key":28,"text":62,"correct":22},"延长工作的持续时间",{"key":31,"text":64,"correct":22},"缩短工作的持续时间",{"key":34,"text":66,"correct":26},"将工作断开，分段完成","BCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},94036,"在绘制网络图时，表示箭线交叉的方法有（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"过桥法",{"key":24,"text":75,"correct":26},"母线法",{"key":28,"text":77,"correct":26},"流水法",{"key":31,"text":79,"correct":26},"分段法",{"key":34,"text":81,"correct":22},"指向法","AE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},94037,"某工程项目的双代号时标网络计划如下图所示，项目进行到第6周周末时，检查了实际进度并绘制出实际进度前锋线。关于工作进度对工期影响的说法，正确的有（）。",[87,89,91,93,95],{"key":20,"text":88,"correct":26},"工作B将使工期拖延3周",{"key":24,"text":90,"correct":26},"工作C将使工期拖延1周",{"key":28,"text":92,"correct":22},"工作D将使工期拖延2周",{"key":31,"text":94,"correct":22},"工作C不影响工期和紧后工作",{"key":34,"text":96,"correct":22},"工作B将使工期拖延2周、紧后工作最早开始时间推迟3周","CDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},94038,"某工程的双代号时标网络计划如下图所示，当工程进行到7月底时，检查了该工程的实际进度并绘制了实际进度前锋线，根据7月底检查该工程的实际进度结果表明（）。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"工作D的实际进度不影响总工期",{"key":24,"text":105,"correct":26},"工作D的实际进度不影响其紧后工作",{"key":28,"text":107,"correct":26},"工作E的实际进度将使工期推迟1个月完成",{"key":31,"text":109,"correct":22},"工作E的实际进度不影响紧后工作和总工期",{"key":34,"text":111,"correct":22},"该工程的实际进度将比计划进度推迟2个月完成","ADE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},94039,"当某工程网络计划的计算工期等于计划工期时，关于网络计划中工作时差的说法，正确的有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":26},"工作自由时差为零，总时差必定为零",{"key":24,"text":120,"correct":22},"工作总时差为零，自由时差必定为零",{"key":28,"text":122,"correct":26},"在不影响总工期的前提下，工作的机动时间为其自由时差",{"key":31,"text":124,"correct":22},"在不影响总工期的前提下，工作的机动时间为其总时差",{"key":34,"text":126,"correct":22},"在不影响紧后工作最早开始时间的前提下，工作的机动时间为其自由时差","BDE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":112,"analysis":37},94040,"关于网络计划中工作总时差的说法，正确的有（ ）。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"工作总时差是不影响工程总工期前提下该工作可以利用的机动时间",{"key":24,"text":135,"correct":26},"工作总时差是不影响其后续工作最早开始时间前提下该工作可以利用的机动时间",{"key":28,"text":137,"correct":26},"工作总时差是不影响其紧后工作最早开始时间前提下该工作可以利用的机动时间",{"key":31,"text":139,"correct":22},"工作总时差等于工作最迟开始时间与最早开始时间之差",{"key":34,"text":141,"correct":22},"工作总时差等于该工作的最迟完成时间与最早完成时间之差",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},94041,"某工程网络进度计划中，已知工作E的总时差为5天，自由时差为3天。在该网络计划的执行过程中检查发现，工作E的实际进度比原计划进度延误了4天，其他工作进展正常。检查结果表明（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":26},"工作E不影响其后续工作的正常进行",{"key":24,"text":149,"correct":22},"工作E不影响该工程的总工期",{"key":28,"text":151,"correct":22},"工作E将使其紧后工作的最早开始时间推迟1天",{"key":31,"text":153,"correct":26},"工作E将使其紧后工作的最早完成时间推迟4天",{"key":34,"text":155,"correct":22},"工作E尚有1天总时差","BCE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},94042,"在不改变网络计划各项工作之间的逻辑关系的情况下，可以采取（ ）措施以保证按计划工期完成工程项目。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"增加施工机械",{"key":24,"text":164,"correct":22},"提高劳动效率",{"key":28,"text":166,"correct":26},"将顺序进行的工作改为平行作业",{"key":31,"text":168,"correct":22},"增加施工队伍",{"key":34,"text":170,"correct":26},"分段组织流水作业","ABD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":171,"analysis":37},94043,"当工程网络计划实施中产生的进度偏差影响到总工期，且有关工作的逻辑关系允许改变时，可以有效缩短工期的方法有（ ）。",[176,178,180,182,183],{"key":20,"text":177,"correct":22},"顺序进行的工作改为平行作业",{"key":24,"text":179,"correct":22},"顺序进行的工作改为搭接作业",{"key":28,"text":181,"correct":26},"保持顺序进行的作业，提高工作效率",{"key":31,"text":170,"correct":22},{"key":34,"text":184,"correct":26},"增大工作之间的间歇时间",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":171,"analysis":37},94044,"根据下表中工作之间的逻辑关系绘制的双代号网络图如下图所示，其绘图错误有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"逻辑关系不正确",{"key":24,"text":192,"correct":22},"有多个终点节点",{"key":28,"text":194,"correct":26},"有多个起点节点",{"key":31,"text":196,"correct":22},"节点编号有错误",{"key":34,"text":198,"correct":26},"有多余的虚工作",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":97,"analysis":37},94045,"下列费用中，属于工程建设其他费用的有( )。",[203,205,207,209,211],{"key":20,"text":204,"correct":26},"设备运杂费",{"key":24,"text":206,"correct":26},"企业管理费",{"key":28,"text":208,"correct":22},"勘察设计费",{"key":31,"text":210,"correct":22},"技术引进费",{"key":34,"text":212,"correct":22},"联合试运转费",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":52,"analysis":37},94046,"建筑安装工程费中材料费的构成包括( )等。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"材料原价",{"key":24,"text":220,"correct":22},"材料运杂费",{"key":28,"text":222,"correct":22},"不可避免的运输损耗费",{"key":31,"text":224,"correct":26},"周转材料摊销费",{"key":34,"text":226,"correct":22},"材料采购及保管费",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},94047,"下列建筑安装工程费用中，属于企业管理费的有( )。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"工伤保险费",{"key":24,"text":234,"correct":22},"固定资产使用费",{"key":28,"text":236,"correct":22},"劳动保护费",{"key":31,"text":238,"correct":22},"材料检验试验费",{"key":34,"text":240,"correct":22},"职工教育经费","BCDE",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":255,"analysis":37},94048,"下列费用中，属于建筑安装工程费的有( )。",[246,248,250,251,253],{"key":20,"text":247,"correct":22},"人工费",{"key":24,"text":249,"correct":22},"利润",{"key":28,"text":206,"correct":22},{"key":31,"text":252,"correct":22},"规费",{"key":34,"text":254,"correct":26},"建设期利息","ABCD",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":270,"analysis":37},94049,"下列费用中，属于进口设备运杂费的有( )。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"建设单位的采购与仓库保管费",{"key":24,"text":263,"correct":22},"进口设备从我国到岸港口、边境车站起至工地仓库止所发生的运输费和装卸费",{"key":28,"text":265,"correct":26},"设备装配费用",{"key":31,"text":267,"correct":26},"进口增值税",{"key":34,"text":269,"correct":26},"进口代理手续费","AB",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":171,"analysis":37},94050,"进口设备的完税价格是指设备运抵我国口岸的正常到岸价格，包括( )。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"离岸价格(FOB价)",{"key":24,"text":278,"correct":22},"国际运费",{"key":28,"text":280,"correct":26},"采购费及仓库保管费",{"key":31,"text":282,"correct":22},"运输保险费",{"key":34,"text":267,"correct":26},{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":296,"analysis":37},94051,"进口车辆需缴纳进口车辆购置附加费，其计费数应包括( )。",[288,289,291,293,295],{"key":20,"text":276,"correct":22},{"key":24,"text":290,"correct":26},"银行财务费",{"key":28,"text":292,"correct":22},"关税",{"key":31,"text":294,"correct":26},"增值税",{"key":34,"text":269,"correct":26},"AC",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":52,"analysis":37},94052,"下列费用项目中，应列入建筑安装工程费中施工机械使用费的有()。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"施工机械的大修理费",{"key":24,"text":304,"correct":22},"施工机械操作人员人工费",{"key":28,"text":306,"correct":22},"施工机械在运转作业中所消耗的燃料动力费",{"key":31,"text":308,"correct":26},"施工机械的购入费",{"key":34,"text":310,"correct":22},"施工机械的折旧费",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":324,"analysis":37},94053,"规费中的社会保险费包括( )。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"养老保险费",{"key":24,"text":318,"correct":22},"失业保险费",{"key":28,"text":320,"correct":26},"意外保险费",{"key":31,"text":322,"correct":22},"医疗保险费",{"key":34,"text":232,"correct":22},"ABDE",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":255,"analysis":37},94054,"涨价预备费的计算基数包括( )。",[329,331,333,335,337],{"key":20,"text":330,"correct":22},"建筑安装工程费",{"key":24,"text":332,"correct":22},"设备及工器具购置费",{"key":28,"text":334,"correct":22},"工程建设其他费用",{"key":31,"text":336,"correct":22},"基本预备费",{"key":34,"text":254,"correct":26},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":349,"analysis":37},94055,"建设投资包括（ ）",[342,344,345,346,347],{"key":20,"text":343,"correct":22},"工程费用",{"key":24,"text":254,"correct":26},{"key":28,"text":334,"correct":22},{"key":31,"text":336,"correct":22},{"key":34,"text":348,"correct":22},"涨价预备费","ACDE",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":364,"analysis":37},94056,"下列计价方法中，可以用于流动资金估算的有( )。",[354,356,358,360,362],{"key":20,"text":355,"correct":26},"资金周转率法",{"key":24,"text":357,"correct":22},"分项详细估算法",{"key":28,"text":359,"correct":22},"扩大指标估算法",{"key":31,"text":361,"correct":26},"生产能力指数法",{"key":34,"text":363,"correct":26},"类似工程预决算法","BC",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":379,"analysis":37},94057,"设计概算分为三级概算，包括( )。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"建设项目总概算",{"key":24,"text":372,"correct":26},"设备及安装单位工程概算",{"key":28,"text":374,"correct":22},"单项工程综合概算",{"key":31,"text":376,"correct":26},"工程建设其他费用概算",{"key":34,"text":378,"correct":22},"单位工程概算","ACE",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":392,"analysis":37},94058,"采用工料单价法编制施工图预算时，工料单价中应包括( )。",[384,385,387,389,390],{"key":20,"text":247,"correct":22},{"key":24,"text":386,"correct":22},"材料费",{"key":28,"text":388,"correct":22},"施工机具使用费",{"key":31,"text":249,"correct":26},{"key":34,"text":391,"correct":26},"税金","ABC",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":379,"analysis":37},94059,"建设投资估算在不同阶段和不同项目时，有不同的投资估算方法，下列属于建设投资估算方法的有()。",[397,398,399,400,401],{"key":20,"text":355,"correct":22},{"key":24,"text":357,"correct":26},{"key":28,"text":361,"correct":22},{"key":31,"text":363,"correct":26},{"key":34,"text":402,"correct":22},"设备费用百分比估算法",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":171,"analysis":37},94060,"以下是设备安装工程费用概算编制方法的是（ ） A.预算单价法 B.扩大单价法 C.预算指标法 D.概算指标法",[407,408,409,410],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":36,"analysis":37},94061,"投标报价对于投标来说是关键性工作，下列符合投标报价基本原则的有( )。",[415,417,419,421,423],{"key":20,"text":416,"correct":22},"投标价应由投标人或受其委托具有相应资质的工程造价咨询人编制",{"key":24,"text":418,"correct":26},"投标价应由投标人自主确定，投标报价越低越好",{"key":28,"text":420,"correct":22},"投标人必须按招标工程量清单填报价格，项目编码、项目名称、项目特征、计量单位、工程量必须与招标工程量清单一致",{"key":31,"text":422,"correct":22},"投标价不能高于招标人设定的招标控制价，否则投标将作为废标处理。",{"key":34,"text":424,"correct":26},"投标价不能低于招标人设定的最低投标限价，否则投标将作为废标处理",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":97,"analysis":37},94062,"工程量清单中的其他项目清单内容包括( )。",[429,430,431,433,435],{"key":20,"text":252,"correct":26},{"key":24,"text":391,"correct":26},{"key":28,"text":432,"correct":22},"总承包服务费",{"key":31,"text":434,"correct":22},"暂列金额",{"key":34,"text":436,"correct":22},"暂估价",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":451,"analysis":37},94063,"下列费用中，属于应在规费清单中列项的有( )。",[441,443,445,447,449],{"key":20,"text":442,"correct":26},"安全文明施工费",{"key":24,"text":444,"correct":26},"工会经费",{"key":28,"text":446,"correct":22},"社会保险费",{"key":31,"text":448,"correct":26},"教育费附加",{"key":34,"text":450,"correct":22},"住房公积金","CE",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":97,"analysis":37},94064,"招标工程量清单应以单位(项)工程为单位编制，工程量清单中除了应包括分部分项工程量清单、措施项目清单外，还应包括( )。",[456,458,460,462,464],{"key":20,"text":457,"correct":26},"单位工程量清单",{"key":24,"text":459,"correct":26},"单项工程量清单",{"key":28,"text":461,"correct":22},"规费项目清单",{"key":31,"text":463,"correct":22},"税金项目清单",{"key":34,"text":465,"correct":22},"其他项目清单",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":476,"analysis":37},94065,"下列工程量清单项目中，属于应列入其他项目清单的有( )。",[470,471,473,474,475],{"key":20,"text":432,"correct":22},{"key":24,"text":472,"correct":22},"计日工",{"key":28,"text":450,"correct":26},{"key":31,"text":294,"correct":26},{"key":34,"text":434,"correct":22},"ABE",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":52,"analysis":37},94066,"根据《建设工程工程量清单计价规范》，下列事项中，会导致发承包双方按照合同约定调整合同价款的有( )。",[481,483,485,487,489],{"key":20,"text":482,"correct":22},"出现不可抗力事件",{"key":24,"text":484,"correct":22},"合同履行过程中发生法律法规变化",{"key":28,"text":486,"correct":22},"工程量清单中项目特征描述与实际施工设计图纸不符",{"key":31,"text":488,"correct":26},"未经发包人确认的施工方案调整",{"key":34,"text":490,"correct":22},"设计图纸修改引起的工程变更",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":349,"analysis":37},94067,"下列费用中属于承包人索赔费用组成要素的有( )。",[495,496,497,499,500],{"key":20,"text":388,"correct":22},{"key":24,"text":391,"correct":26},{"key":28,"text":498,"correct":22},"利息",{"key":31,"text":249,"correct":22},{"key":34,"text":501,"correct":22},"现场管理费",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":67,"analysis":37},94068,"下列报表中，属于基本建设项目竣工财务决算报表的有( )。",[506,508,510,512,514],{"key":20,"text":507,"correct":26},"基本建设项目竣工结算表",{"key":24,"text":509,"correct":22},"基本建设项目概况表",{"key":28,"text":511,"correct":22},"基本建设项目交付使用资产总表",{"key":31,"text":513,"correct":22},"基本建设项目交付使用资产明细表",{"key":34,"text":515,"correct":26},"基本建设项目结余资金分配表",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":171,"analysis":37},94069,"建设项目竣工决算的内容包括( )。",[520,522,524,526,528],{"key":20,"text":521,"correct":22},"项目竣工财务决算报表",{"key":24,"text":523,"correct":22},"项目竣工财务决算说明书",{"key":28,"text":525,"correct":26},"投标报价书",{"key":31,"text":527,"correct":22},"项目竣工财务决(结)算审核情况",{"key":34,"text":529,"correct":26},"竣工决算财务报告",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":67,"analysis":37},94070,"下列货物交货规则中，属于装运港交货的规则有（）。",[534,536,538,540,542],{"key":20,"text":535,"correct":26},"A.完税后交货(DDP)",{"key":24,"text":537,"correct":22},"B.装运港船上交货(FO",{"key":28,"text":539,"correct":22},"成本加运费付至目的港(CFR)",{"key":31,"text":541,"correct":22},"成本、保险加运费付至目的港(CI",{"key":34,"text":543,"correct":26},"终点站交货(DAT)",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":270,"analysis":37},94071,"下列费用中，属于进口设备运杂费的有（）。",[548,549,551,552,554],{"key":20,"text":261,"correct":22},{"key":24,"text":550,"correct":22},"进口设备从我国到岸港口、边境车站起至工地仓库止所发生的运费和装卸费",{"key":28,"text":265,"correct":26},{"key":31,"text":553,"correct":26},"单个设备无负荷试运转费",{"key":34,"text":269,"correct":26},{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":568,"analysis":37},94072,"某进口设备采用CIF形式交货，则下列各项费用中应包含在该设备价格中的有（）。",[559,561,563,565,566],{"key":20,"text":560,"correct":26},"关税与增值税",{"key":24,"text":562,"correct":26},"进口国国内运费、装卸费",{"key":28,"text":564,"correct":22},"国际运输保险费",{"key":31,"text":278,"correct":22},{"key":34,"text":567,"correct":26},"外贸手续费","CD",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":241,"analysis":37},94073,"工程量清单计价的工程造价应由（）组成。",[573,575,577,579,581],{"key":20,"text":574,"correct":26},"间接费",{"key":24,"text":576,"correct":22},"措施项目费",{"key":28,"text":578,"correct":22},"其他项目费",{"key":31,"text":580,"correct":22},"规费和税金",{"key":34,"text":582,"correct":22},"分部分项工程费",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":97,"analysis":37},94074,"下列费用中，属于工程建设其他费用的有（ ）。",[587,588,590,591,592],{"key":20,"text":204,"correct":26},{"key":24,"text":589,"correct":26},"设备安装调试费",{"key":28,"text":208,"correct":22},{"key":31,"text":210,"correct":22},{"key":34,"text":212,"correct":22},{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":112,"analysis":37},94075,"下列费用中属于规费的有（ ）",[597,598,600,602,604],{"key":20,"text":450,"correct":22},{"key":24,"text":599,"correct":26},"检验试验费",{"key":28,"text":601,"correct":26},"财产保险费",{"key":31,"text":603,"correct":22},"工程排污费",{"key":34,"text":446,"correct":22},{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":255,"analysis":37},94076,"下列分部分项工程费中，正确的内容有（ ）。",[609,610,612,613,614],{"key":20,"text":247,"correct":22},{"key":24,"text":611,"correct":22},"施工机械使用费",{"key":28,"text":206,"correct":22},{"key":31,"text":249,"correct":22},{"key":34,"text":252,"correct":26},{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":36,"analysis":37},94077,"根据《建设工程工程量清单计价规范》，工程量清单中除了应包括分部分项工程量清单、措施项目清单外，还应包括（ ）。",[619,620,621,622,623],{"key":20,"text":465,"correct":22},{"key":24,"text":459,"correct":26},{"key":28,"text":461,"correct":22},{"key":31,"text":463,"correct":22},{"key":34,"text":624,"correct":26},"预备费项目清单",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":639,"analysis":37},94078,"预算定额中人工工日消耗量中的其他用工包括（ ）",[629,631,633,635,637],{"key":20,"text":630,"correct":22},"超运距用工",{"key":24,"text":632,"correct":26},"人工幅度差",{"key":28,"text":634,"correct":26},"基本用工",{"key":31,"text":636,"correct":22},"辅助用工",{"key":34,"text":638,"correct":26},"非定额用工","AD",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":324,"analysis":37},94079,"按照建设部2013年7月实施的《建筑安装工程费用项目组成》（建标【2013】44号）的规定，施工机具使用费包括（ ）。",[644,646,647,648,650],{"key":20,"text":645,"correct":22},"安拆费及场外运费",{"key":24,"text":247,"correct":22},{"key":28,"text":448,"correct":26},{"key":31,"text":649,"correct":22},"税费",{"key":34,"text":651,"correct":22},"仪器仪表使用费",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":392,"analysis":37},94080,"在投资估算与概算中，基本预备费的计算基数应包括（ ）",[656,657,659,660,662],{"key":20,"text":332,"correct":22},{"key":24,"text":658,"correct":22},"建筑安装工程费用",{"key":28,"text":334,"correct":22},{"key":31,"text":661,"correct":26},"建设期贷款利息",{"key":34,"text":663,"correct":26},"固定资产投资方向调节税",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":349,"analysis":37},94081,"关于工程量的有效位数的说法，正确的有（ ）。",[668,670,672,674,676],{"key":20,"text":669,"correct":22},"以“吨”为计量单位的应保留小数点三位，第四位小数四舍五入",{"key":24,"text":671,"correct":26},"以“吨”为计量单位的应保留小数点两位，第三位小数四舍五入",{"key":28,"text":673,"correct":22},"以“立方米“平方米”“米”“千克”为计量单位的应保留小数点两位，第三位小数四舍五入",{"key":31,"text":675,"correct":22},"以“千克”为计量单位的应保留小数点两位，第三位小数四舍五入",{"key":34,"text":677,"correct":22},"以“个”“项”等为单位，应取整数",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":52,"analysis":37},94082,"下列属于人工工日消耗量的内容有（ ）。",[682,683,684,685,687],{"key":20,"text":630,"correct":22},{"key":24,"text":632,"correct":22},{"key":28,"text":634,"correct":22},{"key":31,"text":686,"correct":26},"偶然用工",{"key":34,"text":636,"correct":22},[689,693,696,699,702,704],{"id":690,"name":691,"category":7,"favorite":692},109,"发布证券研究报告业务",1,{"id":694,"name":695,"category":7,"favorite":8},30,"经济师",{"id":697,"name":698,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":700,"name":701,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":703,"category":7,"favorite":8},"(初级)保险专业",{"id":705,"name":706,"category":7,"favorite":8},51,"(初级)财政税收"]