[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-47":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":692},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,47,50,2598,[13,38,53,68,82,94,108,123,137,148,158,172,187,202,216,230,243,258,273,288,301,315,329,338,351,363,372,386,400,414,428,442,456,471,485,499,513,527,541,556,570,579,594,604,615,625,639,653,663,677],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},93982,2,"多选题","下列工作中，不属于总监理工程师职责的有()。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","负责编制监理实施细则",true,{"key":24,"text":25,"correct":26},"B","组织召开监理例会",false,{"key":28,"text":29,"correct":26},"C","组织审查施工组织设计、（专项）施工方案",{"key":31,"text":32,"correct":22},"D","验收检验批、隐蔽工程、分项工程",{"key":34,"text":35,"correct":22},"E","复核工程计量有关数据","ADE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},93983,"监理实施细则应包括()主要内容。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"专业工程特点",{"key":24,"text":45,"correct":22},"监理工作流程",{"key":28,"text":47,"correct":22},"监理工作要点",{"key":31,"text":49,"correct":26},"监理工作制度",{"key":34,"text":51,"correct":22},"监理工作方法及措施","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},93984,"下列选项中，项目监理机构可设置总监理工程师代表的情形有( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"工程规模较大，专业较复杂，总监理工程师难以处理多个专业工程",{"key":24,"text":60,"correct":22},"一个建设工程监理合同中包含多个相对独立的施工合同",{"key":28,"text":62,"correct":26},"工程规模比较大，工期比较长",{"key":31,"text":64,"correct":22},"工程规模较大，地域比较分散",{"key":34,"text":66,"correct":26},"工程规模比较小，技术要求比较高","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":81,"analysis":37},93985,"下列监理人员的职责中，属于监理员应履行的职责有( )。",[72,74,76,77,79],{"key":20,"text":73,"correct":26},"检查进场的工程材料、构配件、设备的质量",{"key":24,"text":75,"correct":22},"进行见证取样",{"key":28,"text":35,"correct":22},{"key":31,"text":78,"correct":22},"检查工序施工结果",{"key":34,"text":80,"correct":26},"组织编写监理日志，参与编写监理月报","BCD",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":52,"analysis":37},93986,"依据《建设工程监理规范》监理规划的内容包括（ ）。",[86,88,90,91,92],{"key":20,"text":87,"correct":22},"工程概况",{"key":24,"text":89,"correct":22},"工程质量控制",{"key":28,"text":49,"correct":22},{"key":31,"text":47,"correct":26},{"key":34,"text":93,"correct":22},"监理工作设施",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":107,"analysis":37},93987,"建设工程监理规划是指导项目监理机构全面开展监理工作的指导性文件,其主要内容有()。",[98,100,102,104,106],{"key":20,"text":99,"correct":22},"监理工作的范围、内容、目标",{"key":24,"text":101,"correct":26},"项目隐蔽工程的验收标准",{"key":28,"text":103,"correct":22},"监理组织形式",{"key":31,"text":105,"correct":22},"监理人员岗位职责",{"key":34,"text":49,"correct":22},"ACDE",{"id":109,"libraryId":5,"type":15,"typeLabel":16,"stem":110,"options":111,"answer":122,"analysis":37},93988,"关于监理人工程监理职责的说法，正确的有（）。",[112,114,116,118,120],{"key":20,"text":113,"correct":22},"监理人应按合同约定指派总监理工程师，并在约定期限内到职",{"key":24,"text":115,"correct":26},"监理人应向委托人提供高水平的技术服务并全力维护委托人的权益",{"key":28,"text":117,"correct":22},"监理人为履行合同发出的一切函件均应由总监理工程师签字确认",{"key":31,"text":119,"correct":22},"监理人应对施工承包人在缺陷责任期的质量缺陷修复进行监理",{"key":34,"text":121,"correct":26},"在监理工作完成或终止时监理人应将委托人提供的设施移交承包商","ACD",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":136,"analysis":37},93989,"监理实施细则应依据（ ）进行编制。",[127,129,131,132,134],{"key":20,"text":128,"correct":26},"委托方要求",{"key":24,"text":130,"correct":22},"已批准的监理规划",{"key":28,"text":49,"correct":26},{"key":31,"text":133,"correct":22},"与专业工程相关的标准、设计文件和技术资料",{"key":34,"text":135,"correct":22},"施工组织设计、(专项）施工方案","BDE",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":36,"analysis":37},93990,"下列属于专业监理工程师职责的是（ ）。",[141,142,143,144,146],{"key":20,"text":73,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":75,"correct":26},{"key":31,"text":145,"correct":22},"处置发现的质量问题和安全事故隐患",{"key":34,"text":147,"correct":22},"进行工程计量",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":157,"analysis":37},93991,"监理实施细则的内容包括（ ）。",[152,153,154,155,156],{"key":20,"text":43,"correct":22},{"key":24,"text":45,"correct":22},{"key":28,"text":49,"correct":26},{"key":31,"text":47,"correct":22},{"key":34,"text":51,"correct":22},"ABDE",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":107,"analysis":37},93992,"我国现阶段建设工程监理的特点主要有（ ）。",[162,164,166,168,170],{"key":20,"text":163,"correct":22},"建设工程的服务对象具有单一性",{"key":24,"text":165,"correct":26},"建设工程监理的服务对象具有多重性",{"key":28,"text":167,"correct":22},"建设工程监理制度推行具有强制性",{"key":31,"text":169,"correct":22},"建设工程监理具有监督功能",{"key":34,"text":171,"correct":22},"对建设监理的市场准入采取双重控制",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},93993,"下列工作中，属于总监理工程师职责的有（）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"确定项目监理机构人员的分工和岗位职责",{"key":24,"text":179,"correct":22},"主持编写项目监理规划",{"key":28,"text":181,"correct":26},"负责编制专业监理实施细则",{"key":31,"text":183,"correct":26},"根据专业监理工作实施情况做好监理日记",{"key":34,"text":185,"correct":22},"审核签署承包单位的申请、支付证书和竣工结算","ABE",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":201,"analysis":37},93994,"下列建设工程项目目标控制措施中，属于计划实施中被动控制措施的有（）。",[191,193,195,197,199],{"key":20,"text":192,"correct":26},"识别风险。为项目风险分析和风险管理提供依据",{"key":24,"text":194,"correct":22},"对项目实施过程进行跟踪、测试、检查，发现异常情况及时采取纠偏措施",{"key":28,"text":196,"correct":22},"明确项目管理组织中过程控制人员的职责，发现情况及时采取措施进行处理",{"key":31,"text":198,"correct":26},"加强信息收集、整理和研究，为预测工程未来发展状况提供可靠的依据",{"key":34,"text":200,"correct":22},"建立有效的信息反馈系统，及时反馈偏差情况并采取措施纠偏","BCE",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":107,"analysis":37},93995,"项目监理机构的组织结构设计的内容有（ ）。",[206,208,210,212,214],{"key":20,"text":207,"correct":22},"合理确定管理层次与管理跨度",{"key":24,"text":209,"correct":26},"确定监理工作内容",{"key":28,"text":211,"correct":22},"划分项目监理机构部门",{"key":31,"text":213,"correct":22},"制定岗位职责及考核标准",{"key":34,"text":215,"correct":22},"选择组织结构形式",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":186,"analysis":37},93996,"对建设工程进度进行全方位控制时，应做到（）。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"对建设工程所有工程内容的进度都要进行控制",{"key":24,"text":223,"correct":22},"对建设工程所有工作内容的进度都要进行控制",{"key":28,"text":225,"correct":26},"在确定进度目标时，不能对投资和质量目标产生影响",{"key":31,"text":227,"correct":26},"在编制进度计划时，应将各阶段工作内容进行充分搭接",{"key":34,"text":229,"correct":22},"对影响进度的各种因素都要进行控制",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":242,"analysis":37},93997,"下列建设工程项目目标控制措施中，属于主动控制的有（）",[234,235,236,238,240],{"key":20,"text":194,"correct":26},{"key":24,"text":196,"correct":26},{"key":28,"text":237,"correct":22},"分析影响项目目标和计划实施的各种因素，并将其融入计划及管理职能之中",{"key":31,"text":239,"correct":22},"识别风险．在项目计划实施过程中做好风险管理工作",{"key":34,"text":241,"correct":22},"制定必要的备用方案，以应对可能出现的影响目标或计划实现的情况","CDE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},93998,"下列监理工作中．属于建设工程监理规划内容的有（）。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"明确项目监理机构的工作目标",{"key":24,"text":250,"correct":26},"制定隐蔽工程验收标准",{"key":28,"text":252,"correct":22},"制定完善的监理工作制度",{"key":31,"text":254,"correct":26},"编写各专业监理工作计划",{"key":34,"text":256,"correct":22},"明确开展监理工作的程序、方法和措施","ACE",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":272,"analysis":37},93999,"关于监理规划、监理实施细则的说法，正确的有( )。",[262,264,266,268,270],{"key":20,"text":263,"correct":26},"监理实施细则是项目监理机构全面开展工程监理工作的指导性文件",{"key":24,"text":265,"correct":22},"监理规划应由总监理工程师组织专业监理工程师编制",{"key":28,"text":267,"correct":22},"对专业性较强、危险性较大的分部分项工程，项目监理机构应编制监理实施细则",{"key":31,"text":269,"correct":22},"监理实施细则应在监理规划的基础上编制",{"key":34,"text":271,"correct":22},"监理实施细则经总监理工程师批准后实施","BCDE",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":287,"analysis":37},94000,"监理单位审查施工单位的管理制度、人员资格及验收手续时，项目监理机构应( )。",[277,279,281,283,285],{"key":20,"text":278,"correct":22},"审查施工单位现场安全生产规章制度的建立和实施情况",{"key":24,"text":280,"correct":22},"审查施工单位安全生产许可证的符合性和有效性",{"key":28,"text":282,"correct":22},"审查施工单位项目经理、专职安全生产管理人员和特种作业人员的资格",{"key":31,"text":284,"correct":22},"核查施工机械和设施的安全许可验收手续",{"key":34,"text":286,"correct":26},"审查专项施工方案","ABCD",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":81,"analysis":37},94001,"下列监理人员的职责中，属于总监理工程师职责的有（ ）。",[292,294,295,297,299],{"key":20,"text":293,"correct":26},"组织复核工程计量有关数据",{"key":24,"text":25,"correct":22},{"key":28,"text":296,"correct":22},"组织审查施工组织设计",{"key":31,"text":298,"correct":22},"组织验收分部工程",{"key":34,"text":300,"correct":26},"检查进场的工程材料和配构件的质量",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":287,"analysis":37},94002,"工程监理的性质有（ ）。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"服务性",{"key":24,"text":308,"correct":22},"科学性",{"key":28,"text":310,"correct":22},"独立性",{"key":31,"text":312,"correct":22},"公平性",{"key":34,"text":314,"correct":26},"先进性",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":107,"analysis":37},94003,"根据《建设工程监理范围和规模标准规定》（建设部令第86号）规定，下列工程中，必须进行工程监理的有（ ）。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"国家重点建设工程",{"key":24,"text":322,"correct":26},"项目总投资额为2500万元的商业项目",{"key":28,"text":324,"correct":22},"项目总投资额为4000万元的供热市政工程项目",{"key":31,"text":326,"correct":22},"建筑面积为6万平方米的住宅建设工程",{"key":34,"text":328,"correct":22},"利用外国政府援助资金的工程",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":122,"analysis":37},94004,"关于监理人工程监理职责的说法，正确的有（ ）。",[333,334,335,336,337],{"key":20,"text":113,"correct":22},{"key":24,"text":115,"correct":26},{"key":28,"text":117,"correct":22},{"key":31,"text":119,"correct":22},{"key":34,"text":121,"correct":26},{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":136,"analysis":37},94005,"下列管理工作中，属于专业监理工程师职责的有（ ）。",[342,344,345,347,349],{"key":20,"text":343,"correct":26},"签发工程款支付证书",{"key":24,"text":21,"correct":22},{"key":28,"text":346,"correct":26},"复核与工程计量有关的数据",{"key":31,"text":348,"correct":22},"处置质量问题和安全事故隐患",{"key":34,"text":350,"correct":22},"检查进场的工程材料、设备、构配件的质量",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":242,"analysis":37},94006,"下列监理人员的职责中，属于总监理工程师不得将其委托给总监理工程师代表的有（ ）。",[355,356,358,360,362],{"key":20,"text":25,"correct":26},{"key":24,"text":357,"correct":26},"组织审查和处理工程变更",{"key":28,"text":359,"correct":22},"组织编制监理规划",{"key":31,"text":361,"correct":22},"签发开工令和复工令",{"key":34,"text":296,"correct":22},{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":107,"analysis":37},94007,"建设工程监理规划是指导项目监理机构全面开展监理工作的指导性文件，其主要内容有（ ）。",[367,368,369,370,371],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":26},{"key":28,"text":103,"correct":22},{"key":31,"text":105,"correct":22},{"key":34,"text":49,"correct":22},{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":257,"analysis":37},94008,"见证取样涉及三方行为，这三方是（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"施工方",{"key":24,"text":379,"correct":26},"设计方",{"key":28,"text":381,"correct":22},"见证方",{"key":31,"text":383,"correct":26},"勘察方",{"key":34,"text":385,"correct":22},"监测方",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":67,"analysis":37},94009,"网络计划的目标由工程项目的目标决定，一般可分为( )等。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"时间目标",{"key":24,"text":393,"correct":22},"时间一资源目标",{"key":28,"text":395,"correct":26},"时间一定额目标",{"key":31,"text":397,"correct":22},"时间一成本目标",{"key":34,"text":399,"correct":26},"时间一计划目标",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":157,"analysis":37},94010,"在绘制网络图阶段，分析各项工作的逻辑关系时，需要考虑的因素有( )。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"施工程序",{"key":24,"text":407,"correct":22},"工艺技术",{"key":28,"text":409,"correct":26},"资金限制",{"key":31,"text":411,"correct":22},"组织安排",{"key":34,"text":413,"correct":22},"资源调配",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":272,"analysis":37},94011,"与横道计划相比，网络计划的主要优点是( )。",[418,420,422,424,426],{"key":20,"text":419,"correct":26},"简单、形象、直观",{"key":24,"text":421,"correct":22},"各工作之间的逻辑关系明确",{"key":28,"text":423,"correct":22},"确定影响工程总工期的关键工作",{"key":31,"text":425,"correct":22},"可合理地进行资源配置",{"key":34,"text":427,"correct":22},"能运用计算机对计划进行有效的监督与控制",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":67,"analysis":37},94013,"下列有关网络计划中工作最早完成时间的说法中，正确的是（ ）。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"工作最早完成时间等于本工作的最早开始时间加上其持续时间",{"key":24,"text":435,"correct":22},"工作最早完成时间可从网络计划的起点向终点方向依次进行计算",{"key":28,"text":437,"correct":26},"工作最早完成时间是指各先行工作完成后，本工作必须完成的时间",{"key":31,"text":439,"correct":22},"工作最早完成时间是指各紧前工作全部完成后，本工作有可能完成的最早时间",{"key":34,"text":441,"correct":26},"工作最早完成时间是指不影响总工期的前提下，工作必须完成的最早时间",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":257,"analysis":37},94014,"在绘制双代号网络图时，应遵循的基本规则有( )。",[446,448,450,452,454],{"key":20,"text":447,"correct":22},"双代号网络图必须正确表达已定的逻辑关系",{"key":24,"text":449,"correct":26},"双代号网络图中，可以出现循环回路",{"key":28,"text":451,"correct":22},"双代号网络图中，在节点之间严禁出现带双向箭头或无箭头的连线",{"key":31,"text":453,"correct":26},"网络图中的节点都必须有编号，其编号可以重复",{"key":34,"text":455,"correct":22},"双代号网络图中，严禁出现没有箭头节点或没有箭尾节点的箭线",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":470,"analysis":37},94015,"在绘制网络图时，表示箭线交叉的方法有( )。",[460,462,464,466,468],{"key":20,"text":461,"correct":22},"过桥法",{"key":24,"text":463,"correct":26},"母线法",{"key":28,"text":465,"correct":26},"分段法",{"key":31,"text":467,"correct":22},"指向法",{"key":34,"text":469,"correct":26},"流水法","AD",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":136,"analysis":37},94016,"某分部工程的双代号网络计划如下图所示，图中的绘制错误有( )。",[475,477,479,481,483],{"key":20,"text":476,"correct":26},"有多个终点节点",{"key":24,"text":478,"correct":22},"有多个起点节点",{"key":28,"text":480,"correct":26},"出现循环回路",{"key":31,"text":482,"correct":22},"有多余的虚工作",{"key":34,"text":484,"correct":22},"节点编号有误",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":186,"analysis":37},94017,"某工程项目的单代号网络计划如下图所示，其关键工作有( )。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"工作B",{"key":24,"text":492,"correct":22},"工作C",{"key":28,"text":494,"correct":26},"工作D",{"key":31,"text":496,"correct":26},"工作F",{"key":34,"text":498,"correct":22},"工作H",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":257,"analysis":37},94018,"某单代号网络计划中，工作D的最早开始时间为第7天，持续时间为8天。其两项紧后工作E和F的最早开始时间分别为第17天和第20天，工作E和F的总时差分别为4天和2天，则工作D的( )。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"总时差为6天",{"key":24,"text":506,"correct":26},"总时差为7天",{"key":28,"text":508,"correct":22},"自由时差为2天",{"key":31,"text":510,"correct":26},"自由时差为5天",{"key":34,"text":512,"correct":22},"最迟完成时间为第21天",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":186,"analysis":37},94019,"某工程网络计划中，已知工作M的自由时差为5天。在该网络计划的实施过程中检查发现，工作M的持续时间比原计划延长了2天，而其他工作正常。检查结果表明该工作( )。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"不会使总工期延长",{"key":24,"text":520,"correct":22},"不影响其后续工作的正常进行",{"key":28,"text":522,"correct":26},"将影响其紧后工作的正常进行",{"key":31,"text":524,"correct":26},"总时差不变、自由时差减少2天",{"key":34,"text":526,"correct":22},"总时差和自由时差各减少2天",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":272,"analysis":37},94020,"下列关于双代号时标网络计划的说法，正确的有( )。",[531,533,535,537,539],{"key":20,"text":532,"correct":26},"虚箭线只能水平画",{"key":24,"text":534,"correct":22},"双代号时标网络计划具有横道计划直观易懂的优点",{"key":28,"text":536,"correct":22},"双代号时标网络计划将时间参数直观地表达出来",{"key":31,"text":538,"correct":22},"实箭线的水平投影长度表示该工作的持续时间",{"key":34,"text":540,"correct":22},"必须以水平时间坐标为尺度表示工作时间",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":555,"analysis":37},94021,"进度计划的调整方法有( )。",[545,547,549,551,553],{"key":20,"text":546,"correct":22},"改变某些工作间的逻辑关系",{"key":24,"text":548,"correct":22},"缩短某些工作的持续时间",{"key":28,"text":550,"correct":26},"将流水进行的工作改为顺序作业",{"key":31,"text":552,"correct":26},"将搭接进行的工作改为顺序作业",{"key":34,"text":554,"correct":26},"缩短未超过计划工期的非关键线路上的工作","AB",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":242,"analysis":37},94022,"某工程项目的双代号时标网络计划如下图所示，项目进行到第6周末时，检查实际进度并绘制出实际进度前锋线。关于工作进度对工期影响的说法，正确的有( )。",[560,562,564,566,568],{"key":20,"text":561,"correct":26},"工作B将使工期拖延3周",{"key":24,"text":563,"correct":26},"工作C将使工期拖延1周",{"key":28,"text":565,"correct":22},"工作D将使工期拖延2周",{"key":31,"text":567,"correct":22},"工作C不影响工期和紧后工作",{"key":34,"text":569,"correct":22},"工作B将使工期拖延2周、紧后工作最早开始时间推迟3周",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":186,"analysis":37},94023,"某工程项目的单代号网络计划如下图所示，其关键工作有（ ）。",[574,575,576,577,578],{"key":20,"text":490,"correct":22},{"key":24,"text":492,"correct":22},{"key":28,"text":494,"correct":26},{"key":31,"text":496,"correct":26},{"key":34,"text":498,"correct":22},{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":593,"analysis":37},94024,"某单代号网络计划中，工作H与其紧后工作K和M的时间间隔分别为3周和6周．工作K和M的总时差分别为5周和3周，下列关于该网络计划时间参数的说法中，正确的为（）。",[583,585,587,589,591],{"key":20,"text":584,"correct":26},"工作K和M的时间间隔为3周",{"key":24,"text":586,"correct":26},"工作M的自由时差为9周",{"key":28,"text":588,"correct":22},"工作H的总时差为8周",{"key":31,"text":590,"correct":22},"工作H的自由时差为3周",{"key":34,"text":592,"correct":26},"工作K的自由时差为8周","CD",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":67,"analysis":37},94025,"下列有关网络计划中工作最早完成时间的说法中，正确的是（）。",[598,600,601,602,603],{"key":20,"text":599,"correct":22},"工作最早完成时问等于本工作的最早开始时间加上其持续时间",{"key":24,"text":435,"correct":22},{"key":28,"text":437,"correct":26},{"key":31,"text":439,"correct":22},{"key":34,"text":441,"correct":26},{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":67,"analysis":37},94026,"某工程网络计划中，已知工作M的自由时差为4天，在该网络计划的执行过程中发现工作M的持续时间比原计划延长了2天而其他工作正常，则此时工作M（）。",[608,609,610,612,613],{"key":20,"text":518,"correct":22},{"key":24,"text":520,"correct":22},{"key":28,"text":611,"correct":26},"总时差不变．自由时差减少2天",{"key":31,"text":526,"correct":22},{"key":34,"text":614,"correct":26},"自由时差不变．总时差减少2天",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":136,"analysis":37},94027,"某分部工程的双代号网络计划如下图所示，图中的绘制错误有（）。",[619,620,621,623,624],{"key":20,"text":476,"correct":26},{"key":24,"text":478,"correct":22},{"key":28,"text":622,"correct":26},"工作代号重复",{"key":31,"text":482,"correct":22},{"key":34,"text":484,"correct":22},{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":136,"analysis":37},94028,"在网络计划实施中，当实际进度比计划进度拖后或提前时，调整网络计划的方法有（）。",[629,631,633,635,637],{"key":20,"text":630,"correct":26},"调整进度前锋线",{"key":24,"text":632,"correct":22},"调整资源的投入",{"key":28,"text":634,"correct":26},"调整工作的最早开始时间",{"key":31,"text":636,"correct":22},"调整工作之间的逻辑关系",{"key":34,"text":638,"correct":22},"增、减工作项目",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":257,"analysis":37},94029,"某单代号网络计划中，工作B的最早开始时间为第8周，持续时间为6周。其两项紧后工作D和G的最早开始时间分别为第16周和第18周，工作D和G的总时差分别为3周和2周，则工作B的（）。",[643,645,647,649,651],{"key":20,"text":644,"correct":22},"总时差为5周",{"key":24,"text":646,"correct":26},"总时差为6周",{"key":28,"text":648,"correct":22},"自由时差为2周",{"key":31,"text":650,"correct":26},"自由时差为4周",{"key":34,"text":652,"correct":22},"最迟完成时间为第19周",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":107,"analysis":37},94030,"与横道计划相比，网络计划的主要优点是（）。",[657,658,659,661,662],{"key":20,"text":421,"correct":22},{"key":24,"text":419,"correct":26},{"key":28,"text":660,"correct":22},"能找出决定工程进度的关键工作",{"key":31,"text":425,"correct":22},{"key":34,"text":427,"correct":22},{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":122,"analysis":37},94031,"网络计划调整时，非关键工作在其时差范围内进行调整的目的有（ ）。",[667,669,671,673,675],{"key":20,"text":668,"correct":22},"更充分地利用资源",{"key":24,"text":670,"correct":26},"缩短非关键工作的持续时间",{"key":28,"text":672,"correct":22},"降低工程成本",{"key":31,"text":674,"correct":22},"满足工程施工的需要",{"key":34,"text":676,"correct":26},"缩短项目的总工期",{"id":678,"libraryId":5,"type":15,"typeLabel":16,"stem":679,"options":680,"answer":691,"analysis":37},94032,"网络计划中关键线路的确定需要具备的条件是（ ）。",[681,683,685,687,689],{"key":20,"text":682,"correct":26},"具有关键节点",{"key":24,"text":684,"correct":26},"具有总时差为零的工作",{"key":28,"text":686,"correct":26},"具有自由时差为零的工作",{"key":31,"text":688,"correct":22},"贯穿起点和终点的均是总时差最小的工作",{"key":34,"text":690,"correct":22},"所有工作之间的时间间隔均为零","DE",[693,697,700,703,706,708],{"id":694,"name":695,"category":7,"favorite":696},109,"发布证券研究报告业务",1,{"id":698,"name":699,"category":7,"favorite":8},30,"经济师",{"id":701,"name":702,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":704,"name":705,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":707,"category":7,"favorite":8},"(初级)保险专业",{"id":709,"name":710,"category":7,"favorite":8},51,"(初级)财政税收"]