[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-46":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":726},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,46,50,2598,[13,38,53,68,83,98,110,124,138,153,167,182,197,212,226,240,254,268,283,296,310,325,340,354,369,384,398,412,427,441,455,469,483,497,512,524,538,552,566,581,595,604,618,629,643,656,670,684,698,712],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},93932,2,"多选题","企业进行风险处理的财务对策主要有（）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","风险的财务转移",true,{"key":24,"text":25,"correct":22},"B","风险承受",{"key":27,"text":28,"correct":22},"C","自我保险",{"key":30,"text":31,"correct":32},"D","风险分散",false,{"key":34,"text":35,"correct":32},"E","风险规避","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},93933,"下列风险损失中，属于建筑工程保险第三者责任部分的保险责任的是（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"因震动造成临近地区第三者财产损失",{"key":24,"text":45,"correct":22},"建筑工程因意外事故造成工地第三者人身伤亡",{"key":27,"text":47,"correct":32},"工程承包人雇佣的职员所照管的财产发生损失",{"key":30,"text":49,"correct":22},"建筑工程因意外事故造成工地第三者财产损失",{"key":34,"text":51,"correct":32},"因原材料缺陷或工艺不善引起的保险财产本身的损失","BD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},93934,"下列关于风险控制措施的说法中，正确的有（）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"风险规避主要是中断风险源，使其不致发生或遏制其发展",{"key":24,"text":60,"correct":32},"规避风险是一种积极的防范手段",{"key":27,"text":62,"correct":32},"在施工过程中，承包商对材料进行分隔存放是风险分散的手段",{"key":30,"text":64,"correct":22},"承包商将某项工程分包，属于风险转移的手段",{"key":34,"text":66,"correct":22},"风险分散应成为承包商经营的主要策略之一","ADE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},93935,"建设工程设计责任保险按其保险标的的不同，可以分为（）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"多项工程保险",{"key":24,"text":75,"correct":22},"单项工程保险",{"key":27,"text":77,"correct":32},"单项工程综合年度保险",{"key":30,"text":79,"correct":22},"综合年度保险",{"key":34,"text":81,"correct":32},"单位工程综合年度保险","ABD",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},93936,"安装工程保险物质损失部分的责任免除主要有（）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"自然磨损、内在或潜在缺陷等",{"key":24,"text":90,"correct":32},"外力引起的机械或电气装置的本身损失",{"key":27,"text":92,"correct":22},"维修保养或正常检修费用",{"key":30,"text":94,"correct":22},"盘点时发现的短缺",{"key":34,"text":96,"correct":22},"设计错误引起的被保险财产本身的损失","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":109,"analysis":37},93937,"下列风险损失中，属于建筑工程保险物质损失部分的责任免除的是（）。",[102,104,105,107,108],{"key":20,"text":103,"correct":22},"由于设计错误引起的损失和费用",{"key":24,"text":45,"correct":32},{"key":27,"text":106,"correct":32},"因工程承包人雇佣的职员所照管的财产发生的损失",{"key":30,"text":43,"correct":32},{"key":34,"text":51,"correct":22},"AE",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":36,"analysis":37},93938,"工程保险与普通保险相比具有的显著特征有（）。",[114,116,118,120,122],{"key":20,"text":115,"correct":22},"风险广泛而集中",{"key":24,"text":117,"correct":22},"涉及较多的利害关系人",{"key":27,"text":119,"correct":22},"工程保险承保的是技术风险",{"key":30,"text":121,"correct":32},"工程保险的内容不交叉",{"key":34,"text":123,"correct":32},"保险金额具有不变性",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":82,"analysis":37},93939,"关于风险预测图的说法，正确的有（）。",[128,130,132,134,136],{"key":20,"text":129,"correct":22},"在进行风险分类前．先制定风险预测图",{"key":24,"text":131,"correct":22},"风险预测图中，不确定性因素的评价与其发生概率相关",{"key":27,"text":133,"correct":32},"风险预测图中的曲线离原点越近．风险越大",{"key":30,"text":135,"correct":22},"风险预测图中，风险的评价与潜在的危害相关",{"key":34,"text":137,"correct":32},"风险预测图采用立体的三维结构，其中一维表示风险的分布",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":152,"analysis":37},93940,"建设工程设计责任保险的保险责任有( )。",[142,144,146,148,150],{"key":20,"text":143,"correct":22},"建设工程本身的物质损失",{"key":24,"text":145,"correct":22},"第三者人身伤亡或财产损失",{"key":27,"text":147,"correct":32},"施工人员人身伤亡或医疗保险",{"key":30,"text":149,"correct":22},"经保险人书面同意的诉讼费用",{"key":34,"text":151,"correct":22},"为缩小或减少损失而支付的必要和合理的费用","ABDE",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":97,"analysis":37},93941,"下列策略中，属于风险应对策略的有( )。",[157,159,161,163,165],{"key":20,"text":158,"correct":22},"风险转移",{"key":24,"text":160,"correct":32},"风险量化",{"key":27,"text":162,"correct":22},"风险预防",{"key":30,"text":164,"correct":22},"风险自留",{"key":34,"text":166,"correct":22},"风险利用",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":181,"analysis":37},93942,"下列风险中，属于业主或开发商在项目实施阶段风险的有（ ）。",[171,173,175,177,179],{"key":20,"text":172,"correct":32},"项目产品需求变化",{"key":24,"text":174,"correct":32},"内部决策机制风险",{"key":27,"text":176,"correct":22},"监理工程师失职风险",{"key":30,"text":178,"correct":22},"承包商缺乏合作诚意",{"key":34,"text":180,"correct":22},"合同条款不严谨","CDE",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":196,"analysis":37},93943,"按风险造成的后果分类，工程风险可分为（ ）。",[186,188,190,192,194],{"key":20,"text":187,"correct":32},"自然风险",{"key":24,"text":189,"correct":22},"纯粹风险",{"key":27,"text":191,"correct":22},"投机风险",{"key":30,"text":193,"correct":32},"社会风险",{"key":34,"text":195,"correct":32},"经济风险","BC",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":211,"analysis":37},93944,"下列风险中，属于咨询设计者自身职业责任风险的有（ ）。",[201,203,205,207,209],{"key":20,"text":202,"correct":32},"咨询服务合同欠公平",{"key":24,"text":204,"correct":32},"承包商缺乏职业道德，偷工减料",{"key":27,"text":206,"correct":22},"投资估算和设计概算不准",{"key":30,"text":208,"correct":32},"服务范围与费用不相称",{"key":34,"text":210,"correct":22},"能力和水平不适应","CE",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":67,"analysis":37},93945,"下列属于承包商在签约履约阶段承担的风险有（ ）。",[216,218,220,222,224],{"key":20,"text":217,"correct":22},"合同条件不平等",{"key":24,"text":219,"correct":32},"竣工验收时发现的质量问题",{"key":27,"text":221,"correct":32},"选择投标代理人不当",{"key":30,"text":223,"correct":22},"工程施工管理能力不足",{"key":34,"text":225,"correct":22},"分包单位管理水平低下",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":152,"analysis":37},93946,"工程保险与传统的财产保险相比较，具备的特征有（ ）。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"风险具有特殊性",{"key":24,"text":233,"correct":22},"保障具有综合性",{"key":27,"text":235,"correct":32},"被保险人具有单一性",{"key":30,"text":237,"correct":22},"保险期限具有不确定性",{"key":34,"text":239,"correct":22},"保险金额具有变动性",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":152,"analysis":37},93947,"下列因素中，属于建筑工程保险费率厘定依据的有（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"承保责任范围",{"key":24,"text":247,"correct":22},"工程本身的危险程度",{"key":27,"text":249,"correct":32},"建设工程投资额",{"key":30,"text":251,"correct":22},"承包人及其他工程关系方的资信、经营管理水平及经验等条件",{"key":34,"text":253,"correct":22},"工程免赔额的高低及第三者责任和特种风险的赔偿限额",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":36,"analysis":37},93948,"在安装工程保险中，整个工期实行一次性费率的项目有（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"安装工程",{"key":24,"text":261,"correct":22},"土木建筑工程项目",{"key":27,"text":263,"correct":22},"场地清理费",{"key":30,"text":265,"correct":32},"第三者人身伤亡及损失",{"key":34,"text":267,"correct":32},"为安装工程施工用的承包人的机器设备",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":282,"analysis":37},93949,"下列属于工程监理责任险的免除责任的有（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"不可抗力",{"key":24,"text":275,"correct":22},"图纸资料损毁",{"key":27,"text":277,"correct":32},"未履行监理合同中约定的监理义务",{"key":30,"text":279,"correct":32},"做出错误指令导致所监理的工程发生工程质量事故",{"key":34,"text":281,"correct":22},"交叉责任","ABE",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":67,"analysis":37},93950,"建设工程设计责任保险包括（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"年度责任险",{"key":24,"text":290,"correct":32},"第三者责任险",{"key":27,"text":292,"correct":32},"物质财产险",{"key":30,"text":294,"correct":22},"项目责任险",{"key":34,"text":73,"correct":22},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":82,"analysis":37},93951,"意外伤害险保险责任的必要构成条件有（ ）。",[300,302,304,306,308],{"key":20,"text":301,"correct":22},"被保险人在保险期限内遭受意外伤害",{"key":24,"text":303,"correct":22},"被保险人在责任期限内死亡或残疾",{"key":27,"text":305,"correct":32},"被保险人在保险期限内死亡或残疾",{"key":30,"text":307,"correct":22},"被保险人所受意外伤害是其死亡或残疾的直接原因或近因",{"key":34,"text":309,"correct":32},"被保险人所受意外伤害是其死亡或残疾的原因之一",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":324,"analysis":37},93952,"与传统的建筑安装工程一切险相比，工程质量保证保险的不同之处有（ ）。",[314,316,318,320,322],{"key":20,"text":315,"correct":32},"工程质量保证保险主要保障自然灾害、意外事故、外来原因和人为过失造成的损失",{"key":24,"text":317,"correct":22},"工程质量保证保险的被保险人通常是开发商",{"key":27,"text":319,"correct":22},"工程质量保证保险的保险金额依据工程竣工结算总造价确定，保额不变",{"key":30,"text":321,"correct":22},"工程质量保证保险通常在工程竣工验收后再出具正式保险单",{"key":34,"text":323,"correct":22},"工程质量保证保险，通常由保险人聘请第三方风险管理机构出具风险评估报告","BCDE",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":339,"analysis":37},93953,"项目监理机构在工程施工阶段造价控制的主要任务有( )。",[329,331,333,335,337],{"key":20,"text":330,"correct":22},"预防并处理好费用索赔",{"key":24,"text":332,"correct":22},"挖掘降低造价潜力",{"key":27,"text":334,"correct":22},"控制工程付款",{"key":30,"text":336,"correct":22},"控制工程变更费用",{"key":34,"text":338,"correct":32},"确定造价控制目标","ABCD",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":339,"analysis":37},93954,"项目监理机构发现( )情形时，总监理工程师应及时签发工程暂停令。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"建设单位要求暂停施工且工程需要暂停施工的",{"key":24,"text":347,"correct":22},"施工单位未经批准擅自施工的",{"key":27,"text":349,"correct":22},"施工单位未按审查通过的工程设计文件施工的",{"key":30,"text":351,"correct":22},"施工存在重大质量、安全事故隐患或发生质量、安全事故的",{"key":34,"text":353,"correct":32},"施工单位违反工程建设推荐性标准的",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":368,"analysis":37},93955,"项目监理机构实施组织协调的常用方法有()。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"会议协调",{"key":24,"text":361,"correct":32},"行政协调",{"key":27,"text":363,"correct":22},"交谈协调",{"key":30,"text":365,"correct":32},"指令协调",{"key":34,"text":367,"correct":22},"书面协调","ACE",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":383,"analysis":37},93956,"下列各项中，属于平行检验内容的有()。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"工程实体量测",{"key":24,"text":376,"correct":32},"关键部位",{"key":27,"text":378,"correct":32},"关键工序",{"key":30,"text":380,"correct":22},"材料检验",{"key":34,"text":382,"correct":32},"涉及结构安全的试块","AD",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":324,"analysis":37},93957,"旁站监理人员的工作职责有( )。",[388,390,392,394,396],{"key":20,"text":389,"correct":32},"确定工程的开工时间和结束时间",{"key":24,"text":391,"correct":22},"检查施工企业现场质量管理人员到岗情况",{"key":27,"text":393,"correct":22},"核查进场建筑材料、建筑构配件等的质量检验报告",{"key":30,"text":395,"correct":22},"在现场跟班监督关键部位、关键工序的施工方案及工程建设强制性标准执行隋况",{"key":34,"text":397,"correct":22},"做好旁站监理记录和监理日记，保存旁站监理原始资料",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":324,"analysis":37},93958,"建设工程监理文件资料管理的主要内容包括( )。",[402,404,406,408,410],{"key":20,"text":403,"correct":32},"监理文件档案资料收文与登记",{"key":24,"text":405,"correct":22},"监理文件档案资料组卷归档",{"key":27,"text":407,"correct":22},"监理文件档案资料收发文与登记",{"key":30,"text":409,"correct":22},"监理文件档案资料分类存放",{"key":34,"text":411,"correct":22},"监理文件档案资料传阅",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":426,"analysis":37},93959,"项目监理机构应审查施工单位报审的专项施工方案，专项施工方案审查的基本内容包括()。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"编审程序应符合相关规定",{"key":24,"text":419,"correct":32},"工程质量保证措施应符合有关标准",{"key":27,"text":421,"correct":22},"安全技术措施应符合工程建设强制性标准",{"key":30,"text":423,"correct":32},"资源（资金、劳动力、材料、设备）供应计划应满足工程施工需要",{"key":34,"text":425,"correct":32},"施工总平面布置应科学合理","AC",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":339,"analysis":37},93960,"目标控制是工程监理工作的内容之一，下列属于目标控制措施的是（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"组织措施",{"key":24,"text":434,"correct":22},"技术措施",{"key":27,"text":436,"correct":22},"经济措施",{"key":30,"text":438,"correct":22},"合同措施",{"key":34,"text":440,"correct":32},"信息措施",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":383,"analysis":37},93961,"监理人员在进行巡视检查时，主要关注（ ）的情况。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"施工质量",{"key":24,"text":448,"correct":32},"施工进度",{"key":27,"text":450,"correct":32},"工程造价",{"key":30,"text":452,"correct":22},"安全生产",{"key":34,"text":454,"correct":32},"施工合同",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":152,"analysis":37},93962,"项目监理机构主要采用（ ）的方式实施监理。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"巡视",{"key":24,"text":462,"correct":22},"平行检验",{"key":27,"text":464,"correct":32},"现场记录",{"key":30,"text":466,"correct":22},"旁站",{"key":34,"text":468,"correct":22},"见证取样",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":368,"analysis":37},93963,"见证取样涉及三方行为，这三方是（）。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"施工方",{"key":24,"text":476,"correct":32},"设计方",{"key":27,"text":478,"correct":22},"见证方",{"key":30,"text":480,"correct":32},"勘察方",{"key":34,"text":482,"correct":22},"监测方",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":426,"analysis":37},93964,"下列属于目标控制中组织措施的是（ ）。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"明确各级目标控制人员的任务和职责分工",{"key":24,"text":490,"correct":32},"在整个建设工程实施过程中，还需要采用工程网络计划技术、 信息化技术等实施动态控制",{"key":27,"text":492,"correct":22},"加强动态控制过程中的激励措施，调动和发挥员工实现建设工程目标的积极性和创造性等",{"key":30,"text":494,"correct":32},"通过投资偏差分析和未 完工程投资预测，可发现一些可能引起未完工程投资增加的潜在问题",{"key":34,"text":496,"correct":32},"选择合理的承发包 模式和合同计价方式",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":511,"analysis":37},93965,"下列关于见证取样的表述中，不正确的是（ ）。",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"见证取样的内容包括工程实体量测（检查、试验、检测) 和材料检验等内容",{"key":24,"text":504,"correct":22},"见证取样是项目监理机构对工程的关键部位或关键工序的施工质量进行的监督活动",{"key":27,"text":506,"correct":32},"总监理工程师应督促专业监理工程师制定见证取样实施细则，并检查监理人员见证取样工作实施情况，包括现场检查和资料检查",{"key":30,"text":508,"correct":32},"见证取样监理人员应根据见证取样实施细则要求、按程序实施见证取样工作，在检验委托单签字，并出示“见证员证书”",{"key":34,"text":510,"correct":32},"见证取样监理人员协助建立包括见证取样送检计划、台账等在内的见证取样档案等","AB",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":339,"analysis":37},93966,"下列属于项目监理机构需要签发工程暂停令的情形是（ ）。",[516,517,519,520,522],{"key":20,"text":345,"correct":22},{"key":24,"text":518,"correct":22},"施工单位未经批准擅自施工或拒绝项目监理机构管理的",{"key":27,"text":349,"correct":22},{"key":30,"text":521,"correct":22},"施工单位违反工程建设强制性标准的",{"key":34,"text":523,"correct":32},"施工存在一般质量、安全事故隐患或发生质量、安全事故的",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":339,"analysis":37},93967,"属于工程监理单位法律责任的是( )。",[528,530,532,534,536],{"key":20,"text":529,"correct":22},"超越资质承揽工程的法律责任",{"key":24,"text":531,"correct":22},"出借资质的法律责任",{"key":27,"text":533,"correct":22},"转让监理业务的法律责任",{"key":30,"text":535,"correct":22},"不按约定履行监理义务的法律责任",{"key":34,"text":537,"correct":32},"未移交档案的法律责任",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":152,"analysis":37},93968,"我国工程建设管理基本制度包括( )。",[542,544,546,548,550],{"key":20,"text":543,"correct":22},"工程监理制",{"key":24,"text":545,"correct":22},"项目法人责任制",{"key":27,"text":547,"correct":32},"竣工验收制",{"key":30,"text":549,"correct":22},"招标投标制",{"key":34,"text":551,"correct":22},"合同管理制",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":152,"analysis":37},93969,"工程监理机构实施工程监理的依据有( )。",[556,558,560,562,564],{"key":20,"text":557,"correct":22},"法律法规",{"key":24,"text":559,"correct":22},"建设工程建设标准",{"key":27,"text":561,"correct":32},"建设工程建议书",{"key":30,"text":563,"correct":22},"勘察设计文件",{"key":34,"text":565,"correct":22},"建设工程监理合同",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":580,"analysis":37},93970,"根据《建筑法》规定，强制工程监理制度的工程建设项目范围包括()。",[570,572,574,576,578],{"key":20,"text":571,"correct":22},"国家重点建设工程",{"key":24,"text":573,"correct":22},"大中型公用事业工程",{"key":27,"text":575,"correct":22},"成片开发建设的住宅小区工程",{"key":30,"text":577,"correct":32},"私人住宅工程",{"key":34,"text":579,"correct":22},"国际组织援助工程","ABCE",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":368,"analysis":37},93971,"根据《建设工程监理范围和规模标准规定》（建设部令第86号），在下列工程中，属于实行强制性监理工程范围的有()。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"项目总投资为4000万元的给水工程",{"key":24,"text":588,"correct":32},"项目总投资为2000万元的供热工程",{"key":27,"text":590,"correct":22},"建筑面积为80000m2的住宅建设工程",{"key":30,"text":592,"correct":32},"建筑面积为40000m2的住宅建设工程",{"key":34,"text":594,"correct":22},"总投资为1000万元的学校",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":36,"analysis":37},93972,"依据《建设工程质量管理条例》，工程监理单位超越本单位资质等级承揽工程的，应受到（ ）处罚。 A.责令停止违法行为或改正 B.处合同约定的监理酬金1倍以上2倍以下的罚款 C.降低资质等级 D.吊销营业执照",[599,600,601,602,603],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":32},{"key":34,"text":34,"correct":32},{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":580,"analysis":37},93973,"工程监理的性质可以概括为（ ）。",[608,610,612,614,616],{"key":20,"text":609,"correct":22},"服务性",{"key":24,"text":611,"correct":22},"科学性",{"key":27,"text":613,"correct":22},"独立性",{"key":30,"text":615,"correct":32},"公开性",{"key":34,"text":617,"correct":22},"公平性",{"id":619,"libraryId":5,"type":15,"typeLabel":16,"stem":620,"options":621,"answer":97,"analysis":37},93974,"依据《建设工程质量管理条例》，下列工程项目中必须实施监理的是（ ）。",[622,623,625,626,627],{"key":20,"text":571,"correct":22},{"key":24,"text":624,"correct":32},"技术特别复杂的建设工程",{"key":27,"text":573,"correct":22},{"key":30,"text":575,"correct":22},{"key":34,"text":628,"correct":22},"利用外国政府贷款的工程",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":67,"analysis":37},93975,"下列工作内容中，属于工程监理工作内容的有( )。",[633,635,637,639,641],{"key":20,"text":634,"correct":22},"编制监理规划",{"key":24,"text":636,"correct":32},"组织编写施工组织设计",{"key":27,"text":638,"correct":32},"自主签发工程暂停令和复工令",{"key":30,"text":640,"correct":22},"验收隐蔽工程、分部分项工程",{"key":34,"text":642,"correct":22},"审查施工承包人提交的竣工结算申请",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":152,"analysis":37},93976,"监理单位总监理工程师应当按照( )进行监理，对施工质量承担监理责任。",[647,648,650,652,654],{"key":20,"text":557,"correct":22},{"key":24,"text":649,"correct":22},"有关技术标准",{"key":27,"text":651,"correct":32},"可行性研究报告",{"key":30,"text":653,"correct":22},"设计文件",{"key":34,"text":655,"correct":22},"工程承包合同",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":97,"analysis":37},93977,"下列行为中，属于监理人违约的行为有( )。",[660,662,664,666,668],{"key":20,"text":661,"correct":22},"监理文件不符合规范标准及合同约定",{"key":24,"text":663,"correct":32},"委托人原因造成监理停止",{"key":27,"text":665,"correct":22},"监理人转让监理工作",{"key":30,"text":667,"correct":22},"监理人未按合同约定实施监理并造成工程损失趟鹗?",{"key":34,"text":669,"correct":22},"监理人无法履行或停止履行合同",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":368,"analysis":37},93978,"下列关于工程监理职责中表述正确的是（ ）。",[674,676,678,680,682],{"key":20,"text":675,"correct":22},"监理人更换总监理工程师应事先征得委托人同意，并应在更换14天前将拟更换的总监理工程师的姓名和详细资料提交委托人",{"key":24,"text":677,"correct":32},"总监理工程师2天内不能履行职责的，应及时通知委托人，并委派代表代行其职责",{"key":27,"text":679,"correct":22},"监理人为履行合同发出的一切函件均应盖有监理人单位章或由监理人授权的项目机构章，并由监理人的总监理工程师签字确认",{"key":30,"text":681,"correct":32},"合同履行中，监理人可对委托人要求提出合理化建议，并及时口头通知委托人",{"key":34,"text":683,"correct":22},"监理人应对施工承包人在缺陷责任期的质量缺陷修复进行监理",{"id":685,"libraryId":5,"type":15,"typeLabel":16,"stem":686,"options":687,"answer":339,"analysis":37},93979,"设立项目监理机构时，应满足的基本要求包括( )。",[688,690,692,694,696],{"key":20,"text":689,"correct":22},"项目监理机构设立应遵循适应、精简、高效的原则",{"key":24,"text":691,"correct":22},"项目监理机构应有满足专业和数量要求的监理人员",{"key":27,"text":693,"correct":22},"一名注册监理工程师可担任一项建设工程监理合同的总监理工程师",{"key":30,"text":695,"correct":22},"监理单位更换、调整项目监理机构监理人员，应做好交接工作，保持监理工作的连续性",{"key":34,"text":697,"correct":32},"监理单位调换专业监理工程师时，总监理工程师可以口头通知建设单位",{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":282,"analysis":37},93980,"下列工作中，属于总监理工程师职责的有( )",[702,704,706,708,710],{"key":20,"text":703,"correct":22},"确定项目监理机构人员和岗位职责",{"key":24,"text":705,"correct":22},"组织编制项目监理规划",{"key":27,"text":707,"correct":32},"负责编制专业监理实施细则",{"key":30,"text":709,"correct":32},"根据专业监理工作实施情况做好监理日志",{"key":34,"text":711,"correct":22},"审核签署承包单位的付款申请、支付证书和竣工结算",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":97,"analysis":37},93981,"监理规划是项目监理机构全面开展工程监理工作的指导性文件，主要内容有( )。",[716,718,720,722,724],{"key":20,"text":717,"correct":22},"确定项目监理机构的工作目标",{"key":24,"text":719,"correct":32},"制定隐蔽工程验收标准",{"key":27,"text":721,"correct":22},"制定监理人员岗位职责",{"key":30,"text":723,"correct":22},"进行工程质量、造价和进度控制",{"key":34,"text":725,"correct":22},"制定监理工作制度",[727,731,734,737,740,742],{"id":728,"name":729,"category":7,"favorite":730},109,"发布证券研究报告业务",1,{"id":732,"name":733,"category":7,"favorite":8},30,"经济师",{"id":735,"name":736,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":738,"name":739,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":741,"category":7,"favorite":8},"(初级)保险专业",{"id":743,"name":744,"category":7,"favorite":8},51,"(初级)财政税收"]