[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-45":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":720},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,45,50,2598,[13,38,53,68,82,97,111,125,140,154,168,183,197,212,225,240,255,269,283,297,312,326,341,355,369,384,398,412,426,440,454,469,483,497,511,525,539,553,566,580,589,602,614,626,640,654,665,680,694,707],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},93882,2,"多选题","BIM应用目标确定的过程包括（）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","BIM应用目标的确定",true,{"key":24,"text":25,"correct":22},"B","BIM应用范围的选择",{"key":27,"text":28,"correct":22},"C","BIM实施原则的制定",{"key":30,"text":31,"correct":32},"D","BIM实施过程的制定",false,{"key":34,"text":35,"correct":32},"E","BIM组织形式的确定．","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},93883,"目前BIM技术应用发展呈现出的趋势包括（）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"从聚集设计阶段应用向施工阶段深化应用延伸",{"key":24,"text":45,"correct":22},"从单业务应用向多业务集成应用转变",{"key":27,"text":47,"correct":22},"从单纯技术应用向与项目管理集成应用转化",{"key":30,"text":49,"correct":22},"从单机应用向基于网络的多方协同应用转变",{"key":34,"text":51,"correct":32},"从一般项目应用向标志性项目应用延伸","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},93884,"基于BIM的深化设计中，模型质量控制有( )环节。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"事前质量控制",{"key":24,"text":60,"correct":32},"事中质量控制",{"key":27,"text":62,"correct":32},"事后质量控制",{"key":30,"text":64,"correct":22},"质量验收",{"key":34,"text":66,"correct":32},"成果交付","AD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":52,"analysis":37},93885,"BIM技术未来的发展趋势有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"A.制造商启用3D产品目录",{"key":24,"text":75,"correct":22},"实现预制加工工业化与全球化",{"key":27,"text":77,"correct":22},"BIM模型自动检测是否符合规范和可施工性",{"key":30,"text":79,"correct":22},"多维（n项目管理模式",{"key":34,"text":81,"correct":32},"完全实现自动化",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},93886,"下列重要价值中，属于BIM技术应用价值的有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"有利于技术与管理创新",{"key":24,"text":89,"correct":22},"提高生产效率",{"key":27,"text":91,"correct":22},"有利于缩短项目工期",{"key":30,"text":93,"correct":32},"大大降低风险，无须考虑风险因素",{"key":34,"text":95,"correct":22},"提高建设设施的可持续性","ABCE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":52,"analysis":37},93887,"建筑信息模型（BIM）技术的特征有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"信息存储结构具有多元化特征",{"key":24,"text":104,"correct":22},"以参数化建模作为创建模型的主要技术",{"key":27,"text":106,"correct":22},"以联合数据库的分类模型作为模型系统的实现方法",{"key":30,"text":108,"correct":22},"以通用数据交换标准作为系统间信息交换的基础",{"key":34,"text":110,"correct":32},"依赖CAD应用软件",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":52,"analysis":37},93888,"以下属于基于BIM的施工方案模拟应用流程的有（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"建立建筑结构三维模型",{"key":24,"text":118,"correct":22},"模拟仿真施工过程",{"key":27,"text":120,"correct":22},"定义建筑构件先后顺序",{"key":30,"text":122,"correct":22},"最优方案判定",{"key":34,"text":124,"correct":32},"建立算量模型",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},93889,"以下系统属于智能建筑基本构成的有（ ）。",[129,131,133,135,137],{"key":20,"text":130,"correct":32},"城市管理系统",{"key":24,"text":132,"correct":22},"信息化应用系统",{"key":27,"text":134,"correct":22},"信息设施系统",{"key":30,"text":136,"correct":22},"建筑设备管理系统",{"key":34,"text":138,"correct":32},"项目管理系统","BCD",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":96,"analysis":37},93890,"从智慧城市定义可知，智慧城市的作用有（ ）。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"推动城市管理和服务智慧化",{"key":24,"text":147,"correct":22},"提升城市运行管理和公共服务水平",{"key":27,"text":149,"correct":22},"提高城市居民幸福感和满意度",{"key":30,"text":151,"correct":32},"不利于城市间信息共享",{"key":34,"text":153,"correct":22},"有利于实现可持续发展",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":96,"analysis":37},93891,"以下属于智慧城市评价指标设计原则的有（ ）。",[158,160,162,164,166],{"key":20,"text":159,"correct":22},"导引性",{"key":24,"text":161,"correct":22},"代表性",{"key":27,"text":163,"correct":22},"人本性",{"key":30,"text":165,"correct":32},"开放性",{"key":34,"text":167,"correct":22},"系统性",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":182,"analysis":37},93892,"基于建筑信息模型（BIM）技术的施工进度计划编制流程的主要步骤有（ ）。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"WBS施工任务分解",{"key":24,"text":175,"correct":22},"施工进度计划任务包",{"key":27,"text":177,"correct":32},"执行过程计价",{"key":30,"text":179,"correct":22},"数据接口集成",{"key":34,"text":181,"correct":22},"形成4D进度计划","ABDE",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":96,"analysis":37},93893,"风险可根据不同原则和标准进行分类，按风险发生的原因可将风险分为( )。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"自然风险",{"key":24,"text":190,"correct":22},"社会风险",{"key":27,"text":192,"correct":22},"政治风险",{"key":30,"text":194,"correct":32},"责任风险",{"key":34,"text":196,"correct":22},"经济风险",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":211,"analysis":37},93894,"按工程项目参与方对工程风险进行分类，可分为( )。",[201,203,205,207,209],{"key":20,"text":202,"correct":22},"业主或投资商风险",{"key":24,"text":204,"correct":22},"承包商风险",{"key":27,"text":206,"correct":32},"纯粹风险",{"key":30,"text":208,"correct":32},"投机风险",{"key":34,"text":210,"correct":22},"咨询单位风险","ABE",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":182,"analysis":37},93895,"业主或开发商在项目决策阶段经常会遇到的风险主要有( )。",[216,218,220,221,223],{"key":20,"text":217,"correct":22},"政策风险",{"key":24,"text":219,"correct":22},"市场风险",{"key":27,"text":194,"correct":32},{"key":30,"text":222,"correct":22},"社会文化风险",{"key":34,"text":224,"correct":22},"法律风险",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":239,"analysis":37},93896,"工程风险监控的主要任务包括( )。",[229,231,233,235,237],{"key":20,"text":230,"correct":32},"建立工程风险初始清单",{"key":24,"text":232,"correct":22},"分析风险应对措施产生的效果",{"key":27,"text":234,"correct":22},"分析风险因素的变化程度",{"key":30,"text":236,"correct":22},"跟踪已识别的风险",{"key":34,"text":238,"correct":22},"识别新的风险","BCDE",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":254,"analysis":37},93897,"下列建设工程实施过程发生的事件中，属于业主或开发商在项目实施阶段风险的有()。",[244,246,248,250,252],{"key":20,"text":245,"correct":32},"文化水平会影响居民对项目的需求层次",{"key":24,"text":247,"correct":22},"勘察设计工作不到位",{"key":27,"text":249,"correct":32},"投资决策组织机制不健全带来的内部决策机制风险",{"key":30,"text":251,"correct":22},"承包商缺乏合作诚意",{"key":34,"text":253,"correct":22},"材料或设备供应商履约不力","BDE",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":139,"analysis":37},93898,"下列咨询设计服务单位风险中，属于来自承包商风险的有( )。",[259,261,263,265,267],{"key":20,"text":260,"correct":32},"可行性研究缺乏严肃性",{"key":24,"text":262,"correct":22},"承包商低价中标，在施工过程中不断提出：索赔",{"key":27,"text":264,"correct":22},"承包商缺乏职业道德，偷工减料",{"key":30,"text":266,"correct":22},"承包商对工程极不负责，导致工程质量安全事故",{"key":34,"text":268,"correct":32},"工程咨询单位编制的投资估算不准",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":52,"analysis":37},93899,"工程项目风险应对计划的主要内容包括( )。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"描述已识别的工程风险基本信息",{"key":24,"text":276,"correct":22},"风险应对策略",{"key":27,"text":278,"correct":22},"明确风险承担主体及其责任",{"key":30,"text":280,"correct":22},"实施应对策略所需资源的分配",{"key":34,"text":282,"correct":32},"附加风险",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":239,"analysis":37},93900,"工程风险事件造成的损失通常包括( )。",[287,289,291,293,295],{"key":20,"text":288,"correct":32},"供应链短缺",{"key":24,"text":290,"correct":22},"费用超支",{"key":27,"text":292,"correct":22},"工期拖延",{"key":30,"text":294,"correct":22},"质量事故",{"key":34,"text":296,"correct":22},"安全事故",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":311,"analysis":37},93901,"工程风险评价常用的方法有( )。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"主观评分法 ?",{"key":24,"text":304,"correct":32},"头脑风暴法",{"key":27,"text":306,"correct":22},"蒙特卡洛法",{"key":30,"text":308,"correct":22},"等风险图法",{"key":34,"text":310,"correct":32},"主观概率法","ACD",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":182,"analysis":37},93902,"建设工程项目风险应对策略包括( )。",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"风险自留",{"key":24,"text":319,"correct":22},"风险预防",{"key":27,"text":321,"correct":32},"风险识别",{"key":30,"text":323,"correct":22},"风险转移",{"key":34,"text":325,"correct":22},"风险回避",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":340,"analysis":37},93903,"下列属于承包商在签约履约阶段承担的风险有()。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"合同条件不平等",{"key":24,"text":333,"correct":32},"竣工验收时发现的质量问题",{"key":27,"text":335,"correct":32},"选择投标代理人不当",{"key":30,"text":337,"correct":22},"工程施工管理能力不足",{"key":34,"text":339,"correct":22},"分包单位管理水平低下","ADE",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":211,"analysis":37},93904,"下列风险保障项目中，属于建筑工程一切险物质损失部分的有()。",[345,347,349,351,353],{"key":20,"text":346,"correct":22},"工人因缺乏经验对于保险标的所造成的损失",{"key":24,"text":348,"correct":22},"地震造成的工程损失",{"key":27,"text":350,"correct":32},"水污染",{"key":30,"text":352,"correct":32},"设计错误",{"key":34,"text":354,"correct":22},"现场清理费用",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":340,"analysis":37},93905,"确定建筑工程一切险费率应考虑的因素有( )。",[359,361,363,365,367],{"key":20,"text":360,"correct":22},"承保责任范围的大小",{"key":24,"text":362,"correct":32},"建设工程工期",{"key":27,"text":364,"correct":32},"工程项目的总预算",{"key":30,"text":366,"correct":22},"承保人及其他工程关系方的资信情况",{"key":34,"text":368,"correct":22},"同类工程以往损失记录",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":383,"analysis":37},93906,"下列时间点中，可以作为建筑工程保险责任开始时间的有( )。",[373,375,377,379,381],{"key":20,"text":374,"correct":32},"施工单位进入工地之日",{"key":24,"text":376,"correct":22},"动工之日",{"key":27,"text":378,"correct":22},"材料、设备运抵工地之日",{"key":30,"text":380,"correct":32},"施工招标完成之日",{"key":34,"text":382,"correct":32},"工地施工准备开始之日","BC",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":211,"analysis":37},93907,"与普通的财产保险相比，工程保险的显著特征有( )。",[388,390,392,394,396],{"key":20,"text":389,"correct":22},"工程保险既承担被保险人财产损失的风险，也承担被保险人的责任风险",{"key":24,"text":391,"correct":22},"工程保险针对承保风险的特殊性提供的保障具有综合性",{"key":27,"text":393,"correct":32},"工程保险的保险期限是相对固定的",{"key":30,"text":395,"correct":32},"工程保险的保险金额在保险期限内相对不变",{"key":34,"text":397,"correct":22},"工程保险的保险金额在保险期限内随工程建设的进度不断增长",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":96,"analysis":37},93908,"工程风险估计的内容包括( )。",[402,404,406,408,410],{"key":20,"text":403,"correct":22},"风险事件发生的可能性估计",{"key":24,"text":405,"correct":22},"风险事件产生的后果估计",{"key":27,"text":407,"correct":22},"风险事件影响范围估计",{"key":30,"text":409,"correct":32},"风险事件发生的起源地估计",{"key":34,"text":411,"correct":22},"风险事件发生的时间估计",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":425,"analysis":37},93909,"与传统的财产保险相比较，工程保险所具有的特征有( )。",[416,418,420,421,423],{"key":20,"text":417,"correct":22},"工程保险范围一般由物质损失部分和第三者部分构成",{"key":24,"text":419,"correct":22},"涉及较多的利害关系人",{"key":27,"text":393,"correct":32},{"key":30,"text":422,"correct":22},"工程保险承保被保险人财产损失的风险，也承保被保险人的责任风险",{"key":34,"text":424,"correct":32},"工程保险的保险金额在保险期限内是相对固定不变的","ABD",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":96,"analysis":37},93910,"工程保险的被保险人可以为( )。",[430,432,434,436,438],{"key":20,"text":431,"correct":22},"业主",{"key":24,"text":433,"correct":22},"总承包单位",{"key":27,"text":435,"correct":22},"分包单位",{"key":30,"text":437,"correct":32},"勘察设计单位",{"key":34,"text":439,"correct":22},"工程监理单位",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":139,"analysis":37},93911,"建筑工程一切险的保险期终止时间可以是( )。",[444,446,448,450,452],{"key":20,"text":445,"correct":32},"工程动工日",{"key":24,"text":447,"correct":22},"保险单规定的终止时间",{"key":27,"text":449,"correct":22},"建筑工程完毕移交给工程所有人时",{"key":30,"text":451,"correct":22},"工程所有人开始使用时",{"key":34,"text":453,"correct":32},"保修期满日",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":468,"analysis":37},93912,"某建筑公司投保了建筑职工意外伤害保险。该险种承保的范围包括( )。",[458,460,462,464,466],{"key":20,"text":459,"correct":32},"遭受自然灾害工程本身受损",{"key":24,"text":461,"correct":32},"意外事故使施工用设施受损",{"key":27,"text":463,"correct":22},"被保险人从事建筑施工时由于操作不当受伤害致残",{"key":30,"text":465,"correct":22},"被保险人在施工现场被高空坠物砸死",{"key":34,"text":467,"correct":32},"火灾和爆炸等意外事故造成的工程损失","CD",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":182,"analysis":37},93913,"下列因素中，属于建筑工程保险费率厘定依据的有（）。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"保险责任范围大小",{"key":24,"text":476,"correct":22},"工程本身的危险程度",{"key":27,"text":478,"correct":32},"建设工程投资额",{"key":30,"text":480,"correct":22},"承包人及其他工程关系方的资信、经营管理水平及经验等条件",{"key":34,"text":482,"correct":22},"工程免赔额的高低及第三者责任和特种风险的赔偿限额",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":52,"analysis":37},93914,"在安装工程保险中，整个工期实行一次性费率的项目有（）。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"安装工程",{"key":24,"text":490,"correct":22},"土木建筑工程项目",{"key":27,"text":492,"correct":22},"场地清理费",{"key":30,"text":494,"correct":22},"第三者人身伤亡及损失",{"key":34,"text":496,"correct":32},"为安装工程施工用的承包人的机器设备",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":340,"analysis":37},93915,"建设工程设计责任保险包括()。",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"年度责任险",{"key":24,"text":504,"correct":32},"第三者责任险",{"key":27,"text":506,"correct":32},"物质财产险",{"key":30,"text":508,"correct":22},"项目责任险",{"key":34,"text":510,"correct":22},"多项工程保险",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":425,"analysis":37},93916,"意外伤害险保险责任的必要构成条件有（）。",[515,517,519,521,523],{"key":20,"text":516,"correct":22},"被保险人在保险期限内遭受意外伤害",{"key":24,"text":518,"correct":22},"被保险人在责任期限内死亡或残疾",{"key":27,"text":520,"correct":32},"被保险人在保险期限内死亡或残疾",{"key":30,"text":522,"correct":22},"被保险人所受意外伤害是其死亡或残疾的直接原因或近因",{"key":34,"text":524,"correct":32},"被保险人所受意外伤害是其死亡或残疾的原因之一",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":182,"analysis":37},93917,"工程保险与传统的财产保险相比较，具备的特征有（）。",[529,531,533,535,537],{"key":20,"text":530,"correct":22},"风险具有特殊性",{"key":24,"text":532,"correct":22},"保障具有综合性",{"key":27,"text":534,"correct":32},"被保险人具有单一性",{"key":30,"text":536,"correct":22},"保险期限具有不确定性",{"key":34,"text":538,"correct":22},"保险金额具有变动性",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":340,"analysis":37},93918,"风险分析必不可少的主要步骤是（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":22},"采集数据",{"key":24,"text":546,"correct":32},"分析损失发生的概率分布",{"key":27,"text":548,"correct":32},"定性研究风险发生的可能性",{"key":30,"text":550,"correct":22},"对风险影响进行评价",{"key":34,"text":552,"correct":22},"完成不确定性模型",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":311,"analysis":37},93919,"符合建筑工程保险责任终止的条件包括（）。",[557,558,560,562,564],{"key":20,"text":451,"correct":22},{"key":24,"text":559,"correct":32},"工程保修期结束",{"key":27,"text":561,"correct":22},"工程完毕移交给所有人",{"key":30,"text":563,"correct":22},"保险单规定的终止日期",{"key":34,"text":565,"correct":32},"在施工中，经双方协商一致。书面认定的日期",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":182,"analysis":37},93920,"建筑工程保险的投保人或被保险人主要包括（）。",[570,572,574,576,578],{"key":20,"text":571,"correct":22},"工程所有人",{"key":24,"text":573,"correct":22},"工程承包人",{"key":27,"text":575,"correct":32},"建筑工人",{"key":30,"text":577,"correct":22},"技术顾问",{"key":34,"text":579,"correct":22},"贷款银行",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":383,"analysis":37},93921,"下列时间点中，可以作为建筑工程保险责任开始时间的有（）。",[584,585,586,587,588],{"key":20,"text":374,"correct":32},{"key":24,"text":376,"correct":22},{"key":27,"text":378,"correct":22},{"key":30,"text":380,"correct":32},{"key":34,"text":382,"correct":32},{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":601,"analysis":37},93922,"按风险的分布情况，可以分为（）。",[593,595,596,598,599],{"key":20,"text":594,"correct":22},"行业风险",{"key":24,"text":196,"correct":32},{"key":27,"text":597,"correct":32},"管理风险",{"key":30,"text":188,"correct":32},{"key":34,"text":600,"correct":22},"国别风险","AE",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":211,"analysis":37},93923,"下列风险保障项目中，属于建筑工程保险物质损失部分的有（）。",[606,608,610,611,612],{"key":20,"text":607,"correct":22},"工地内现成的建筑物",{"key":24,"text":609,"correct":22},"施工机具设备",{"key":27,"text":350,"correct":32},{"key":30,"text":352,"correct":32},{"key":34,"text":613,"correct":22},"场地清理费用",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":340,"analysis":37},93924,"风险分析是应用风险分析技术，采用定性、定量或两者相结合的方式处理不确定性的过程，其主要步骤有（）。",[618,619,621,623,624],{"key":20,"text":544,"correct":22},{"key":24,"text":620,"correct":32},"建立风险目录摘要",{"key":27,"text":622,"correct":32},"完成风险分类",{"key":30,"text":552,"correct":22},{"key":34,"text":625,"correct":22},"对风险影响进行评定",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":425,"analysis":37},93925,"下列建设工程实施过程发生的事件中，属于业主或投资者风险的有（）。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"资金筹措困难",{"key":24,"text":633,"correct":22},"投资回收期长",{"key":27,"text":635,"correct":32},"由于承包商技术错误造成的直接损失",{"key":30,"text":637,"correct":22},"工程所在国发生全国性罢工",{"key":34,"text":639,"correct":32},"承包商克扣工人工资，引起公愤导致群体行为",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":36,"analysis":37},93926,"下列风险防范的手段中，属于风险财务转移手段的有（）。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"购买保险",{"key":24,"text":647,"correct":22},"通过担保银行或保险公司开具保证书或保函",{"key":27,"text":649,"correct":22},"承包商担心原材料价格变化进行套期交易",{"key":30,"text":651,"correct":32},"承包商委托专业材料供货单位供货",{"key":34,"text":653,"correct":32},"承包商在不同国家采购设备，采用多种货币付款",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":36,"analysis":37},93927,"业主或投资商通常遇到的风险主要有（）。",[658,659,661,662,663],{"key":20,"text":196,"correct":22},{"key":24,"text":660,"correct":22},"人为风险",{"key":27,"text":188,"correct":22},{"key":30,"text":194,"correct":32},{"key":34,"text":664,"correct":32},"决策错误风险",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":679,"analysis":37},93928,"下列纯风险与投机风险的说法中，正确的有（）。",[669,671,673,675,677],{"key":20,"text":670,"correct":32},"投机风险只会造成损失而不会带来收益",{"key":24,"text":672,"correct":32},"纯风险可能造成损失，也可能创造额外收益",{"key":27,"text":674,"correct":22},"铤而走险的“险”，通常指投机风险",{"key":30,"text":676,"correct":22},"纯风险一般可重复出现，因而预测的准确性相对较高",{"key":34,"text":678,"correct":22},"纯风险与投机风险常常同时存在","CDE",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":679,"analysis":37},93929,"在某房地产开发项目风险中，属于承包商风险的有（）。",[684,686,688,690,692],{"key":20,"text":685,"correct":32},"房地产销售市场形势严峻",{"key":24,"text":687,"correct":32},"投资估算和设计概算不准",{"key":27,"text":689,"correct":22},"建材的上涨与价格调整",{"key":30,"text":691,"correct":22},"垫资承包",{"key":34,"text":693,"correct":22},"工程师的拖延和减扣",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":96,"analysis":37},93930,"风险应对措施主要有（）。",[698,700,702,703,705],{"key":20,"text":699,"correct":22},"风险规避",{"key":24,"text":701,"correct":22},"风险降低",{"key":27,"text":323,"correct":22},{"key":30,"text":704,"correct":32},"风险集中",{"key":34,"text":706,"correct":22},"分离风险",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":96,"analysis":37},93931,"下列风险中，属于咨询设计者自身的职业责任风险的有（）",[711,713,715,716,718],{"key":20,"text":712,"correct":22},"设计不充分、不完善",{"key":24,"text":714,"correct":22},"设计错误和疏忽",{"key":27,"text":687,"correct":22},{"key":30,"text":717,"correct":32},"服务范围与费用不相称",{"key":34,"text":719,"correct":22},"自身的能力和水平不适应",[721,725,728,731,734,736],{"id":722,"name":723,"category":7,"favorite":724},109,"发布证券研究报告业务",1,{"id":726,"name":727,"category":7,"favorite":8},30,"经济师",{"id":729,"name":730,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":732,"name":733,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":735,"category":7,"favorite":8},"(初级)保险专业",{"id":737,"name":738,"category":7,"favorite":8},51,"(初级)财政税收"]