[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":603},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,4,50,2598,[13,34,46,58,70,82,93,101,113,125,137,149,161,172,184,194,203,215,227,239,251,263,275,287,297,309,321,333,345,357,369,381,393,404,416,426,438,450,462,474,486,498,509,521,533,545,557,569,579,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},90899,1,"单选题","某进口设备采用运费在内价（CFR）形式，在该价格中包含的费用是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","出口国装运港至进口国目的港之间的运输保险费",false,{"key":24,"text":25,"correct":22},"B","进口国国内运费、装卸费",{"key":27,"text":28,"correct":22},"C","进口国国内运输保险费",{"key":30,"text":31,"correct":32},"D","出口国装运港至进口国目的港之间的海运费",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},90901,"按照《建设工程工程量清单计价规范》规定，项目编码分五级设置。第5、6位数字是指( )。",[38,40,42,44],{"key":20,"text":39,"correct":32},"分部工程顺序码",{"key":24,"text":41,"correct":22},"清单项目名称顺序码",{"key":27,"text":43,"correct":22},"专业工程顺序码",{"key":30,"text":45,"correct":22},"分项工程名称顺序码",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},90902,"根据《建设工程工程量清单计价规范》，下列关于分部分项工程量清单的说法，不正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"分部分项工程量清单的项目编码应采用12位阿拉伯数字表示",{"key":24,"text":53,"correct":22},"同一招标工程的项目编码不得有重复",{"key":27,"text":55,"correct":32},"分部分项工程量清单的项目名称可由编制者根据需要自行拟定",{"key":30,"text":57,"correct":22},"分部分项工程量清单中所列工程量中以平方米为单位应保留小数点两位",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},90903,"下列关于工程量清单的说法中，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"工程量清单是由投标人编制并发出的",{"key":24,"text":65,"correct":32},"工程量清单是招标文件的组成部分",{"key":27,"text":67,"correct":22},"工程量清单必须由招标人编制",{"key":30,"text":69,"correct":22},"工程量清单就是指分部分项工程量清单",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},90904,"工程单价计价时，全费用单价中不应涉及的内容是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"间接费",{"key":24,"text":77,"correct":22},"利润",{"key":27,"text":79,"correct":22},"风险因素",{"key":30,"text":81,"correct":32},"规费",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},90906,"关于工程量清单的说法，正确的是( )。",[86,88,90,91],{"key":20,"text":87,"correct":32},"采取工程量清单招标时，必须将工程量清单作为招标文件的组成部分",{"key":24,"text":89,"correct":22},"工程量清单必须由投标人编制",{"key":27,"text":67,"correct":22},{"key":30,"text":92,"correct":22},"工程量清单必须委托有资质的工程造价咨询人编制",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":30,"analysis":33},90907,"分部分项工程量清单的项目编码采用12位阿拉伯数字表示，其中第10—12位表示的为( )。",[97,98,99,100],{"key":20,"text":43,"correct":22},{"key":24,"text":39,"correct":22},{"key":27,"text":45,"correct":22},{"key":30,"text":41,"correct":32},{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":27,"analysis":33},90908,"工程量清单的用途是为（ ）使用。",[105,107,109,111],{"key":20,"text":106,"correct":22},"工程结算",{"key":24,"text":108,"correct":22},"招标人参考",{"key":27,"text":110,"correct":32},"投标人报价",{"key":30,"text":112,"correct":22},"编制施工方案",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":24,"analysis":33},90909,"分部分项工程量清单包括( )、项目名称、项目特征、计量单位和工程量。",[117,119,121,123],{"key":20,"text":118,"correct":22},"项目序号",{"key":24,"text":120,"correct":32},"项目编码",{"key":27,"text":122,"correct":22},"项目综合单价",{"key":30,"text":124,"correct":22},"项目单位",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":30,"analysis":33},90910,"按照《建设工程工程量清单计价规范》规定，措施项目费( )。",[129,131,133,135],{"key":20,"text":130,"correct":22},"应采用综合单价计价",{"key":24,"text":132,"correct":22},"应由招标人根据企业情况自行报价",{"key":27,"text":134,"correct":22},"应采用工料单价计价",{"key":30,"text":136,"correct":32},"应根据拟建工程的施工方案或施工组织设计，对其作出适当调整",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":30,"analysis":33},90912,"预算定额中人工工日消耗量应包括（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"基本用工",{"key":24,"text":144,"correct":22},"基本用工和其他用工两部分",{"key":27,"text":146,"correct":22},"基本用工、辅助用工和人工幅度差",{"key":30,"text":148,"correct":32},"基本用工、其他用工和人工幅度差",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":20,"analysis":33},90913,"《建设工程工程量清单计价规范》中，分部分项工程量清单中，同一招标工程的项目编码( )。",[153,155,157,159],{"key":20,"text":154,"correct":32},"不得有重复",{"key":24,"text":156,"correct":22},"可以有重复",{"key":27,"text":158,"correct":22},"可以有重复，但是需要做出说明",{"key":30,"text":160,"correct":22},"根据工程实际情况确定",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":30,"analysis":33},90914,"依照《建设工程工程量清单计价规范》规定，以下关于工程量清单的说法中正确的是（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":22},"工程量清单必须委托中介机构编制",{"key":24,"text":168,"correct":22},"措施项目清单列项内容主要包括预留金和零星工作项目费",{"key":27,"text":170,"correct":22},"其他项目清单列项内容主要包括利润和税金",{"key":30,"text":65,"correct":32},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":30,"analysis":33},90915,"下列费用中，应计入预算人工工资单价的是( )。",[176,178,180,182],{"key":20,"text":177,"correct":22},"工会经费",{"key":24,"text":179,"correct":22},"职工教育经费",{"key":27,"text":181,"correct":22},"养老保险费",{"key":30,"text":183,"correct":32},"职工福利费",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},90917,"关于工程量清单的说法，正确的是（ ）。",[188,190,192,193],{"key":20,"text":189,"correct":32},"采用清单工程量招标中，必须将工程量清单作为招标文件的组成部分",{"key":24,"text":191,"correct":22},"清单工程量必须由投标人编制",{"key":27,"text":67,"correct":22},{"key":30,"text":92,"correct":22},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},90918,"按照《建设工程工程量清单计价规范》规定，项目编码分五级设置。第一级编码为03，是指( )。",[198,199,201,202],{"key":20,"text":41,"correct":22},{"key":24,"text":200,"correct":32},"专业工程代码",{"key":27,"text":45,"correct":22},{"key":30,"text":39,"correct":22},{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":24,"analysis":33},90919,"某施工机械的耐用总台班数为1000台班，一次大修费用为15000元，大修周期数为7次。则台班大修理费为（ ）元。",[207,209,211,213],{"key":20,"text":208,"correct":22},"50",{"key":24,"text":210,"correct":32},"90",{"key":27,"text":212,"correct":22},"100",{"key":30,"text":214,"correct":22},"150",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":20,"analysis":33},90920,"下列情形中，只能采用概算指标法编制建筑单位工程概算的是( )。",[219,221,223,225],{"key":20,"text":220,"correct":32},"初步设计深度不够，不能准确计算工程量，但工程采用的技术比较成熟且有类似概算指标可以利用",{"key":24,"text":222,"correct":22},"初步设计有一定深度，能计算出扩大的分部分项工程量",{"key":27,"text":224,"correct":22},"有详细的施工图设计资料，能准确计算分部分项工程量",{"key":30,"text":226,"correct":22},"没有初步设计资料，无法计算出任何工程量",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":24,"analysis":33},90922,"关于施工图预算的说法，正确的是( )。",[231,233,235,237],{"key":20,"text":232,"correct":22},"采用单价法编制施工图预算时，需要套用相应的材料、人工和机械台班定额用量",{"key":24,"text":234,"correct":32},"采用实物法编制施工图预算时，不直接套用预算定额单价",{"key":27,"text":236,"correct":22},"单价法与实物法的根本区别在于计算工程量的方法不同",{"key":30,"text":238,"correct":22},"单价法与实物法的根本区别在于计算间接费和利税的方法不同",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":27,"analysis":33},90923,"在进行流动资金估算时，根据资金周转额和周转速度之间的关系，对构成流动资金的各项流动资产和流动负债分别进行估算的方法是( )。",[243,245,247,249],{"key":20,"text":244,"correct":22},"概算指标法",{"key":24,"text":246,"correct":22},"扩大指标法",{"key":27,"text":248,"correct":32},"分项详细估算法",{"key":30,"text":250,"correct":22},"投资估算指标法",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":27,"analysis":33},90924,"下列概算中，属于设备及安装单位工程概算的是( )。",[255,257,259,261],{"key":20,"text":256,"correct":22},"工业管道工程概算",{"key":24,"text":258,"correct":22},"电气照明工程概算",{"key":27,"text":260,"correct":32},"器具、工具及生产家具购置费概算",{"key":30,"text":262,"correct":22},"通风工程概算",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":27,"analysis":33},90925,"在固定资产投资估算编制方法中，根据已建成的类似项目的投资额、生产能力和拟建项目的生产能力，估算拟建项目投资额的方法是( )。",[267,269,271,273],{"key":20,"text":268,"correct":22},"资金周转率法",{"key":24,"text":270,"correct":22},"设备费用百分比估算法",{"key":27,"text":272,"correct":32},"生产能力指数法",{"key":30,"text":274,"correct":22},"造价指标估算法",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":27,"analysis":33},90927,"初步设计阶段编制工程概算，计算劳动、机械台班、材料需要量的依据是( )。",[279,281,283,285],{"key":20,"text":280,"correct":22},"扩大指标",{"key":24,"text":282,"correct":22},"估算指标",{"key":27,"text":284,"correct":32},"概算指标",{"key":30,"text":286,"correct":22},"产值指标",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":27,"analysis":33},90928,"编制建筑单位工程概算时，当初步设计深度不够、不能准确地计算工程量，但工程采用的技术比较成熟而又有类似概算指标可以利用时，可采用 ( ) 来编制概算。",[291,293,294,295],{"key":20,"text":292,"correct":22},"实物法",{"key":24,"text":250,"correct":22},{"key":27,"text":284,"correct":32},{"key":30,"text":296,"correct":22},"类似工程预决算法",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},90929,"用资金周转率法估算某项目建设投资.已知该项目资金周转率的近似值为1.5，项目生产期产品的年产量为450万吨，产品价格为100元／吨，该项目总投资估计应为( )万。",[301,303,305,307],{"key":20,"text":302,"correct":22},"3000",{"key":24,"text":304,"correct":32},"30000",{"key":27,"text":306,"correct":22},"45000",{"key":30,"text":308,"correct":22},"67500",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},90930,"编制某单位工程施工图预算时，先根据地区统一单位估价表中的各分项定价，乘以相应的工程量并相加，得到单位工程的人工费、材料费和机械使用费者之和，再加上措施费、间接费、利润和税金，汇总求和。这种编制预算的方法是（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":32},"工料单价法",{"key":24,"text":316,"correct":22},"综合单价法",{"key":27,"text":318,"correct":22},"全费用单价法",{"key":30,"text":320,"correct":22},"实物单价法",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},90932,"某建设项目采用资金周转率法估算建设投资，估算结果为5000万元。已知该项目产品的年产量为60万吨，每吨产品价格为100元，则该项目的资金周转率为( )。",[325,327,329,331],{"key":20,"text":326,"correct":22},"0.83",{"key":24,"text":328,"correct":32},"1.2",{"key":27,"text":330,"correct":22},"1.5",{"key":30,"text":332,"correct":22},"1.8",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":30,"analysis":33},90933,"采用工料单价法编制施工图预算时，单位工程直接工程费等于( )计算。",[337,339,341,343],{"key":20,"text":338,"correct":22},"各分项工程的工程量与工料单价的乘积",{"key":24,"text":340,"correct":22},"各分项工程的工程量与综合单价的乘积",{"key":27,"text":342,"correct":22},"各分项工程的工程量与综合单价的乘积之和",{"key":30,"text":344,"correct":32},"各分项工程的工程量与工料单价的乘积之和",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},90934,"某企业拟建工业项目年生产能力为2000万吨。与其同类的某已建项目年生产能力为1000万吨，设备投资额为5000万元，经测算，设备投资的综合调整系数为1．2，已知生产能力指数n=0．5，用生产能力指数法估算该拟建项目的设备投资额为（ ）万元。",[349,351,353,355],{"key":20,"text":350,"correct":22},"6600",{"key":24,"text":352,"correct":32},"8485．28",{"key":27,"text":354,"correct":22},"13641．44",{"key":30,"text":356,"correct":22},"15514．6",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":27,"analysis":33},90935,"在施工图设计阶段，根据施工图纸确定的工程量，套用有关预算定额单价、取费率和利税率等编制( )。",[361,363,365,367],{"key":20,"text":362,"correct":22},"建设项目总概算",{"key":24,"text":364,"correct":22},"投资估算",{"key":27,"text":366,"correct":32},"施工图预算",{"key":30,"text":368,"correct":22},"建筑安装工程造价",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},90937,"关于项目总投资中流动资金的说法，正确的是( )。",[373,375,377,379],{"key":20,"text":374,"correct":22},"总投资中的流动资金是指项目投产后形成的流动资产",{"key":24,"text":376,"correct":32},"流动资金估算的基本公式为：流动资金=流动资产一流动负债",{"key":27,"text":378,"correct":22},"流动资金估算一般应采用扩大指标法",{"key":30,"text":380,"correct":22},"在项目计算期末应收回部分流动资金",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":27,"analysis":33},90938,"某项目采用生产能力指数法估算拟建装置的投资。已建成类似装置的投资额为200万元，生产能力为30万吨；拟建装置的生产能力为45万吨。指数n的取值为1，综合调整系数为1,20该拟建装置的投资估算额是( )万元",[385,387,389,391],{"key":20,"text":386,"correct":22},"250",{"key":24,"text":388,"correct":22},"300",{"key":27,"text":390,"correct":32},"360",{"key":30,"text":392,"correct":22},"400",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":30,"analysis":33},90939,"在下述各项中，列入建筑单位工程概算的是( )。",[397,399,401,403],{"key":20,"text":398,"correct":22},"机械设备概算",{"key":24,"text":400,"correct":22},"生产家具购置费概算",{"key":27,"text":402,"correct":22},"电气设备概算",{"key":30,"text":262,"correct":32},{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":30,"analysis":33},90941,"在工程量清单计价模式下，关于确定分部分项工程项目综合单价的说法，正确的是( )。",[408,410,412,414],{"key":20,"text":409,"correct":22},"若分部分项工程量清单项目特征的描述与设计图纸不符，投标人应按设计图纸确定综合单价",{"key":24,"text":411,"correct":22},"综合单价中不需考虑招标文件中要求投标人承担的风险费用",{"key":27,"text":413,"correct":22},"综合单价中应考虑招标人和投标人承担的所有风险费用",{"key":30,"text":415,"correct":32},"招标文件中提供了暂估单价的材料，应按暂估单价计入综合单价",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},90942,"根据《建设工程工程量清单计价规范》，分部分项工程量清单的综合单价不应包括( )。",[420,422,423,425],{"key":20,"text":421,"correct":22},"企业管理费",{"key":24,"text":81,"correct":32},{"key":27,"text":424,"correct":22},"风险费用",{"key":30,"text":77,"correct":22},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":30,"analysis":33},90943,"在工程量清单计价模式下，关于投标人编制其他项目费报价的说法，正确的是( )。",[430,432,434,436],{"key":20,"text":431,"correct":22},"暂列金额应由投标人根据实际情况自主确定",{"key":24,"text":433,"correct":22},"材料暂估价应由投标人根据实际情况自主确定",{"key":27,"text":435,"correct":22},"专业工程暂估价应由投标人根据施工组织设计或施工方案自主确定",{"key":30,"text":437,"correct":32},"总承包服务费应由投标人根据招标文件中列出的内容和提出的要求自主确定",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},90944,"下列关于成本加酬金合同的说法中，正确的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"适用于工期较短的项目",{"key":24,"text":445,"correct":32},"适用于工程内容及其技术经济指标尚未全面确定的情况",{"key":27,"text":447,"correct":22},"适用于工程内容明确的情况",{"key":30,"text":449,"correct":22},"酬金金额必须事前固定，不得调整",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},90946,"下列建筑工程成本合同形式中，发包方承担了通货膨胀风险，而承包方承担了实物工程量、成本等风险的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"不可调值总价合同",{"key":24,"text":457,"correct":22},"单价合同",{"key":27,"text":459,"correct":32},"可调值总价合同",{"key":30,"text":461,"correct":22},"成本加酬金合同",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":33},90947,"根据《建设工程工程量清单计价规范》，关于建设工程工程量计价的说法，正确的是（ ）",[466,468,470,472],{"key":20,"text":467,"correct":32},"全部使用国有资金投资或国有资金投资为主的建设工程施工发承包，必须采用工程量清单计价",{"key":24,"text":469,"correct":22},"非国有资金投资的工程建设项目，不应采用工程量清单方式计价",{"key":27,"text":471,"correct":22},"分部分项工程量清单可采用综合单价或者总价方式计价",{"key":30,"text":473,"correct":22},"实行工程量清单招标时，工程量清单及报价均应由投标人编制",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},90949,"关于建设工程承包合同价格的说法，正确的是( )。",[478,480,482,484],{"key":20,"text":479,"correct":22},"采用可调值总价合同时，承包方需承担通货膨胀风险",{"key":24,"text":481,"correct":32},"采用估计工程量单价合同时，承包方按照发包方提出的工程量清单填报单价，工程结算总价按照实际完成的工程量计算",{"key":27,"text":483,"correct":22},"采用单价合同时，合同单价不允许调整",{"key":30,"text":485,"correct":22},"采用不可调值总价合同时，招标方承担的风险较大",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},90950,"投标人在其他项目清单报价时，须按照招标人在其他项目清单中列出的金额填写的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":32},"暂列金额",{"key":24,"text":493,"correct":22},"总承包服务费",{"key":27,"text":495,"correct":22},"计日工费用",{"key":30,"text":497,"correct":22},"材料暂估价",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},90951,"某工程合同价的确定方式为：发包方不需对工程量做出任何规定，承包方在投标时只需按发包方给出的分部分项工程项目及工程范围做出报价，而工程量则按实际完成的数量结算。这种合同属于( )。",[502,504,506,508],{"key":20,"text":503,"correct":32},"纯单价合同",{"key":24,"text":505,"correct":22},"可调工程量单价合同",{"key":27,"text":507,"correct":22},"不可调值单价合同",{"key":30,"text":459,"correct":22},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":20,"analysis":33},90952,"下列关于工程承包合同的说法中，正确的是( )。",[513,515,517,519],{"key":20,"text":514,"correct":32},"不可调值总价合同适用于工期较短的项目",{"key":24,"text":516,"correct":22},"当采用成本加酬金合同时，承包商承担的风险较大",{"key":27,"text":518,"correct":22},"当采用估算工程量单价合同时，合同单价在任何情况下都不能调整",{"key":30,"text":520,"correct":22},"当采用估算工程量单价合同时，必须按照事先确定的工程量进行结算",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},90954,"在采用成本加酬金合同价时，为了有效地控制工程投资，最好采用（ ）确定的合同价。",[525,527,529,531],{"key":20,"text":526,"correct":32},"最高限额成本加固定最大酬金",{"key":24,"text":528,"correct":22},"成本加固定百分比酬金",{"key":27,"text":530,"correct":22},"成本加固定金额",{"key":30,"text":532,"correct":22},"成本加奖罚",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},90955,"在工程量清单计价模式下编制投标报价时，措施项目费的报价原则是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"措施项目清单必须按照招标人所列措施项目填写",{"key":24,"text":540,"correct":32},"投标人可根据投标时拟定的施工组织设计或施工方案自主确定措施项目费",{"key":27,"text":542,"correct":22},"投标人必须按照招标人在措施项目清单中列出的单价确定措施项目费",{"key":30,"text":544,"correct":22},"投标人必须按照招标人在措施项目清单中列出的工程数量确定措施项目费",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},90956,"根据《建设工程工程量清单计价规范》(GB50500--2008)，下列关于招标控制价的说法中，正确的是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":32},"招标控制价是对招标工程限定的最高工程造价",{"key":24,"text":552,"correct":22},"招标控制价应在招标时公布，可以上调或下浮",{"key":27,"text":554,"correct":22},"在开标前，招标控制价必须保密",{"key":30,"text":556,"correct":22},"投标人的投标报价可高于招标控制价，但不应超过规定的比例",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},90958,"采用不可调值总价合同时，由发包方承担的是( )风险。",[561,563,565,567],{"key":20,"text":562,"correct":32},"设计和工程范围变更",{"key":24,"text":564,"correct":22},"地质条件不利",{"key":27,"text":566,"correct":22},"通货膨胀",{"key":30,"text":568,"correct":22},"施工质量不良",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},90959,"以一次包死的总价委托，价格不因环境的变化和工程量增减而变化，承包商承担了全部的工程量和价格变动风险的合同被称为（ ）。",[573,574,576,578],{"key":20,"text":457,"correct":22},{"key":24,"text":575,"correct":32},"固定总价合同",{"key":27,"text":577,"correct":22},"目标合同",{"key":30,"text":461,"correct":22},{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":20,"analysis":33},90960,"下列关于预付工程款的说法中，正确的是（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":32},"已支付的预付款应以抵充工程价款的方式陆续扣回",{"key":24,"text":586,"correct":22},"业主应在正式开工后按月支付给承包商",{"key":27,"text":588,"correct":22},"预付工程款主要用作质量保修金",{"key":30,"text":590,"correct":22},"应按工程总造价的3%～5%分月扣回",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":30,"analysis":33},90961,"关于合同价款期中结算时工程计量的说法，正确的是( )",[595,597,599,601],{"key":20,"text":596,"correct":22},"对因承包人原因造成返工的工程量，发包人应适当予以计量",{"key":24,"text":598,"correct":22},"对承包人超出合同工程范围完成的工程量，发包人应适当予以计量",{"key":27,"text":600,"correct":22},"发包人需独立对工程进行计量，并完成已完工程量报告",{"key":30,"text":602,"correct":32},"承包人应当按照合同约定的方法和时间，向发包人提交已完工程量的报告",[604,607,610,613,616,618],{"id":605,"name":606,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":608,"name":609,"category":7,"favorite":8},30,"经济师",{"id":611,"name":612,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":614,"name":615,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":617,"category":7,"favorite":8},"(初级)保险专业",{"id":619,"name":620,"category":7,"favorite":8},51,"(初级)财政税收"]