[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,35,50,2598,[13,34,46,58,70,82,94,106,118,130,141,153,165,177,189,201,213,223,235,243,255,267,279,289,301,313,325,337,349,361,373,385,397,409,421,432,442,454,466,478,490,502,514,526,537,549,561,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},93376,1,"单选题","为防止增加房地产市场需求泡沫，造成需求旺盛的假象，应对房地产( )加以适度控制。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","生产性需求",false,{"key":24,"text":25,"correct":22},"B","消费性需求",{"key":27,"text":28,"correct":22},"C","就业性需求",{"key":30,"text":31,"correct":32},"D","投资性需求",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},93377,"直接影响房地产供给量的首要因素是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"房地产市场价格",{"key":24,"text":41,"correct":32},"土地供应量",{"key":27,"text":43,"correct":22},"房地产开发成本",{"key":30,"text":45,"correct":22},"政府政策",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},93378,"建筑产品的多样性决定了建筑市场定价特点中的( )。",[50,52,54,56],{"key":20,"text":51,"correct":32},"单价计价",{"key":24,"text":53,"correct":22},"多次计价",{"key":27,"text":55,"correct":22},"一次计价",{"key":30,"text":57,"correct":22},"分部组合计价",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},93379,"在房地产市场中，不属于房地产市场主体的是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"房地产供给者",{"key":24,"text":65,"correct":22},"房地产需求者",{"key":27,"text":67,"correct":32},"房屋所有权",{"key":30,"text":69,"correct":22},"房地产中介",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},93380,"房地产需求与国民经济发展水平呈一种( )关系。",[74,76,78,80],{"key":20,"text":75,"correct":32},"正相关",{"key":24,"text":77,"correct":22},"负相关",{"key":27,"text":79,"correct":22},"不完全相关",{"key":30,"text":81,"correct":22},"零相关",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},93381,"实际利率提高，对房地产市场投资性需求的影响是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"会提高房地产市场投资性需求水平",{"key":24,"text":89,"correct":32},"会降低房地产市场投资性需求水平",{"key":27,"text":91,"correct":22},"对房地产市场投资性需求的影响微不足道",{"key":30,"text":93,"correct":22},"对房地产市场投资性需求的影响是复杂的",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},93382,"下列不属于工程建设领域诚信体系建设内容的是（ ）",[98,100,102,104],{"key":20,"text":99,"correct":32},"推进个人信用记录建设",{"key":24,"text":101,"correct":22},"建筑市场各方主体和从业人员信用标准制定",{"key":27,"text":103,"correct":22},"开展工程质量诚信建设",{"key":30,"text":105,"correct":22},"信息公开",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},93383,"下列不属于加强个人诚信教育的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"大力弘扬信用文化",{"key":24,"text":113,"correct":22},"积极推介诚信典型",{"key":27,"text":115,"correct":22},"广泛开展信用教育培训",{"key":30,"text":117,"correct":32},"社会性约束和惩戒机制",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},93384,"建筑市场需求者是业主，在工程建设实践中常称为建设单位，下列选项中不属于常见业主类型的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"政府",{"key":24,"text":125,"correct":22},"企事业单位",{"key":27,"text":127,"correct":32},"社会团体",{"key":30,"text":129,"correct":22},"个人",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},93385,"在个人诚信建设中，推动完善个人实名登记制度属于个人诚信建设主要内容中的（ ）。",[134,136,137,139],{"key":20,"text":135,"correct":22},"加强个人诚信教育",{"key":24,"text":99,"correct":32},{"key":27,"text":138,"correct":22},"规范推进个人信用信息共享使用",{"key":30,"text":140,"correct":22},"完善个人守信激励和失信惩戒机制",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},93386,"对于不使用政府资金投资建设的项目，关系国家安全、涉及生产力重大布局、战略性资源开发和重大公共利益的，实行( )。",[145,147,149,151],{"key":20,"text":146,"correct":22},"备案制",{"key":24,"text":148,"correct":32},"核准制",{"key":27,"text":150,"correct":22},"审批制",{"key":30,"text":152,"correct":22},"指导制",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":30,"analysis":33},93387,"《建筑法》规定，按照国务院规定的权限和程序批准开工报告的建筑工程，( )。",[157,159,161,163],{"key":20,"text":158,"correct":22},"需领取施工许可证",{"key":24,"text":160,"correct":22},"需办理规划许可证",{"key":27,"text":162,"correct":22},"需办理用地批准手续",{"key":30,"text":164,"correct":32},"不再领取施工许可证",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":30,"analysis":33},93388,"全面考核工程建设成果、检验设计和施工质量的关键步骤是()。",[169,171,173,175],{"key":20,"text":170,"correct":22},"投资决策",{"key":24,"text":172,"correct":22},"可行性研究",{"key":27,"text":174,"correct":22},"建设实施",{"key":30,"text":176,"correct":32},"竣工验收",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},93389,"对于采用投资补助、贷款贴息等方式的政府投资项目，政府投资主管部门从投资决策角度只审批( )。",[181,183,185,187],{"key":20,"text":182,"correct":22},"可行性研究报告",{"key":24,"text":184,"correct":22},"项目建议书",{"key":27,"text":186,"correct":32},"资金申请报告",{"key":30,"text":188,"correct":22},"开工报告",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},93390,"不属于工程竣工验收的主要任务的是( )。",[193,195,197,199],{"key":20,"text":194,"correct":22},"审查工程建设的各个环节",{"key":24,"text":196,"correct":22},"审阅工程档案",{"key":27,"text":198,"correct":32},"不需实地查验建筑安装工程实体",{"key":30,"text":200,"correct":22},"对工程设计、施工和设备质量等进行全面评价",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":30,"analysis":33},93391,"根据国家有关规定，施工图审查机构对施工图审查的内容不包括( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"是否符合工程建设强制性标准",{"key":24,"text":208,"correct":22},"地基基础和主体结构的安全性",{"key":27,"text":210,"correct":22},"是否符合民用建筑节能强制性标准",{"key":30,"text":212,"correct":32},"勘察设计企业和注册执业人员的资质",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},93392,"拟建项目单位向政府投资主管部门提出的要求建设某一工程项目的建议文件，是()。",[217,219,220,221],{"key":20,"text":218,"correct":22},"投资估算书",{"key":24,"text":184,"correct":32},{"key":27,"text":182,"correct":22},{"key":30,"text":222,"correct":22},"项目申请报告",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":24,"analysis":33},93393,"在项目审批制度上，政府仅对重大项目和限制类项目从维护社会公共利益角度进行()。",[227,229,231,233],{"key":20,"text":228,"correct":22},"备案",{"key":24,"text":230,"correct":32},"核准",{"key":27,"text":232,"correct":22},"审批",{"key":30,"text":234,"correct":22},"规范",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":27,"analysis":33},93394,"企业不使用政府投资建设的项目中，政府仅对重大项目和限制类项目从维护社会公共利益角度进行核准，其他项目无论规模大小，均改为()。",[239,240,241,242],{"key":20,"text":150,"correct":22},{"key":24,"text":148,"correct":22},{"key":27,"text":146,"correct":32},{"key":30,"text":152,"correct":22},{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":24,"analysis":33},93395,"根据《房屋建筑和市政基础设施工程施工图设计文件审查管理办法》（住房和城乡建设部令第13号）,（ ）应当将施工图送施工图审查机构审查。",[247,249,251,253],{"key":20,"text":248,"correct":22},"施工单位",{"key":24,"text":250,"correct":32},"建设单位",{"key":27,"text":252,"correct":22},"设计单位",{"key":30,"text":254,"correct":22},"咨询单位",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":33},93396,"根据《国务院关于投资体制改革的决定》，对于企业不使用政府资金投资建设的项目，区别不同情况实行（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":22},"专家评议制或政府审批制",{"key":24,"text":262,"correct":32},"核准制或登记备案制",{"key":27,"text":264,"correct":22},"政府审批制或核准制",{"key":30,"text":266,"correct":22},"政府审批制或登记备案制",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":27,"analysis":33},93397,"对于政府投资项目,初步设计投资概算超过经批准的可行性研究报告中投资估算（）的,项目单位应当向投资主管部门或者其他有关部门报告。",[271,273,275,277],{"key":20,"text":272,"correct":22},"5%",{"key":24,"text":274,"correct":22},"8%",{"key":27,"text":276,"correct":32},"10%",{"key":30,"text":278,"correct":22},"12%",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":20,"analysis":33},93398,"根据《国务院关于投资体制改革的决定》，对于采用直接投资和资本金注入方式的政府投资项目，政府需要严格审批其（ ）。",[283,285,286,287],{"key":20,"text":284,"correct":32},"初步设计和概算",{"key":24,"text":188,"correct":22},{"key":27,"text":186,"correct":22},{"key":30,"text":288,"correct":22},"项目核准报告",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},93399,"下列关于建设用地预审与选址的说法，错误的是( )。",[293,295,297,299],{"key":20,"text":294,"correct":32},"使用已经依法批准的建设用地进行建设的项目，仍需办理用地预审",{"key":24,"text":296,"correct":22},"需要办理规划选址的，由地方自然资源主管部门对规划选址情况进行审查",{"key":27,"text":298,"correct":22},"需要办理规划选址的，由相关部门审查核发建设项目用地预审与选址意见书",{"key":30,"text":300,"correct":22},"建设项目用地预审与选址意见书有效期为3年，自批准之日起计算",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":24,"analysis":33},93400,"项目规划建设用地范围内总建筑面积与规划建设用地面积的比例是( )。",[305,307,309,311],{"key":20,"text":306,"correct":22},"建筑密度",{"key":24,"text":308,"correct":32},"容积率",{"key":27,"text":310,"correct":22},"绿地率",{"key":30,"text":312,"correct":22},"装配率",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":20,"analysis":33},93401,"房地产开发项目的成败在很大程度上取决于( )的科学与否。",[317,319,321,323],{"key":20,"text":318,"correct":32},"投资决策分析",{"key":24,"text":320,"correct":22},"前期准备",{"key":27,"text":322,"correct":22},"开发建设",{"key":30,"text":324,"correct":22},"销售策划",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":27,"analysis":33},93402,"县级以上人民政府依法批准，在土地使用者缴纳补偿、安置等费用后将该幅土地交付其使用的行为是( )。",[329,331,333,335],{"key":20,"text":330,"correct":22},"国有土地使用权出让",{"key":24,"text":332,"correct":22},"集体土地使用权出让",{"key":27,"text":334,"correct":32},"土地使用权划拨",{"key":30,"text":336,"correct":22},"土地使用权转让",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":27,"analysis":33},93403,"建设项目用地预审与选址意见书有效期为( )年，自批准之日起计算。",[341,343,345,347],{"key":20,"text":342,"correct":22},"1",{"key":24,"text":344,"correct":22},"2",{"key":27,"text":346,"correct":32},"3",{"key":30,"text":348,"correct":22},"4",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":27,"analysis":33},93404,"申请《商品房预售许可证》时，要求按提供预售的房屋计算，投入开发建设的资金达到工程建设总投资的()以上，并已经确定施工进度和竣工交付日期。",[353,355,357,359],{"key":20,"text":354,"correct":22},"15％",{"key":24,"text":356,"correct":22},"20％’",{"key":27,"text":358,"correct":32},"25％",{"key":30,"text":360,"correct":22},"30％",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},93405,"工程项目的( )是真实记录各种地下、地上建筑等详细情况的技术文件，是对工程进行交工验收、维护、扩建、改建的依据。",[365,367,369,371],{"key":20,"text":366,"correct":22},"施工图设计文件",{"key":24,"text":368,"correct":32},"竣工图",{"key":27,"text":370,"correct":22},"施工记录",{"key":30,"text":372,"correct":22},"监理日志",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":30,"analysis":33},93406,"下列关于商品房初始登记，表述不正确的是（ ）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"未办理不动产首次登记的，不得办理不动产其他类型登记",{"key":24,"text":380,"correct":22},"房地产调查或者测绘报属于申请国有建设用地使用权及房屋所有权首次登记的相关材料",{"key":27,"text":382,"correct":22},"办理房屋所有权首次登记时，申请人应当将建筑区划内依法属于业主共有的道路、绿地、其他公共场所、公用设施和物业服务用房及其占用范围内的建设用地使用权一并申请登记为业主共有",{"key":30,"text":384,"correct":32},"业主转让房屋所有权的,其对共有部分不能一并转让",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},93407,"下列关于房地产开发企业在项目施工阶段中进行的施工管理的内容表述错误的是（ ）。",[389,391,393,395],{"key":20,"text":390,"correct":22},"所有隐蔽工程验收记录必须经项目监理机构等有关验收单位签字认可后，方可组织下道工序施工",{"key":24,"text":392,"correct":22},"施工阶段投资控制的关键是对工程变更、签证实行有效控制",{"key":27,"text":394,"correct":32},"监理单位要对施工索赔做到事前把关、主动监控，严格审核工程变更，计算各项变更对总投资的影响",{"key":30,"text":396,"correct":22},"建设单位管理人员对施工进度的检查与进度计划的贯彻实施是融汇在一起的",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},93408,"房地产开发机会是宏观与微观相结合的思路，下列关于房地产开发机会选择说法中，不正确的是（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":32},"房地产开发投资机会选择的思路一般是从微观逐步聚焦到宏观",{"key":24,"text":404,"correct":22},"从宏观角度选定投资区域",{"key":27,"text":406,"correct":22},"从中观角度确定投资地区及具体城市",{"key":30,"text":408,"correct":22},"从微观层面选择投资开发的房地产类型和区位,并搜集可供开发的房地产项目和可利用的资源",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":27,"analysis":33},93409,"关于联合审图和联合验收的说法，错误的是( )。",[413,415,417,419],{"key":20,"text":414,"correct":22},"将消防、人防、技防等技术审查并人施工图设计文件审查",{"key":24,"text":416,"correct":22},"实行规划、土地、消防、人防、档案等事项限时联合验收",{"key":27,"text":418,"correct":32},"将竣工验收图纸和验收标准的要求分别制定，严格执行",{"key":30,"text":420,"correct":22},"对于验收涉及的测绘工作，实行“一次委托、联合测绘、成果共享”",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":27,"analysis":33},93410,"建设单位在办理工程质量监督注册手续时，需提供( )。",[425,427,429,431],{"key":20,"text":426,"correct":22},"投标文件",{"key":24,"text":428,"correct":22},"专项施工方案",{"key":27,"text":430,"correct":32},"施工组织设计",{"key":30,"text":366,"correct":22},{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},93411,"需审批建设用地的建设项目应在( )阶段，由建设用地单位提出申请。",[436,438,439,441],{"key":20,"text":437,"correct":22},"项目申请书",{"key":24,"text":172,"correct":32},{"key":27,"text":440,"correct":22},"初步设计",{"key":30,"text":322,"correct":22},{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":30,"analysis":33},93412,"建设单位应当自工程竣工验收合格之日起（）内，向工程所在地的县级以上地方人民政府建设行政主管部门备案。",[446,448,450,452],{"key":20,"text":447,"correct":22},"1个工作日",{"key":24,"text":449,"correct":22},"5个工作日",{"key":27,"text":451,"correct":22},"10个工作日",{"key":30,"text":453,"correct":32},"15个工作日",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":20,"analysis":33},93413,"已动工开发建设、但已投资额占总投资额不足()且未经批准中止开发建设连续满一年的土地，可以认定为闲置土地。",[458,460,462,464],{"key":20,"text":459,"correct":32},"25%",{"key":24,"text":461,"correct":22},"30%",{"key":27,"text":463,"correct":22},"33%",{"key":30,"text":465,"correct":22},"50%",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":30,"analysis":33},93414,"下列合同中，工程量增减风险由承包人承担的是()。",[470,472,474,476],{"key":20,"text":471,"correct":22},"成本加固定额酬金合同",{"key":24,"text":473,"correct":22},"成本加比例酬金合同",{"key":27,"text":475,"correct":22},"单价合同",{"key":30,"text":477,"correct":32},"总价合同",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},93415,"在工程招标中，招标人向投标人发出的中标通知书是（）。",[482,484,486,488],{"key":20,"text":483,"correct":32},"承诺",{"key":24,"text":485,"correct":22},"议价",{"key":27,"text":487,"correct":22},"要约",{"key":30,"text":489,"correct":22},"邀约",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},93416,"关于国有建设用地使用权租赁的说法，错误的是()。",[494,496,498,500],{"key":20,"text":495,"correct":22},"出租人有依法收回出租的国有建设用地使用权的权利",{"key":24,"text":497,"correct":32},"对于已出租的建设用地使用权，出租人不承担对租赁标的物进行维护的义务",{"key":27,"text":499,"correct":22},"承租人违反租赁合同，导致租赁标的物受损的，应承担损害赔偿的义务",{"key":30,"text":501,"correct":22},"按照租赁合同的规定，承租人有合法使用出租的土地及地上建筑物.其他附着物的权利",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},93417,"下列建设用地使用权处置方式中，不属于建设用地使用权转让的是（）。",[506,508,510,512],{"key":20,"text":507,"correct":32},"抵押",{"key":24,"text":509,"correct":22},"出售",{"key":27,"text":511,"correct":22},"互换",{"key":30,"text":513,"correct":22},"赠与",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},93418,"关于国有建设用地租赁范围的说法，正确的是()。",[518,520,522,524],{"key":20,"text":519,"correct":22},"对土地用途改变后不再符合划拨用地目录的，不可实行租赁",{"key":24,"text":521,"correct":32},"对使用者申请建设用地进行经营性房地产开发的，必须实行出让，不实行租赁",{"key":27,"text":523,"correct":22},"对使用者申请建设用地进行非经营性开发.依法应当有偿使用的，只能采用租赁",{"key":30,"text":525,"correct":22},"国有企业破产或出售时所涉及的划拔建设用地使用权，既可采取出让方式处置，也可实行租赁",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":27,"analysis":33},93419,"房地产开发项目办理建设用地规划许可证应提交的设计文件是()。",[530,532,534,535],{"key":20,"text":531,"correct":22},"概念设计",{"key":24,"text":533,"correct":22},"方案设计",{"key":27,"text":440,"correct":32},{"key":30,"text":536,"correct":22},"施工图设计",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":27,"analysis":33},93420,"发生合同纠纷，需要仲裁解决，前提是双方必须有（）",[541,543,545,547],{"key":20,"text":542,"correct":22},"合同",{"key":24,"text":544,"correct":22},"协议",{"key":27,"text":546,"correct":32},"仲裁协议",{"key":30,"text":548,"correct":22},"法院判决",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},93421,"下列关于建设用地使用权互换的说法中，正确的是()。",[553,555,557,559],{"key":20,"text":554,"correct":32},"互换的标的物必须都是建设用地使用权",{"key":24,"text":556,"correct":22},"互换的标的物之一必须是建设用地使用权",{"key":27,"text":558,"correct":22},"互换后的建设用地使用权人不发生变化",{"key":30,"text":560,"correct":22},"互换的建设用地使用权应当是等值的",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},93422,"区别于一般工程建设项目，房地产开发项目具有的特征不包括（）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"进度目标的限定性较强。",{"key":24,"text":568,"correct":32},"项目具有独特性",{"key":27,"text":570,"correct":22},"政策法规文件的多样性",{"key":30,"text":572,"correct":22},"成本目标较强。",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":30,"analysis":33},93423,"按照建设用地服务的产业类型划分，属于非农业建设用地的是（）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"农作物暖房用地",{"key":24,"text":580,"correct":22},"农用水泵房用地",{"key":27,"text":582,"correct":22},"农用道路用地",{"key":30,"text":584,"correct":32},"农民宅基地",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},93424,"关于使用集体建设用地的说法，正确的是()。",[589,591,593,595],{"key":20,"text":590,"correct":22},"使用集体建设用地不超过一定面积的，可不办理审批手续",{"key":24,"text":592,"correct":32},"使用集体建设用地应按规划用地，节约用地，保护耕地",{"key":27,"text":594,"correct":22},"使用集体建设用地应按计划用地，突破计划控制指标时应报当地土地管理部门备案",{"key":30,"text":596,"correct":22},"占用集体所有的农用地的，不用办理农用地转用审批手续",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":27,"analysis":33},93425,"下列关于集体建设用地使用原则的说法中，错误的是（）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"维护社会主义公有制，保护土地所有者和使用者的合法权益",{"key":24,"text":604,"correct":22},"按规划用地.节约用地.保护耕地",{"key":27,"text":606,"correct":32},"按计划用地，可以适当突破计划控制指标",{"key":30,"text":608,"correct":22},"如果涉及占用农用地的，必须依法办理农用地转用审批手续",[610,613,616,619,622,624],{"id":611,"name":612,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":614,"name":615,"category":7,"favorite":8},30,"经济师",{"id":617,"name":618,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":620,"name":621,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":623,"category":7,"favorite":8},"(初级)保险专业",{"id":625,"name":626,"category":7,"favorite":8},51,"(初级)财政税收"]