[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,34,50,2598,[13,34,46,58,70,82,94,105,117,129,141,153,164,176,188,200,212,224,236,248,260,272,284,294,306,318,326,334,346,358,370,382,394,406,418,430,440,452,464,476,488,500,512,520,532,542,554,566,578,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},93325,1,"单选题","在建设工程施工合同中，发包人的工程价款结算应当按照（）进行。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","进度款、竣工结算款",false,{"key":24,"text":25,"correct":22},"B","签约双方认可的支付方式",{"key":27,"text":28,"correct":29},"C","预付款、进度款、竣工结算款",true,{"key":31,"text":32,"correct":22},"D","发包人确定的支付方式","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},93326,"根据国务院《建设工程质量管理条例》，在正常使用条件下，下列建设工程中，最低保修期限为2年的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"基础设施工程",{"key":24,"text":41,"correct":22},"屋面防水工程",{"key":27,"text":43,"correct":29},"电气管线工程",{"key":31,"text":45,"correct":22},"供热与供冷系统",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},93327,"某工程竣工验收合格，但建设工程施工合同被法院认定无效，在此情形下，承包人请求参照合同约定支付工程价款，法院应当（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"不予支持",{"key":24,"text":53,"correct":22},"要求发包人给予一定比例补偿",{"key":27,"text":55,"correct":22},"要求发承包双方协商解决",{"key":31,"text":57,"correct":29},"予以支持",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},93328,"当事人就一工程订立建设工程施工合同，然后依照合同实际履行并组织施工。为办理施工许可证，当事人又就此工程另行订立建设工程施工合同，并进行备案。工程实施过程中有造价咨询机构参与工作，法院在审理该建设工程施工合同纠纷时，应当以（）作为结算价款的依据。",[62,64,66,68],{"key":20,"text":63,"correct":22},"实际履行的合同",{"key":24,"text":65,"correct":29},"经过备案的合同",{"key":27,"text":67,"correct":22},"双方认可的造价咨询机构的咨询意见",{"key":31,"text":69,"correct":22},"法院认可的造价咨询机构的咨询意见",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},93329,"那些使实际情况与合同规定不符合，最终引起工期和费用变化的事件，称为（）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"干扰事件",{"key":24,"text":77,"correct":22},"顺延事件",{"key":27,"text":79,"correct":22},"延误事件",{"key":31,"text":81,"correct":22},"工程合同",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},93330,"承包人的某项索赔要求．在该工程项目的合同条款中没有专门的文字叙述，但可以根据该合同某些条款的含义，推论出承包人有索赔权的索赔方式，称为（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"明示索赔",{"key":24,"text":89,"correct":29},"默示索赔",{"key":27,"text":91,"correct":22},"单项索赔",{"key":31,"text":93,"correct":22},"其他索赔",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},93331,"在工程竣工前和工程移交前，承包商将工程实施过程中因各种原因未能及时解决的单项索赔集中起来进行综合分析考虑，提出一份综合报告，由合同双方在工程交付前后进行最终谈判以综合方案解决索赔问题，该类索赔属于（）。",[98,99,101,103],{"key":20,"text":91,"correct":22},{"key":24,"text":100,"correct":22},"反索赔",{"key":27,"text":102,"correct":29},"一揽子索赔",{"key":31,"text":104,"correct":22},"工程变更索赔",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":27,"analysis":33},93332,"下列事件中．属于因承包商原因引起的可能造成工期延误的事件是（）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"征地、拆迁没有及时完成",{"key":24,"text":112,"correct":22},"工程预付款不能按时支付",{"key":27,"text":114,"correct":29},"施工机械设备不配套",{"key":31,"text":116,"correct":22},"设计变更",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},93333,"按《建设工程施工合同(示范文本)》(GF-2017-0201)的约定，工程师在收到承包人送交的索赔报告和有关资料后，应于（）天内给予答复，或要求承包人进一步补充索赔理由和证据。",[121,123,125,127],{"key":20,"text":122,"correct":29},"28",{"key":24,"text":124,"correct":22},"21",{"key":27,"text":126,"correct":22},"14",{"key":31,"text":128,"correct":22},"7",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":27,"analysis":33},93334,"工程项目施工过程中，常见的索赔证据不包括（）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"工程照片及声像资料",{"key":24,"text":136,"correct":22},"施工记录",{"key":27,"text":138,"correct":29},"索赔意向通知",{"key":31,"text":140,"correct":22},"各种工程合同文件",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},93335,"下列( )不属于工程变更的范围。",[145,147,149,151],{"key":20,"text":146,"correct":29},"取消合同中任何一项工作转由发包人实施",{"key":24,"text":148,"correct":22},"改变合同中任何一项工作的质量或其他特陛",{"key":27,"text":150,"correct":22},"改变合同工程的基线、标高、位置或尺寸",{"key":31,"text":152,"correct":22},"改变合同中任何一项工作的施工时间",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},93336,"建设工程施工合同无效，且建筑工程经竣工验收不合格的，而修复后的建设工程经竣工验收合格，发包人请求承包人承担修复费用的，人民法院( )。",[157,158,160,162],{"key":20,"text":51,"correct":22},{"key":24,"text":159,"correct":29},"应予支持",{"key":27,"text":161,"correct":22},"支持发承包双方各承担50％",{"key":31,"text":163,"correct":22},"支持发承包双方协商解决",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},93337,"关于对承包人索赔文件审核的说法，正确的是( )",[168,170,172,174],{"key":20,"text":169,"correct":22},"监理人收到承包人提交的索赔通知书后，应及时转交发包人，监理人无权要求承包人提交原始记录",{"key":24,"text":171,"correct":29},"承包人接受索赔处理结果的，发包人应在作出索赔处理结果答复后28天内完成赔付",{"key":27,"text":173,"correct":22},"监理人根据发包人的授权，在收到索赔通知书的60天内，将索赔处理结果答复承包人",{"key":31,"text":175,"correct":22},"承包人不接受索赔处理结果的，应直接向法院起诉索赔",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":20,"analysis":33},93338,"工程设计合同履行中，设计服务期限自( )起计算。",[180,182,184,186],{"key":20,"text":181,"correct":29},"开始设计通知中载明的开始设计日期",{"key":24,"text":183,"correct":22},"实际开始设计日期",{"key":27,"text":185,"correct":22},"设计合同签订日",{"key":31,"text":187,"correct":22},"提交设计资料之日",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":27,"analysis":33},93339,"工程设计合同履行过程中，设计人发生违约情况时，下列说法错误的是（ ）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"发包人可向设计人发出整改通知",{"key":24,"text":195,"correct":22},"设计人逾期仍不纠正的，发包人有权解除合同并向设计人发出解除合同通知",{"key":27,"text":197,"correct":29},"设计人逾期仍不纠正的，发包人不能解除合同",{"key":31,"text":199,"correct":22},"设计人应当承担由于违约所造成的费用增加",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},93340,"发包人无正当理由拒收勘察人提交的勘察文件，下列说法正确的是（ ）。",[204,206,208,210],{"key":20,"text":205,"correct":29},"视为发包人已接收勘察文件",{"key":24,"text":207,"correct":22},"视为发包人未接收勘察文件",{"key":27,"text":209,"correct":22},"勘察人需重新提交勘察文件",{"key":31,"text":211,"correct":22},"勘察人需协商发包人接收勘察文件",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":24,"analysis":33},93341,"除专用合同条款另有约定外，主要勘察人员不包括（ ）。",[216,218,220,222],{"key":20,"text":217,"correct":22},"项目负责人",{"key":24,"text":219,"correct":29},"勘探描述（记录）员",{"key":27,"text":221,"correct":22},"勘探负责人",{"key":31,"text":223,"correct":22},"试验负责人",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":31,"analysis":33},93342,"发包人和承包人双方根据工程具体情况对通用合同条款的补充、细化的合同条款，属于《标准施工招标文件》（2007年版）中的（ ）。",[228,230,232,234],{"key":20,"text":229,"correct":22},"协议书",{"key":24,"text":231,"correct":22},"附件",{"key":27,"text":233,"correct":22},"通用合同条款",{"key":31,"text":235,"correct":29},"专用合同条款",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},93343,"设计技术交底会应由（ ）组织。",[240,242,244,246],{"key":20,"text":241,"correct":22},"设计人",{"key":24,"text":243,"correct":29},"发包人",{"key":27,"text":245,"correct":22},"监理人",{"key":31,"text":247,"correct":22},"施工承包人",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":27,"analysis":33},93344,"工程勘察合同履行中，勘察服务期限自（ ）起计算。",[252,254,256,258],{"key":20,"text":253,"correct":22},"实际勘察日期",{"key":24,"text":255,"correct":22},"发包人支付定金",{"key":27,"text":257,"correct":29},"开始勘察通知中载明的开始勘察日期",{"key":31,"text":259,"correct":22},"提交勘察服务资料",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},93345,"在工程勘察合同履行中发生下列情况，属发包人违约的是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"发包人按约定的数量和期限将基础资料交给勘察人",{"key":24,"text":267,"correct":29},"发包人原因造成勘察停止",{"key":27,"text":269,"correct":22},"勘察文件不符合法律及合同约定",{"key":31,"text":271,"correct":22},"发包人及时接收勘察人提交的勘察文件",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":27,"analysis":33},93346,"除专用合同条款另有约定外，经验收合格的工程实际竣工日期，以（ ）为准。",[276,278,280,282],{"key":20,"text":277,"correct":22},"监理人对承包人提交的竣工验收申请报告表示同意的日期",{"key":24,"text":279,"correct":22},"发包人验收同意接收工程的日期",{"key":27,"text":281,"correct":29},"承包人提交竣工验收申请报告的日期",{"key":31,"text":283,"correct":22},"工程验收合格后发包人与承包人商定的日期",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},93347,"设计施工总承包合同履行过程中，（ ）组织竣工验收。",[288,289,291,292],{"key":20,"text":243,"correct":29},{"key":24,"text":290,"correct":22},"承包人",{"key":27,"text":245,"correct":22},{"key":31,"text":293,"correct":22},"技术负责人",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},93348,"承包人应在知道或应当知道索赔事件发生后28天内，向监理人递交（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"索赔报告",{"key":24,"text":301,"correct":22},"索赔档案",{"key":27,"text":303,"correct":22},"正式的索赔通知书",{"key":31,"text":305,"correct":29},"索赔意向通知书",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},93349,"关于缺陷责任期的说法，错误的是（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"缺陷责任期一般为1年，最长不超过2年，具体可由发承包双方在合同中约定",{"key":24,"text":313,"correct":22},"缺陷责任期从工程通过竣工验收之日起计",{"key":27,"text":315,"correct":29},"缺陷责任期等同于工程保修期",{"key":31,"text":317,"correct":22},"缺陷责任期实质上是预留工程质量保证金的一个期限",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},93350,"隐蔽工程经重新检验证明工程质量符合合同要求，由此增加的费用应当由（ ）承担。",[322,323,324,325],{"key":20,"text":245,"correct":22},{"key":24,"text":243,"correct":29},{"key":27,"text":290,"correct":22},{"key":31,"text":241,"correct":22},{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},93351,"发包人义务和进度计划在《标准施工招标文件》（2007年版）的（ ）中。",[330,331,332,333],{"key":20,"text":229,"correct":22},{"key":24,"text":233,"correct":29},{"key":27,"text":235,"correct":22},{"key":31,"text":231,"correct":22},{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},93352,"发包人未经竣工验收擅自使用工程的，其竣工日期应自（ ）之日起算。",[338,340,342,344],{"key":20,"text":339,"correct":22},"补充进行竣工验收",{"key":24,"text":341,"correct":22},"承包人交付",{"key":27,"text":343,"correct":22},"发包人正式使用",{"key":31,"text":345,"correct":29},"转移占有",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},93353,"建设单位与施工单位为完成工程施工任务，明确双方义务和违约责任的协议称为（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":29},"建设工程施工合同",{"key":24,"text":353,"correct":22},"建设工程设计合同",{"key":27,"text":355,"correct":22},"建设工程勘察合同",{"key":31,"text":357,"correct":22},"建设工程监理合同",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},93354,"《标准施工招标文件》（2007年版）的合同条款及格式，包括（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"协议书、通用条款和专用条款",{"key":24,"text":365,"correct":29},"通用合同条款、专用合同条款和合同附件格式",{"key":27,"text":367,"correct":22},"适用法规、通用条款和特殊情形",{"key":31,"text":369,"correct":22},"协议条款、备案条款和双方特殊约定",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},93355,"根据《建设工程质量保证金管理办法》（建质〔2017〕138号），缺陷责任期从（ ）之日起计算。",[374,376,378,380],{"key":20,"text":375,"correct":22},"竣工决算完成",{"key":24,"text":377,"correct":22},"交付使用",{"key":27,"text":379,"correct":29},"工程通过竣工验收之日",{"key":31,"text":381,"correct":22},"竣工结算完成",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},93356,"工程施工准备阶段，负责办理取得出入施工场地的专用和临时道路的通行权的是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":29},"发包单位",{"key":24,"text":389,"correct":22},"承包单位",{"key":27,"text":391,"correct":22},"监理单位",{"key":31,"text":393,"correct":22},"设计单位",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":24,"analysis":33},93357,"美国建筑师学会（AI A）标准合同体系中，B系列合同文件是关于（ ）之间的合同文本。",[398,400,402,404],{"key":20,"text":399,"correct":22},"业主与施工承包商",{"key":24,"text":401,"correct":29},"业主与建筑师",{"key":27,"text":403,"correct":22},"建筑师与专业咨询机构",{"key":31,"text":405,"correct":22},"建筑师行业内部",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":20,"analysis":33},93358,"在FIDIC《施工合同条件》实施过程中，不属于争端解决方式的是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":29},"调解",{"key":24,"text":413,"correct":22},"裁决",{"key":27,"text":415,"correct":22},"友好协商",{"key":31,"text":417,"correct":22},"仲裁",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":27,"analysis":33},93359,"国际上常用的工程施工合同类型不包括（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"FIDIC施工合同条件",{"key":24,"text":425,"correct":22},"NEC施工合同条件",{"key":27,"text":427,"correct":29},"CIF合同条件",{"key":31,"text":429,"correct":22},"AIA合同条件",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},93360,"当事人就一工程签订了中标合同，并进行了备案，然后依照合同实际履行并组织施工。为办理施工许可证，当事人又就此工程另行订立建设工程施工合同，未进行备案。工程实施过程中有造价咨询机构参与工作。法院在审理该建设工程施工合同纠纷时，应当以（ ）作为结算价款的依据。",[434,436,438,439],{"key":20,"text":435,"correct":22},"后又签订的工程施工合同",{"key":24,"text":437,"correct":29},"经过备案的中标合同",{"key":27,"text":67,"correct":22},{"key":31,"text":69,"correct":22},{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},93361,"工程施工合同（EC C）文本的主要选项条款中，适用于施工管理承包的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"选项A",{"key":24,"text":447,"correct":22},"选项B",{"key":27,"text":449,"correct":22},"选项E",{"key":31,"text":451,"correct":29},"选项F",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},93362,"FIDIC《施工合同条件》适用于土木工程施工的合同形式是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":29},"单价合同",{"key":24,"text":459,"correct":22},"固定总价合同",{"key":27,"text":461,"correct":22},"成本加酬金合同",{"key":31,"text":463,"correct":22},"调值总价合同",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},93363,"关于工程勘察合同违约责任的说法，错误的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"发包人发生违约情况时，勘察人可向发包人发出暂停勘察通知",{"key":24,"text":471,"correct":29},"发包人逾期仍不纠正的，勘察人无权解除合同",{"key":27,"text":473,"correct":22},"勘察人发生违约情况时，发包人可向勘察人发出整改通知",{"key":31,"text":475,"correct":22},"勘察人逾期仍不纠正，发包人有权解除合同并向勘察人发出解除合同通知",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},93365,"建筑市场需求者是业主，下列关于业主的说法不正确的是( )。",[480,482,484,486],{"key":20,"text":481,"correct":29},"政府作为业主是从监管者角度理解",{"key":24,"text":483,"correct":22},"政府投资兴建的建筑产品大多是以社会效益为主的公共建筑",{"key":27,"text":485,"correct":22},"企事业单位作为业主在大多数情况下是出于扩大再生产或简单再生产的需要",{"key":31,"text":487,"correct":22},"个人投资兴建的建筑产品主要是住宅",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},93366,"从建筑产品需求者角度看，建筑市场的风险表现方面不包括( )。",[492,494,496,498],{"key":20,"text":493,"correct":22},"价格与质量的矛盾",{"key":24,"text":495,"correct":29},"生产风险",{"key":27,"text":497,"correct":22},"价格与交货时间的矛盾",{"key":31,"text":499,"correct":22},"预付款风险",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},93367,"房地产需求不包括( )。",[504,506,508,510],{"key":20,"text":505,"correct":22},"生产性需求",{"key":24,"text":507,"correct":29},"就业性需求",{"key":27,"text":509,"correct":22},"消费性需求",{"key":31,"text":511,"correct":22},"投资性需求",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":27,"analysis":33},93368,"房地产需求中，对房地产市场有双重作用的需求是( )。",[516,517,518,519],{"key":20,"text":505,"correct":22},{"key":24,"text":509,"correct":22},{"key":27,"text":511,"correct":29},{"key":31,"text":507,"correct":22},{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":24,"analysis":33},93369,"消费者收入水平提高，会引起对消费性房地产需求的( )。",[524,526,528,530],{"key":20,"text":525,"correct":22},"降低",{"key":24,"text":527,"correct":29},"增加",{"key":27,"text":529,"correct":22},"不变",{"key":31,"text":531,"correct":22},"大幅降低",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":24,"analysis":33},93370,"在其他条件不变时的情况下，房地产开发成本上升，会使房地产的供给( )。",[536,537,539,540],{"key":20,"text":527,"correct":22},{"key":24,"text":538,"correct":29},"减少",{"key":27,"text":529,"correct":22},{"key":31,"text":541,"correct":22},"无法确定",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},93371,"房地产价格对房地产市场供求影响的说法，正确的是()。",[546,548,550,552],{"key":20,"text":547,"correct":22},"房地产商品价格上升，则房地产市场需求上升",{"key":24,"text":549,"correct":29},"房地产商品价格上升，则房地产市场需求下降",{"key":27,"text":551,"correct":22},"房地产价格越高，房地产供给就越小",{"key":31,"text":553,"correct":22},"房地产价格升高，房地产供给不变",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":31,"analysis":33},93372,"下列影响房地产交易价格的因素中，属于区域经济影响因素的是( )。",[558,560,562,564],{"key":20,"text":559,"correct":22},"社会治安",{"key":24,"text":561,"correct":22},"税收政策",{"key":27,"text":563,"correct":22},"城市形成历史",{"key":31,"text":565,"correct":29},"居民收入水平",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":27,"analysis":33},93373,"房地产交易价格影响因素中，对造成沿海城市和内地城市房地产价格的巨大差异影响更多的因素是( )。",[570,572,574,576],{"key":20,"text":571,"correct":22},"房地产自身因素和周边环境因素",{"key":24,"text":573,"correct":22},"行政与政治因素",{"key":27,"text":575,"correct":29},"区域社会因素",{"key":31,"text":577,"correct":22},"区域经济因素",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":24,"analysis":33},93374,"政府投资项目建设投资原则上不得超过经核定的( )。",[582,584,586,588],{"key":20,"text":583,"correct":22},"投资估算",{"key":24,"text":585,"correct":29},"投资概算",{"key":27,"text":587,"correct":22},"施工预算",{"key":31,"text":589,"correct":22},"竣工结算",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":20,"analysis":33},93375,"建筑市场需求来自( )。",[594,596,598,600],{"key":20,"text":595,"correct":29},"固定资产投资",{"key":24,"text":597,"correct":22},"房地产开发",{"key":27,"text":599,"correct":22},"个人",{"key":31,"text":601,"correct":22},"国家",[603,606,609,612,615,617],{"id":604,"name":605,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":607,"name":608,"category":7,"favorite":8},30,"经济师",{"id":610,"name":611,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":613,"name":614,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":616,"category":7,"favorite":8},"(初级)保险专业",{"id":618,"name":619,"category":7,"favorite":8},51,"(初级)财政税收"]