[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-32":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":591},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,32,50,2598,[13,34,46,58,70,79,91,103,115,127,139,151,163,172,184,196,208,220,232,244,256,268,280,292,301,313,325,337,346,356,364,376,388,400,409,420,430,442,454,463,475,487,496,508,520,532,544,555,567,579],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},93224,1,"单选题","由于出现专用合同条款规定的异常恶劣气候条件导致工期延误的，承包人有权要求发包人( )。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","延长工期",true,{"key":24,"text":25,"correct":26},"B","支付合理利润",false,{"key":28,"text":29,"correct":26},"C","支付违约金",{"key":31,"text":32,"correct":26},"D","增加费用","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},93225,"发包人应在监理人收到( )后28天内，将进度应付款支付给承包人。",[38,40,42,44],{"key":20,"text":39,"correct":22},"进度付款申请单",{"key":24,"text":41,"correct":26},"预付款保函",{"key":28,"text":43,"correct":26},"责任保修单",{"key":31,"text":45,"correct":26},"竣工付款申请单",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},93226,"对于无效合同，当事人对垫资利息没有约定，承包人请求支付利息的，( )。",[50,52,54,56],{"key":20,"text":51,"correct":26},"应予支持",{"key":24,"text":53,"correct":22},"不予支持",{"key":28,"text":55,"correct":26},"支持按人民银行规定的同期同类贷款利率支付",{"key":31,"text":57,"correct":26},"支持按人民银行规定的同期同类贷款利率的50％支付",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},93227,"工程施工合同附件格式中履约保函的担保期限自发包人和承包人签订合同之日起，至( )止。",[62,64,66,68],{"key":20,"text":63,"correct":26},"竣工验收之日",{"key":24,"text":65,"correct":26},"提交竣工验收报告之日",{"key":28,"text":67,"correct":22},"签发工程移交证书日",{"key":31,"text":69,"correct":26},"缺陷责任期止之日",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},93228,"预付款担保保函的担保期限自预付款支付给承包人起生效，至()止",[74,75,77,78],{"key":20,"text":63,"correct":26},{"key":24,"text":76,"correct":22},"发包人签发的进度款支付证书说明已完全扣清预付款",{"key":28,"text":67,"correct":26},{"key":31,"text":69,"correct":26},{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":24,"analysis":33},93229,"工程施工准备阶段，( )负责修建、维修、养护和管理施工所需的临时道路。",[83,85,87,89],{"key":20,"text":84,"correct":26},"发包单位",{"key":24,"text":86,"correct":22},"承包单位",{"key":28,"text":88,"correct":26},"监理单位",{"key":31,"text":90,"correct":26},"设计单位",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},93230,"承包人未通知监理人到场检查，私自将工程隐蔽部位覆盖的，监理人有权指示承包人钻孔探测或揭开检查，由此增加的费用和（或）工期延误由()承担。",[95,97,99,101],{"key":20,"text":96,"correct":26},"发包人",{"key":24,"text":98,"correct":22},"承包人",{"key":28,"text":100,"correct":26},"监理人",{"key":31,"text":102,"correct":26},"三方共同",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":28,"analysis":33},93231,"下列有关发包人提供材料和工程设备的描述，错误的是()。",[107,109,111,113],{"key":20,"text":108,"correct":26},"承包人应根据合同进度计划的安排，向监理人报送要求发包人交货的日期计划",{"key":24,"text":110,"correct":26},"发包人应在材料和工程设备到货7天前通知承包人",{"key":28,"text":112,"correct":22},"发包人提供的材料和工程设备运至交货地点验收后，由监理人负责接收、卸货",{"key":31,"text":114,"correct":26},"承包人会同监理人在约定的时间内，在交货地点共同进行验收",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":20,"analysis":33},93232,"根据《标准施工招标文件》（2007年版），对于发包人提供的材料和工程设备，承包人应在约定时间内()共同进行验收。",[119,121,123,125],{"key":20,"text":120,"correct":22},"会同监理人在交货地点",{"key":24,"text":122,"correct":26},"会同发包人代表、监理人在交货地点",{"key":28,"text":124,"correct":26},"会同监理人在施工现场",{"key":31,"text":126,"correct":26},"会同发包人代表、监理人在施工现场",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":24,"analysis":33},93233,"由发包人责任引起的暂停施工造成工期延误的，承包人有权要求发包人()。",[131,133,135,137],{"key":20,"text":132,"correct":26},"延长工期和增加费用，但不支付利润",{"key":24,"text":134,"correct":22},"延长工期和（或）增加费用，并支付合理利润",{"key":28,"text":136,"correct":26},"延长工期和（或）支付合理利润，但不增加费用",{"key":31,"text":138,"correct":26},"增加费用和支付合理利润，但不延长工期",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":28,"analysis":33},93234,"发包人在工程量清单中给定的用于支付必然发生但暂时不能确定价格的材料、工程设备及专业工程的金额指的是( )。",[143,145,147,149],{"key":20,"text":144,"correct":26},"其他费",{"key":24,"text":146,"correct":26},"暂列金额",{"key":28,"text":148,"correct":22},"暂估价",{"key":31,"text":150,"correct":26},"风险费",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":24,"analysis":33},93235,"已标价工程量清单中无适用或类似子目的单价，可按照( )的原则，由发、承包双方商定或确定变更工作的单价。",[155,157,159,161],{"key":20,"text":156,"correct":26},"成本加税金",{"key":24,"text":158,"correct":22},"成本加利润",{"key":28,"text":160,"correct":26},"成本加管理费用",{"key":31,"text":162,"correct":26},"制造费用加管理费用",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":31,"analysis":33},93236,"在履行合同过程中，承包人对发包人提供的图纸、技术要求以及其他方面提出的合理化建议，均应以书面形式提交( )。",[167,168,169,171],{"key":20,"text":98,"correct":26},{"key":24,"text":96,"correct":26},{"key":28,"text":170,"correct":26},"项目经理",{"key":31,"text":100,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":28,"analysis":33},93237,"《标准施工招标文件》（2007年版）中合同条款规定，发包人提供的材料和工程设备不符合合同要求时，承包人可获得的补偿内容是()。",[176,178,180,182],{"key":20,"text":177,"correct":26},"工期+利润",{"key":24,"text":179,"correct":26},"工期+费用",{"key":28,"text":181,"correct":22},"工期+费用+利润",{"key":31,"text":183,"correct":26},"费用+利润",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},93238,"( )意味承包人已按合同约定完成了施工、竣工和缺陷修复义务。",[188,190,192,194],{"key":20,"text":189,"correct":26},"颁发工程接收证书",{"key":24,"text":191,"correct":22},"颁发缺陷责任期终止证书",{"key":28,"text":193,"correct":26},"签发最终结清证书",{"key":31,"text":195,"correct":26},"结清单生效",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},93239,"根据《标准施工招标文件》（2007年版），下列关于缺陷责任期说法正确的是()。",[200,202,204,206],{"key":20,"text":201,"correct":26},"缺陷责任期自提交竣工验收报告日起计算",{"key":24,"text":203,"correct":26},"缺陷责任期等同于工程保修期",{"key":28,"text":205,"correct":26},"缺陷责任期一般为2年，最长不超过3年",{"key":31,"text":207,"correct":22},"颁发缺陷责任期终止证书，意味着承包人已按合同约定完成了施工、竣工和缺陷修复义务",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":28,"analysis":33},93240,"当事人对建设工程实际竣工日期有争议的，下列处理方法中，不符合合同法律制度规定的是( )。",[212,214,216,218],{"key":20,"text":213,"correct":26},"建设工程未经竣工验收，发包人擅自使用的，以转移占有建设工程之日为竣工日期",{"key":24,"text":215,"correct":26},"建设工程经竣工验收合格的，以竣工验收合格之日为竣工日期",{"key":28,"text":217,"correct":22},"承包人已经提交竣工验收报告，发包人拖延验收的，以发包人验收之日为竣工日期",{"key":31,"text":219,"correct":26},"承包人已经提交竣工验收报告，发包人拖延验收的，以承包人提交验收报告之日为竣工日期",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},93241,"开工通知发出后，尚不具备开工条件的，以( )为开工日期。",[224,226,228,230],{"key":20,"text":225,"correct":26},"开工通知载明的开工日期",{"key":24,"text":227,"correct":22},"开工条件具备的时间",{"key":28,"text":229,"correct":26},"实际进场施工时间",{"key":31,"text":231,"correct":26},"协商确定的时间",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":28,"analysis":33},93242,"承包人已经提交竣工验收报告，发包人拖延验收的，竣工日期( )。",[236,238,240,242],{"key":20,"text":237,"correct":26},"以合同约定的竣工日期为准",{"key":24,"text":239,"correct":26},"相应顺延",{"key":28,"text":241,"correct":22},"以承包人提交竣工报告之日为准",{"key":31,"text":243,"correct":26},"以实际通过的竣工验收之日为准",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":28,"analysis":33},93243,"签约合同价、质量标准条款在《标准施工招标文件》（2007年版）的()中",[248,250,252,254],{"key":20,"text":249,"correct":26},"通用合同条款",{"key":24,"text":251,"correct":26},"专用合同条款",{"key":28,"text":253,"correct":22},"合同附件格式",{"key":31,"text":255,"correct":26},"履约保函条款",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},93244,"下列文件中，( )是工程施工合同组成文件中唯一需要发包人和承包人同时签字盖章的法律文书。",[260,262,264,266],{"key":20,"text":261,"correct":22},"合同协议书",{"key":24,"text":263,"correct":26},"履约保函",{"key":28,"text":265,"correct":26},"预付款担保",{"key":31,"text":267,"correct":26},"专用条款",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":28,"analysis":33},93245,"下列有关隐蔽工程重新检验的表述，正确的是()。",[272,274,276,278],{"key":20,"text":273,"correct":26},"重新检验表明质量检验不合格，承包人承担发生的全部费用，工期给予顺延",{"key":24,"text":275,"correct":26},"重新检验表明质量合格，发包人承担由此发生的全部追加合同价款，赔偿承包人损失，工期不予顺延",{"key":28,"text":277,"correct":22},"重新检验表明质量合格，发包人承担由此发生的全部追加合同价款，赔偿承包人损失，并相应顺延工期",{"key":31,"text":279,"correct":26},"监理人未按约定的时间进行检查的，承包人覆盖工程隐蔽部位后，监理人对质量有疑问的，不能要求承包人对已覆盖的部位进行钻孔探测或揭开重新检验",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":20,"analysis":33},93246,"采用无条件担保方式，持有履约保函的发包人认为承包人有严重违约情况时，处理方式合理的是( )。",[284,286,288,290],{"key":20,"text":285,"correct":22},"可凭保函要求担保人予以赔偿，不需承包人确认",{"key":24,"text":287,"correct":26},"可凭保函要求担保人予以赔偿，但需承包人确认",{"key":28,"text":289,"correct":26},"可凭保函要求承包人予以赔偿，但需担保人确认",{"key":31,"text":291,"correct":26},"可凭保函要求承包人予以赔偿，不需担保人确认",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},93247,"工程或工程的任何部分对土地的占用所造成的第三者人身伤亡和财产损失，应由( )负责赔偿。",[296,297,298,299],{"key":20,"text":98,"correct":26},{"key":24,"text":96,"correct":22},{"key":28,"text":100,"correct":26},{"key":31,"text":300,"correct":26},"建设主管部门",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},93249,"承包人应在引起索赔事件发生的后()天内，向监理人递交索赔意向通知书；在发出索赔意向通知书后( )天内，向监理人递交正式的索赔通知书。",[305,307,309,311],{"key":20,"text":306,"correct":26},"7；14",{"key":24,"text":308,"correct":26},"14；14",{"key":28,"text":310,"correct":26},"28；14",{"key":31,"text":312,"correct":22},"28；28",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":31,"analysis":33},93250,"下列引起承包人索赔的事件中，只能获得工期补偿的是（ ）。",[317,319,321,323],{"key":20,"text":318,"correct":26},"发包人提前向承包人提供材料和工程设备",{"key":24,"text":320,"correct":26},"因发包人原因导致暂停施工",{"key":28,"text":322,"correct":26},"因发包人原因试运行失败，承包人修复",{"key":31,"text":324,"correct":22},"异常恶劣的气候条件导致工期延误",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},93251,"根据相关规定，在监理人对承包人提交的竣工验收申请报告审查后认为已具备竣工验收条件的，应在收到竣工验收申请报告后的（ ）天内提请发包人进行工程验收。",[329,331,333,335],{"key":20,"text":330,"correct":26},"14",{"key":24,"text":332,"correct":22},"28",{"key":28,"text":334,"correct":26},"42",{"key":31,"text":336,"correct":26},"56",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":28,"analysis":33},93252,"根据《标准施工招标文件》，由施工承包单位提出的索赔按程序得到了处理，且施工单位接受索赔处理结果的，建设单位应在作出索赔处理答复后（ ）天内完成赔付。",[341,342,344,345],{"key":20,"text":330,"correct":26},{"key":24,"text":343,"correct":26},"21",{"key":28,"text":332,"correct":22},{"key":31,"text":334,"correct":26},{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},93253,"建筑工程中，在缺陷责任期终止后（ ）天内，由监理人向承包人出具经发包人签认的缺陷责任期终止证书，并退还剩余的质量保证金。",[350,352,353,355],{"key":20,"text":351,"correct":26},"30",{"key":24,"text":332,"correct":26},{"key":28,"text":354,"correct":26},"15",{"key":31,"text":330,"correct":22},{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},93254,"监理人收到承包人提交的最终结清申请单后的（ ）天内，提出发包人应支付给承包人 的价款送发包人审核并抄送承包人。",[360,361,362,363],{"key":20,"text":330,"correct":22},{"key":24,"text":332,"correct":26},{"key":28,"text":334,"correct":26},{"key":31,"text":336,"correct":26},{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":20,"analysis":33},93255,"发包人在收到承包人竣工验收申请报告56天后未进行验收，则确定承包人的实际竣工日期应是()。",[368,370,372,374],{"key":20,"text":369,"correct":22},"承包人提交竣工验收申请报告日",{"key":24,"text":371,"correct":26},"发包人组织竣工验收日",{"key":28,"text":373,"correct":26},"开始进行竣工检验日",{"key":31,"text":375,"correct":26},"验收组通过竣工验收日",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":28,"analysis":33},93256,"除专用合同条款另有约定外，经验收合格的工程实际竣工日期，以（）为准。",[380,382,384,386],{"key":20,"text":381,"correct":26},"监理人对承包人提交的竣工验收申请报告表示同意的日期",{"key":24,"text":383,"correct":26},"发包人验收同意接收工程的日期",{"key":28,"text":385,"correct":22},"承包人提交竣工验收申请报告的日期",{"key":31,"text":387,"correct":26},"工程验收合格后发包人与承包人商定的日期",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},93257,"根据《标准施工招标文件》，下列工作属于承包人应承担的义务是（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":26},"及时完成施工场地的征用、移民、拆迁工作",{"key":24,"text":395,"correct":26},"负责办理取得出入施工场地的专用和临时道路的通行权",{"key":28,"text":397,"correct":26},"组织设计单位向相关单位对提供的施工图纸和设计文件进行交底",{"key":31,"text":399,"correct":22},"向监理人提交工程开工报审表申请开工",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},93258,"监理人收到承包人的书面建议后,应与发包人共同研究，确认存在变更的，应在收到承包 人书面建议后的（ ）天内作出变更指示。",[404,406,407,408],{"key":20,"text":405,"correct":26},"7",{"key":24,"text":330,"correct":22},{"key":28,"text":332,"correct":26},{"key":31,"text":351,"correct":26},{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":31,"analysis":33},93259,"施工准备阶段发包人的主要义务不包括（ ）。",[413,415,416,418],{"key":20,"text":414,"correct":26},"应及时完成施工场地的征用、移民、拆迁工作",{"key":24,"text":395,"correct":26},{"key":28,"text":417,"correct":26},"提供施工场地范围内地下管线和地下设施有关资料",{"key":31,"text":419,"correct":22},"对施工场地和周围环境进行查勘",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":20,"analysis":33},93260,"（ ）同时适用于单价合同和总价合同，合同条款中涉及单价合同和总价合同的，招标人在编制招标文件时，应根据各行业和具体工程的不同特点和要求进行修改和补充。",[424,425,426,428],{"key":20,"text":249,"correct":22},{"key":24,"text":251,"correct":26},{"key":28,"text":427,"correct":26},"特殊合同条款",{"key":31,"text":429,"correct":26},"补充合同条款",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},93261,"根据《标准施工招标文件》（2007年版）通用合同条款，下列引起承包人索赔的事件中，只能获得费用补偿的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"发包人提前向承包人提供材料、工程设备",{"key":24,"text":437,"correct":26},"因发包人提供的材料、工程设备造成工程不合格",{"key":28,"text":439,"correct":26},"发包人在工程竣工前提前占用工程",{"key":31,"text":441,"correct":26},"异常恶劣的气候条件，导致工期延误",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":31,"analysis":33},93262,"根据我国现行规定，下列关于索赔程序和索赔事件的说法中，正确的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":26},"承包人应在确认索赔事件发生后14天内向发包人发出索赔通知",{"key":24,"text":449,"correct":26},"承包人应在发出索赔通知后14天内向发包人递交详细的索赔报告",{"key":28,"text":451,"correct":26},"监理人应在收到索赔通知28天内作出回应",{"key":31,"text":453,"correct":22},"监理人应在收到索赔报告后42天内作出答复",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},93263,"承包人已经提交竣工验收报告，发包人拖延验收的,以（ ）提交验收报告之日为竣工日期",[458,459,460,461],{"key":20,"text":96,"correct":26},{"key":24,"text":98,"correct":22},{"key":28,"text":100,"correct":26},{"key":31,"text":462,"correct":26},"监察人",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},93264,"保证金总预留比例不得高于工程价款结算总额的（ ）。",[467,469,471,473],{"key":20,"text":468,"correct":26},"2%",{"key":24,"text":470,"correct":22},"3%",{"key":28,"text":472,"correct":26},"4%",{"key":31,"text":474,"correct":26},"5%",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},93265,"下列关于履约保函叙述中不正确的是（ ）。",[479,481,483,485],{"key":20,"text":480,"correct":22},"履约保函中的担保期限是指自发包人与承包人签订合同之日起，至竣工验收为止",{"key":24,"text":482,"correct":26},"履约保函中采用无条件担保方式",{"key":28,"text":484,"correct":26},"发包人可凭保函要求担保人予以赔偿，不需承包人确认",{"key":31,"text":486,"correct":26},"在本担保有效期内，因承包人违反合同约定的义务给你方造成经济损失时，担保人方在收到发包人方以书面形式提出的在担保金额以内的赔偿要求后，在7天内无条件支付",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":28,"analysis":33},93266,"某工程施工过程中，承包人未通知监理人检查，私自对某隐蔽部位进行了覆盖，监理人指示承包人揭开检查，经检查该隐蔽部位质量符合合同要求。根据《标准施工招标文件》，由此增加的费用和（或）工期延误应由（ ）承担。",[491,492,493,494],{"key":20,"text":96,"correct":26},{"key":24,"text":100,"correct":26},{"key":28,"text":98,"correct":22},{"key":31,"text":495,"correct":26},"分包人",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":31,"analysis":33},93267,"发包人未经竣工验收擅自使用工程的，其竣工日期应自（）之日起算。",[500,502,504,506],{"key":20,"text":501,"correct":26},"补充进行竣工验收",{"key":24,"text":503,"correct":26},"承包人交付",{"key":28,"text":505,"correct":26},"发包人正式使用",{"key":31,"text":507,"correct":22},"转移占有",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},93268,"根据九部委《标准施工招标文件》，监理人对隐蔽工程重新检查，经检验证明工程质量符合合同要求的，发包人应补偿承包人（ ）。",[512,514,516,518],{"key":20,"text":513,"correct":26},"工期和费用",{"key":24,"text":515,"correct":22},"工期、费用和利润",{"key":28,"text":517,"correct":26},"费用和利润",{"key":31,"text":519,"correct":26},"工期和利润",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},93269,"在施工过程中，监理工程师发现曾检验“合格”的工程部位仍存在施工质量问题，则修复该部位工程质量缺陷时，应（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":26},"由发包人承担费用，工期给予顺延",{"key":24,"text":527,"correct":26},"由承包人承担费用，工期给予顺延",{"key":28,"text":529,"correct":22},"由承包人承担费用，工期不予顺延",{"key":31,"text":531,"correct":26},"由发包人承担费用，工期不予顺延",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},93270,"根据《建设工程质量保证金管理办法》（建质〔2017138号）缺陷责任期从（）之日起计算。",[536,538,540,542],{"key":20,"text":537,"correct":26},"竣工决算完成",{"key":24,"text":539,"correct":26},"交付使用",{"key":28,"text":541,"correct":22},"工程通过竣工验收之日",{"key":31,"text":543,"correct":26},"竣工结算完成",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":28,"analysis":33},93271,"关于缺陷责任期的说法，错误的是()。",[548,550,552,553],{"key":20,"text":549,"correct":26},"缺陷责任期-般为1年，最长不超过2年，具体可由发承包双方在合同中约定",{"key":24,"text":551,"correct":26},"缺陷责任期从工程通过竣工验收之日起计",{"key":28,"text":203,"correct":22},{"key":31,"text":554,"correct":26},"缺陷责任期实质上是预留工程质量保证金的一个期限",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":28,"analysis":33},93272,"当事人对建设工程开工日期有争议的，人民法院予以认定的情形中表述不正确的是的（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":26},"开工日期为发包人或者监理人发出的开工通知载明的开工日期",{"key":24,"text":562,"correct":26},"开工通知发出后，尚不具备开工条件的，以开工条件具备的时间为开工日期",{"key":28,"text":564,"correct":22},"因承包人原因导致开工时间推迟的，以实际进场开工时间为开工日期",{"key":31,"text":566,"correct":26},"承包人经发包人同意已经实际进场施工的，以实际进场施工时间为开工日期",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},93273,"除专用合同条款另有约定外，关于合同条件执行优先顺序的解释，下列说法中正确的是（ ）。",[571,573,575,577],{"key":20,"text":572,"correct":26},"中标通知书优先于合同协议书",{"key":24,"text":574,"correct":22},"投标函优先于专用合同条款",{"key":28,"text":576,"correct":26},"图纸优先于通用合同条款",{"key":31,"text":578,"correct":26},"已标价工程量清单优先于中标通知书",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},93274,"下列关于建设工程实际竣工日期有争议的情形，处理正确的是（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":26},"建设工程经竣工验收合格的,以承包人提交验收报告之日为竣工日期",{"key":24,"text":586,"correct":22},"承包人已经提交竣工验收报告，发包人拖延验收的,以承包人提交验收报告之日为竣工日期",{"key":28,"text":588,"correct":26},"建设工程未经竣工验收，发包人擅自使用的，以竣工验收合格之日为竣工日期",{"key":31,"text":590,"correct":26},"建设工程未经竣工验收，发包人擅自使用的，以承包人提交验收报告之日为竣工日期",[592,595,598,601,604,606],{"id":593,"name":594,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":596,"name":597,"category":7,"favorite":8},30,"经济师",{"id":599,"name":600,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":602,"name":603,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":605,"category":7,"favorite":8},"(初级)保险专业",{"id":607,"name":608,"category":7,"favorite":8},51,"(初级)财政税收"]