[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,31,50,2598,[13,34,45,57,69,81,92,100,112,120,132,144,156,168,180,192,204,215,227,239,251,263,275,287,299,308,317,329,341,353,365,377,389,399,411,423,435,447,459,467,479,491,503,515,527,539,548,560,572,581],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},93173,1,"单选题","某房地产投资者有四个独立的投资项目可供选择，其数据如下表所示。各项目每年年末的净收益都相同，经营5年后转售。若基准收益率为12%，可利用资金总额为2000万元时，该投资都可选择的项目为（）。 单位：万元",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","甲.丙",true,{"key":24,"text":25,"correct":26},"B","甲.丁",false,{"key":28,"text":29,"correct":26},"C","丙.丁",{"key":31,"text":32,"correct":26},"D","甲.乙.丙","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},93174,"甲、乙、丙三个计算期相同的互斥方案，若有 则各方案从优到劣的排列顺序是()。",[38,39,41,43],{"key":20,"text":32,"correct":26},{"key":24,"text":40,"correct":22},"乙.丙.甲",{"key":28,"text":42,"correct":26},"丙.乙.甲",{"key":31,"text":44,"correct":26},"乙.甲.丙",{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":28,"analysis":33},93175,"现有甲、乙、丙三个互斥投资方案，各方案的投资额和投资后的净收益如下表所示，各方案的寿命期均为8年，基准收益率ie＝10％。各方案净现值从大到小排列正确的是()。",[49,51,53,55],{"key":20,"text":50,"correct":26},"甲>乙>丙",{"key":24,"text":52,"correct":26},"乙>丙>甲",{"key":28,"text":54,"correct":22},"乙>甲>丙",{"key":31,"text":56,"correct":26},"甲>丙>乙",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":28,"analysis":33},93176,"房地产投资风险转移的主要形式是（）。",[61,63,65,67],{"key":20,"text":62,"correct":26},"将风险损失摊销计入成本",{"key":24,"text":64,"correct":26},"从未发生风险损失项目的收益中补偿",{"key":28,"text":66,"correct":22},"与非保险业的其他人签订合同",{"key":31,"text":68,"correct":26},"建立内部风险基金",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},93177,"两个互斥型方案的效益基本相同，但计算期不同。对该两个方案进行比选时，应选用的比选方法是（）。",[73,75,77,79],{"key":20,"text":74,"correct":26},"净年值法",{"key":24,"text":76,"correct":22},"费用年值法",{"key":28,"text":78,"correct":26},"年值折现法",{"key":31,"text":80,"correct":26},"差额内部收益率法",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":31,"analysis":33},93178,"若投资资金是投资者进行投资的强制约束条件，则在进行方案比选时宜采用()。",[85,87,89,90],{"key":20,"text":86,"correct":26},"净现值法",{"key":24,"text":88,"correct":26},"净将来值法",{"key":28,"text":74,"correct":26},{"key":31,"text":91,"correct":22},"净现值率法",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},93179,"下列用于互斥型房地产投资方案比选的方法中，可直接用于计算期不同方案比选的是()。",[96,97,98,99],{"key":20,"text":86,"correct":26},{"key":24,"text":74,"correct":22},{"key":28,"text":88,"correct":26},{"key":31,"text":91,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":28,"analysis":33},93180,"房地产投资风险不仅具有随机性，同时它也附着在房地产经营中的某些确定事物中间，并通过它们的发生而起作用,这体现房地产投资风险的（）特征。",[104,106,108,110],{"key":20,"text":105,"correct":26},"客观性",{"key":24,"text":107,"correct":26},"不确定性",{"key":28,"text":109,"correct":22},"潜在性",{"key":31,"text":111,"correct":26},"可测性",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":31,"analysis":33},93181,"人们虽然可以知道房地产投资风险发生的概率，但不能预知其在未来何时一定会发生。房地产投资风险的这种特征，称为（）。",[116,117,118,119],{"key":20,"text":105,"correct":26},{"key":24,"text":111,"correct":26},{"key":28,"text":109,"correct":26},{"key":31,"text":107,"correct":22},{"id":121,"libraryId":5,"type":15,"typeLabel":16,"stem":122,"options":123,"answer":31,"analysis":33},93182,"下列关于空置率的表达，不正确的是（）。",[124,126,128,130],{"key":20,"text":125,"correct":26},"空置率是准备出租但没有出租出去的建筑面积占全部可出租面积的比例",{"key":24,"text":127,"correct":26},"对于经营性房地产开发项目和房地产置业投资项目，空置率的估算对有效毛资金收入的估算非常重要",{"key":28,"text":129,"correct":26},"在单位租金不变的情况下，空置率提高，导致有效毛租金收入减少",{"key":31,"text":131,"correct":22},"空置率降低，有效毛租金收入一定提高",{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":24,"analysis":33},93183,"用年值法对计算期不同的互斥方案进行比选时，以()的方案为优。",[136,138,140,142],{"key":20,"text":137,"correct":26},"年值小",{"key":24,"text":139,"correct":22},"净年值大",{"key":28,"text":141,"correct":26},"费用年值大",{"key":31,"text":143,"correct":26},"净现值小",{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":20,"analysis":33},93184,"采用差额内部收益率法进行投资方案比选时，是将差额内部收益率与基准收益率进行比较，判别标准是()。",[148,150,152,154],{"key":20,"text":149,"correct":22},"若差额内部收益率大于基准收益率，则投资大的方案为优",{"key":24,"text":151,"correct":26},"若差额内部收益率大于基准收益率，则投资小的方案为优",{"key":28,"text":153,"correct":26},"若差额内部收益率小于基准收益率，则投资大的方案为优",{"key":31,"text":155,"correct":26},"若差额内部收益率小于基准收益率，则方案间无法直接比较",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":31,"analysis":33},93185,"下列房地产投资风险中，属于系统风险的是()。",[160,162,164,166],{"key":20,"text":161,"correct":26},"收益现金流风险",{"key":24,"text":163,"correct":26},"机会成本风险",{"key":28,"text":165,"correct":26},"持有期风险",{"key":31,"text":167,"correct":22},"政策风险",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":31,"analysis":33},93186,"下列内容中，不属于房地产投资项目可行性研究报告摘要内容的是()。",[172,174,176,178],{"key":20,"text":173,"correct":26},"项目的主要经济指标结果",{"key":24,"text":175,"correct":26},"可行性研究的结论",{"key":28,"text":177,"correct":26},"项目的基本情况",{"key":31,"text":179,"correct":22},"项目经济指标的测算过程",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":31,"analysis":33},93187,"在房地产投资项目盈亏平衡分析中，用()表示的盈亏平衡点越高，说明风险越小。",[184,186,188,190],{"key":20,"text":185,"correct":26},"销售量",{"key":24,"text":187,"correct":26},"销售单价",{"key":28,"text":189,"correct":26},"销售额",{"key":31,"text":191,"correct":22},"单位产品变动成本",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":20,"analysis":33},93188,"在对投资项目进行敏感性分析时，临界点是指不确定因素的变化使项目（）的临界数值。",[196,198,200,202],{"key":20,"text":197,"correct":22},"由可行变为不可行",{"key":24,"text":199,"correct":26},"由低风险变为高风险",{"key":28,"text":201,"correct":26},"由敏感性弱变为敏感性强",{"key":31,"text":203,"correct":26},"由盈利变为不盈利",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":24,"analysis":33},93189,"对房地产投资者危害最大的一种风险是（）。",[208,209,211,213],{"key":20,"text":167,"correct":26},{"key":24,"text":210,"correct":22},"政治风险",{"key":28,"text":212,"correct":26},"市场供求风险",{"key":31,"text":214,"correct":26},"资本价值风险",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":20,"analysis":33},93190,"详细可行性研究的投资估算误差为（ ）。",[219,221,223,225],{"key":20,"text":220,"correct":22},"±10%",{"key":24,"text":222,"correct":26},"±20%",{"key":28,"text":224,"correct":26},"±30%",{"key":31,"text":226,"correct":26},"±40%",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":31,"analysis":33},93191,"下列关于环境影响评价相关要求的说法，错误的是（ ）。",[231,233,235,237],{"key":20,"text":232,"correct":26},"环境影响评价文件中的环境影响报告书，应当由具有相应环境影响评价资质的机构编制",{"key":24,"text":234,"correct":26},"建设单位报批的环境影响报告书应当附具对有关单位、专家和公众的意见采纳或者不采纳的说明",{"key":28,"text":236,"correct":26},"建设项目环境影响报告书经批准后，建设项目的性质发生重大变动的，建设单位应当重新报批建设项目环境影响报告书",{"key":31,"text":238,"correct":22},"建设项目环境影响报告书自批准之日起满3年，建设项目方开工建设的，其环境影响报告书应当报原审批部门重新审核",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":24,"analysis":33},93192,"将投资建设意图转换为定义明确、系统清晰、目标具体且具有策略性运作思路的高智力系统活动，称为（ ）。",[243,245,247,249],{"key":20,"text":244,"correct":26},"工程项目投资",{"key":24,"text":246,"correct":22},"工程项目策划",{"key":28,"text":248,"correct":26},"工程项目设计",{"key":31,"text":250,"correct":26},"工程项目实施",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":24,"analysis":33},93193,"房地产开发项目前期策划的核心是（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":26},"环境分析",{"key":24,"text":258,"correct":22},"市场定位",{"key":28,"text":260,"correct":26},"运行建议",{"key":31,"text":262,"correct":26},"经济评价",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":31,"analysis":33},93194,"下列关于工程项目目标系统的说法，错误的是（ ）。",[267,269,271,273],{"key":20,"text":268,"correct":26},"工程项目三大目标是质量、投资和进度",{"key":24,"text":270,"correct":26},"工程项目目标系统的策划，是工程建设实施过程动态控制的前提",{"key":28,"text":272,"correct":26},"三大目标之间存在相互制约的关系",{"key":31,"text":274,"correct":22},"力求建设质量高、投资省、工期短的项目",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":20,"analysis":33},93195,"下列不属于可行性研究内容的是（ ）。",[279,281,283,285],{"key":20,"text":280,"correct":22},"项目的详细管理计划",{"key":24,"text":282,"correct":26},"市场需求情况和拟建规模",{"key":28,"text":284,"correct":26},"投资估算与资金筹措",{"key":31,"text":286,"correct":26},"财务分析和国民经济分析",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":28,"analysis":33},93196,"可行性研究阶段中，从技术、财务和社会经济等方面深入详细地分析项目建设的必要性、可能性和经济合理性的阶段是（ ）。",[291,293,295,297],{"key":20,"text":292,"correct":26},"投资机会研究",{"key":24,"text":294,"correct":26},"初步可行性研究",{"key":28,"text":296,"correct":22},"详细可行性研究",{"key":31,"text":298,"correct":26},"项目评估决策",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":24,"analysis":33},93197,"初步可行性研究是介于投资机会研究和详细可行性研究之间的工作，投资估算误差为（ ）。",[303,304,305,306],{"key":20,"text":224,"correct":26},{"key":24,"text":222,"correct":22},{"key":28,"text":220,"correct":26},{"key":31,"text":307,"correct":26},"±5%",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},93198,"下列不属于工程项目可行性研究阶段的是（ ）。",[312,313,314,315],{"key":20,"text":292,"correct":26},{"key":24,"text":294,"correct":26},{"key":28,"text":296,"correct":26},{"key":31,"text":316,"correct":22},"项目建议书阶段",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},93199,"从全社会角度衡量商品或生产要素投入或产出的成本与效益的价格，称为（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":26},"市场价格",{"key":24,"text":324,"correct":26},"目标价格",{"key":28,"text":326,"correct":26},"国家指导价格",{"key":31,"text":328,"correct":22},"影子价格",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},93200,"对于国民经济评价结论不可行，财务评价可行的项目，一般应（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":26},"予以通过",{"key":24,"text":336,"correct":22},"予以否定",{"key":28,"text":338,"correct":26},"重新考虑方案",{"key":31,"text":340,"correct":26},"不予置理",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":24,"analysis":33},93201,"以财务评价和国民经济评价结论选取方案的说法，错误的是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":26},"财务评价结论和国民经济评价结论都可行的项目，可予以通过",{"key":24,"text":348,"correct":22},"对于国民经济评价结论不可行，财务评价可行的项目，可予以通过",{"key":28,"text":350,"correct":26},"对于国民经济评价和财务评价结论都不可行的项目，应予以否定",{"key":31,"text":352,"correct":26},"对于关系公共利益的社会发展项目，国民经济评价结论可行，但财务评价结论不可行的，应重新考虑方案",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":28,"analysis":33},93202,"关于影子价格的说法，正确的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":26},"影子价格是一种计划价格",{"key":24,"text":360,"correct":26},"影子价格的确定主要以市场价格为基础",{"key":28,"text":362,"correct":22},"影子价格反映市场供求状况和资源的稀缺程度",{"key":31,"text":364,"correct":26},"影子价格只是一种理论价格，无法具体进行估计",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},93203,"对于可能造成重大环境影响的项目，应当（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":26},"填报环境影响登记表",{"key":24,"text":372,"correct":26},"编制环境影响报告表",{"key":28,"text":374,"correct":22},"编制环境影响报告书",{"key":31,"text":376,"correct":26},"填报环境影响数据表",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},93204,"下列选项中，不属于社会评价主要内容的是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":26},"社会影响分析",{"key":24,"text":384,"correct":22},"国民经济评价分析",{"key":28,"text":386,"correct":26},"互适性分析",{"key":31,"text":388,"correct":26},"社会风险分析",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},93205,"国民经济评价采用的价格是（ ）。",[393,395,396,397],{"key":20,"text":394,"correct":26},"不变价格",{"key":24,"text":328,"correct":22},{"key":28,"text":322,"correct":26},{"key":31,"text":398,"correct":26},"可变价格",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":31,"analysis":33},93206,"建设项目环境影响报告书、环境影响报告表自批准之日起满（ ）年，建设项目方开工建设的，应当报原审批部门重新审核。",[403,405,407,409],{"key":20,"text":404,"correct":26},"2",{"key":24,"text":406,"correct":26},"3",{"key":28,"text":408,"correct":26},"4",{"key":31,"text":410,"correct":22},"5",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},93208,"FIDIC《土木工程施工合同条件》采用的是基于以()为核心的管理模式。",[415,417,419,421],{"key":20,"text":416,"correct":26},"业主",{"key":24,"text":418,"correct":22},"（咨询）工程师",{"key":28,"text":420,"correct":26},"承包商",{"key":31,"text":422,"correct":26},"指定分包商",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":20,"analysis":33},93209,"英国NEC工程施工合同文本结构中主要选项条款中，选项C对应( )。",[427,429,431,433],{"key":20,"text":428,"correct":22},"带有分项工程表的目标合同",{"key":24,"text":430,"correct":26},"带有分项工程表的标价合同",{"key":28,"text":432,"correct":26},"带有工程量清单的标价合同",{"key":31,"text":434,"correct":26},"带有工程量清单的目标合同",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":31,"analysis":33},93210,"美国AIA系列合同文件中，建筑师行业所用的文件，属于( )",[439,441,443,445],{"key":20,"text":440,"correct":26},"A系列",{"key":24,"text":442,"correct":26},"B系列",{"key":28,"text":444,"correct":26},"C系列",{"key":31,"text":446,"correct":22},"D系列",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":28,"analysis":33},93211,"根据FIDIC《施工合同条件》的规定，关于争端裁决委员会（DAA B）及其裁决的说法，正确的有( )。",[451,453,455,457],{"key":20,"text":452,"correct":26},"DAAB须由3人组成",{"key":24,"text":454,"correct":26},"合同一方确定DAAB主席",{"key":28,"text":456,"correct":22},"DAAB成员的酬金由合同双方各支付一半",{"key":31,"text":458,"correct":26},"DAAB在收到书面报告后48天内对争端作出裁决",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":28,"analysis":33},93212,"美国AIA系列合同文件中，用于建筑师与专业咨询机构之间的合同文本，属于()。",[463,464,465,466],{"key":20,"text":440,"correct":26},{"key":24,"text":442,"correct":26},{"key":28,"text":444,"correct":22},{"key":31,"text":446,"correct":26},{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":28,"analysis":33},93213,"关于FIDIC《施工合同条件》中指定分包商的说法，正确的是( )。",[471,473,475,477],{"key":20,"text":472,"correct":26},"指定分包商由承包商指定",{"key":24,"text":474,"correct":26},"指定分包商应与业主签订合同",{"key":28,"text":476,"correct":22},"指定分包商可以承担部分工程的施工任务",{"key":31,"text":478,"correct":26},"承包商不负责对指定分包商的监管",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},93214,"根据FIDIC《施工合同条件》，给指定分包商的付款应从（ ）中开支。",[483,485,487,489],{"key":20,"text":484,"correct":22},"暂定金额",{"key":24,"text":486,"correct":26},"暂估价",{"key":28,"text":488,"correct":26},"分包管理费",{"key":31,"text":490,"correct":26},"应分摊费用",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},93215,"美国建筑师学会(AI A)标准合同体系中，B系列合同文件是关于()之间的合同文本。",[495,497,499,501],{"key":20,"text":496,"correct":26},"业主与施工承包商",{"key":24,"text":498,"correct":22},"业主与建筑师",{"key":28,"text":500,"correct":26},"建筑师与专业咨询机构",{"key":31,"text":502,"correct":26},"建筑师行业内部",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":31,"analysis":33},93216,"在FIDIC《施工合同条件》实施过程中,争端解决方式不包括（ ）",[507,509,511,513],{"key":20,"text":508,"correct":26},"裁决",{"key":24,"text":510,"correct":26},"友好协商",{"key":28,"text":512,"correct":26},"仲裁",{"key":31,"text":514,"correct":22},"决斗",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":31,"analysis":33},93217,"发包人应在收到定金或预付款支付申请后()天内，将定金或预付款支付给勘察人。",[519,521,523,525],{"key":20,"text":520,"correct":26},"7",{"key":24,"text":522,"correct":26},"14",{"key":28,"text":524,"correct":26},"15",{"key":31,"text":526,"correct":22},"28",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},93218,"发包人发生违约情况时，勘察人可向发包人发出( )。",[531,533,535,537],{"key":20,"text":532,"correct":26},"整改通知",{"key":24,"text":534,"correct":22},"暂停勘察通知",{"key":28,"text":536,"correct":26},"解除合同通知",{"key":31,"text":538,"correct":26},"费用赔偿通知",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":28,"analysis":33},93219,"除专用合同条款另有约定外，发包人对于设计文件的审查期限，自文件接收之日起不应超过( )天。",[543,544,546,547],{"key":20,"text":520,"correct":26},{"key":24,"text":545,"correct":26},"12",{"key":28,"text":522,"correct":22},{"key":31,"text":526,"correct":26},{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":24,"analysis":33},93220,"关于发包人与勘察人的违约责任，以下说法错误的是()。",[552,554,556,558],{"key":20,"text":553,"correct":26},"发包人发生违约情况时，勘察人可向发包人发出暂停勘察通知",{"key":24,"text":555,"correct":22},"发包人逾期仍不纠正的，勘察人无权解除合同",{"key":28,"text":557,"correct":26},"勘察人发生违约情况时，发包人可向勘察人发出整改通知",{"key":31,"text":559,"correct":26},"勘察人逾期仍不纠正的，发包人有权解除合同",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},93221,"工程勘察合同履行过程中，主要勘察人员应相对稳定，更换主要勘察人员的，应取得( )的同意。",[564,566,568,570],{"key":20,"text":565,"correct":26},"勘察单位负责人",{"key":24,"text":567,"correct":22},"发包人",{"key":28,"text":569,"correct":26},"专业监理工程师",{"key":31,"text":571,"correct":26},"总监理工程师",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},93222,"设计人更换项目负责人应事先征得发包人同意，并应在更换（ ）天前将拟更换的项目负责人的姓名和详细资料提交发包人。",[576,577,578,580],{"key":20,"text":520,"correct":26},{"key":24,"text":522,"correct":22},{"key":28,"text":579,"correct":26},"21",{"key":31,"text":526,"correct":26},{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},93223,"关于施工合同文件优先解释顺序的说法，正确的是( )。",[585,587,589,591],{"key":20,"text":586,"correct":26},"中标通知书、投标函及投标函附录、通用条款、专用条款",{"key":24,"text":588,"correct":22},"中标通知书、投标函及投标函附录、技术标准和文件、图纸",{"key":28,"text":590,"correct":26},"图纸、工程量清单、通用条款、中标通知书",{"key":31,"text":592,"correct":26},"图纸、投标通知书及其附件、通用条款、专用条款",[594,597,600,602,605,607],{"id":595,"name":596,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":598,"name":599,"category":7,"favorite":8},30,"经济师",{"id":9,"name":601,"category":7,"favorite":8},"(初级)银行从业资格",{"id":603,"name":604,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":606,"category":7,"favorite":8},"(初级)保险专业",{"id":608,"name":609,"category":7,"favorite":8},51,"(初级)财政税收"]