[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,3,50,2598,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,261,273,285,297,308,320,332,344,356,368,380,392,400,409,421,433,444,456,467,479,490,502,513,525,537,546,553,563,574,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},90835,1,"单选题","下列关于投标人的说法中，错误的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","投标人应具备承担招标项目的能力",false,{"key":24,"text":25,"correct":26},"B","投标人可以补充、修改或撤回已提交的投标文件",true,{"key":28,"text":29,"correct":22},"C","投标人可以参加现场踏勘",{"key":31,"text":32,"correct":22},"D","投标人应制定对招标人有吸引力的施工方案","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},90836,"施工方案是投标报价的一个前提条件，也是招标人评定中标人的依据之一。施工方案应由（ ）主持制定。",[38,40,42,44],{"key":20,"text":39,"correct":22},"投标代理机构",{"key":24,"text":41,"correct":26},"投标企业的技术负责人",{"key":28,"text":43,"correct":22},"监理机构",{"key":31,"text":45,"correct":22},"招标管理部门",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},90837,"建设工程合同管理的特点主要是由（ ）的特点决定。",[50,52,54,56],{"key":20,"text":51,"correct":22},"管理制度",{"key":24,"text":53,"correct":22},"招标方式",{"key":28,"text":55,"correct":22},"建设项目",{"key":31,"text":57,"correct":26},"工程合同",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},90838,"招标人通过评标确定中标人，发出中标通知书，属于 ( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"要约邀请",{"key":24,"text":65,"correct":22},"要约",{"key":28,"text":67,"correct":22},"邀请",{"key":31,"text":69,"correct":26},"承诺",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},90840,"按照《合同法》规定，要约人撤销要约的通知应在（ ）到达受要约人，才能取消该项要约。",[74,76,78,80],{"key":20,"text":75,"correct":22},"要约到达受要约人之前",{"key":24,"text":77,"correct":26},"受要约人发出承诺通知之前",{"key":28,"text":79,"correct":22},"承诺通知到达要约人之前",{"key":31,"text":81,"correct":22},"受要约人发出承诺通知之后",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},90841,"为了保障当事人所订立的合同符合国家和社会公共利益，协调不同当事人的利益冲突，以及个别利益和国家利益的冲突，保护正常的交易秩序，我国《合同法》确认了( )",[86,88,90,92],{"key":20,"text":87,"correct":22},"公开原则",{"key":24,"text":89,"correct":22},"自愿原则",{"key":28,"text":91,"correct":22},"公平原则",{"key":31,"text":93,"correct":26},"合法原则",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},90842,"根据我国《合同法》，要约生效的时间为( )。",[98,100,102,104],{"key":20,"text":99,"correct":22},"合同签订之日",{"key":24,"text":101,"correct":26},"要约送达到受约人之日",{"key":28,"text":103,"correct":22},"双方约定的时间",{"key":31,"text":105,"correct":22},"合同管理部门确定的时间",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},90843,"除当事人双方意思表示一致以外，尚需交付标的物才能成立的合同，称为( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"要式合同",{"key":24,"text":113,"correct":22},"单务合同",{"key":28,"text":115,"correct":22},"诺成合同",{"key":31,"text":117,"correct":26},"实践合同",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},90845,"下列管理制度中，不属于建筑企业科学、合理的合同管理制度的是( )。",[122,124,126,128],{"key":20,"text":123,"correct":26},"建筑工程合同进度管理制度",{"key":24,"text":125,"correct":22},"建筑企业内部合同预签制度",{"key":28,"text":127,"correct":22},"合同管理目标制度",{"key":31,"text":129,"correct":22},"合同统计考核制度",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},90846,"债务人或者第三人将其动产或权利移交债权人占有，用以担保债权的履行，这种担保方式称为( )。",[134,136,138,140],{"key":20,"text":135,"correct":22},"留置",{"key":24,"text":137,"correct":22},"抵押",{"key":28,"text":139,"correct":26},"质押",{"key":31,"text":141,"correct":22},"保证",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},90848,"施工组织设计和工期条款在《建设工程施工合同（示范文本）》的( )中。",[146,148,150,152],{"key":20,"text":147,"correct":22},"协议书",{"key":24,"text":149,"correct":26},"通用条款",{"key":28,"text":151,"correct":22},"专用条款",{"key":31,"text":153,"correct":22},"附件",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},90849,"《建设工程质量管理条例》明确规定，在正常使用条件下，建设工程的供热系统最低保修期限为( )。",[158,160,162,164],{"key":20,"text":159,"correct":22},"5个采暖期",{"key":24,"text":161,"correct":22},"3个采暖期",{"key":28,"text":163,"correct":26},"2个采暖期",{"key":31,"text":165,"correct":22},"1个采暖期",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},90850,"根据《建设工程质量管理条例》，下列工程中，在正常使用条件下最低保修期限为2年的是( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"屋面防水",{"key":24,"text":173,"correct":22},"基础设施",{"key":28,"text":175,"correct":26},"装修工程",{"key":31,"text":177,"correct":22},"供热系统",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},90851,"发包人和承包人就具体工程项目的建筑施工、设备安装、设备调试、工程保修等 工作内容，明确双方权利、义务关系的协议称为( )。",[182,184,186,188],{"key":20,"text":183,"correct":26},"建设工程施工合同",{"key":24,"text":185,"correct":22},"建设工程设计合同",{"key":28,"text":187,"correct":22},"建设工程勘察合同",{"key":31,"text":189,"correct":22},"建设工程监理合同",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},90853,"由于承包人的原因造成工程设备部能按原定目标使用而需要再次检查，发包人有权要求承包人相应延长缺陷责任期，但缺陷责任期最长不得超过（）年。",[194,196,198,200],{"key":20,"text":195,"correct":22},"1",{"key":24,"text":197,"correct":26},"2",{"key":28,"text":199,"correct":22},"3",{"key":31,"text":201,"correct":22},"4",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},90854,"《建设工程质量管理条例》所规定的建设工程保修期，自（ ）之日起计算。",[206,208,210,212],{"key":20,"text":207,"correct":22},"竣工决算",{"key":24,"text":209,"correct":22},"交付使用",{"key":28,"text":211,"correct":26},"竣工验收合格",{"key":31,"text":213,"correct":22},"产品销售",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},90855,"按我国《建设工程施工合同(示范文本)》的约定，工程师在收到承包人送交的索赔报告和有关资料后，应于( )天内给予答复，或要求承包人进一步补充索赔理由和证据。",[218,220,222,224],{"key":20,"text":219,"correct":22},"7",{"key":24,"text":221,"correct":22},"14",{"key":28,"text":223,"correct":22},"21",{"key":31,"text":225,"correct":26},"28",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},90856,"承包人的某些索赔要求，虽然在工程项目的合同条款中没有专门的文字依据。但可以根据该合同某些条款的含义，推论出承包人有索赔权，这种索赔被称为( )。",[230,232,234,236],{"key":20,"text":231,"correct":22},"合同中的明示索赔",{"key":24,"text":233,"correct":22},"综合索赔",{"key":28,"text":235,"correct":26},"合同中的默示索赔",{"key":31,"text":237,"correct":22},"双向索赔",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},90858,"根据我国《建设工程施工合同（示范文本）》规定，承包人应在索赔事件发生后（ ）内向工程师递交索赔意向通知。",[242,244,246,248],{"key":20,"text":243,"correct":22},"7天",{"key":24,"text":245,"correct":22},"14天",{"key":28,"text":247,"correct":26},"28天",{"key":31,"text":249,"correct":22},"56天",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},90859,"由于发包人或者监理工程师的指令增加工程量和附加工程，造成工期延长和费用增加时，承包人提出索赔属于（ ）。",[254,256,258,259],{"key":20,"text":255,"correct":22},"默示索赔",{"key":24,"text":257,"correct":22},"反索赔",{"key":28,"text":233,"correct":22},{"key":31,"text":260,"correct":26},"工程变更索赔",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},90860,"下列索赔类别中，属于按索赔事件性质分类的是( )。",[265,267,269,271],{"key":20,"text":266,"correct":22},"承包商与业主间的索赔",{"key":24,"text":268,"correct":22},"承包商向保险公司的索赔",{"key":28,"text":270,"correct":26},"合同终止的索赔",{"key":31,"text":272,"correct":22},"费用索赔",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},90861,"工程项目施工过程中，常见的索赔证据不包括（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"施工记录",{"key":24,"text":280,"correct":22},"各种工程合同文件",{"key":28,"text":282,"correct":26},"索赔报告",{"key":31,"text":284,"correct":22},"工程照片及声像资料",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},90863,"有效控制工程造价应遵循( )的原则。",[289,291,293,295],{"key":20,"text":290,"correct":26},"以设计阶段为重点进行建设全过程造价控制",{"key":24,"text":292,"correct":22},"工程造价最优化",{"key":28,"text":294,"correct":22},"以经济分析为主",{"key":31,"text":296,"correct":22},"以技术分析为主",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},90864,"具有设计任务书和总体设计，经济上实行独立核算，行政上具有独立组织形式的工程被称为（ ）。",[301,303,304,306],{"key":20,"text":302,"correct":22},"单位工程",{"key":24,"text":55,"correct":26},{"key":28,"text":305,"correct":22},"分部工程",{"key":31,"text":307,"correct":22},"分项工程",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},90865,"业主进行工程建设花费的全部固定资产投资被称为( )。",[312,314,316,318],{"key":20,"text":313,"correct":22},"建筑安装工程造价",{"key":24,"text":315,"correct":22},"建设项目总投资",{"key":28,"text":317,"correct":26},"建设工程造价",{"key":31,"text":319,"correct":22},"建筑产品价格",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},90866,"工程造价的确定要根据不同的建设阶段，分次进行。这种计价特点被称为( )。",[324,326,328,330],{"key":20,"text":325,"correct":26},"多次性计价",{"key":24,"text":327,"correct":22},"分部组合计价",{"key":28,"text":329,"correct":22},"单件性计价",{"key":31,"text":331,"correct":22},"按构成计价",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},90868,"我国进口设备时，若采用装运港船上交货价方式，卖方的责任有（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"负责租船和订舱，支付运费",{"key":24,"text":339,"correct":22},"负责办理保险及支付保险费",{"key":28,"text":341,"correct":22},"办理在目的港的进口手续",{"key":31,"text":343,"correct":26},"负责货物装船前的一切费用和风险",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},90869,"某建设工程建设期为2年，第一年向银行贷款400万元，年贷款利率为5％。假设贷款在第一年分次均衡发放，则该项目建设期贷款利息为( )万元。",[348,350,352,354],{"key":20,"text":349,"correct":22},"20.5",{"key":24,"text":351,"correct":26},"30.5",{"key":28,"text":353,"correct":22},"40",{"key":31,"text":355,"correct":22},"41",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},90870,"下列费用中，不属于建筑安装工程费用中企业管理费的是的是( )。",[360,362,364,366],{"key":20,"text":361,"correct":22},"工具用具使用费",{"key":24,"text":363,"correct":22},"财务费",{"key":28,"text":365,"correct":26},"土地使用费",{"key":31,"text":367,"correct":22},"职工教育经费",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},90871,"下列费用中，属于建筑安装工程造价企业管理费的是（ ）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"材料检验试验费",{"key":24,"text":375,"correct":22},"文明施工费",{"key":28,"text":377,"correct":26},"工会经费",{"key":31,"text":379,"correct":22},"脚手架费用",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":20,"analysis":33},90873,"根据《建筑安装工程费用项目组成》（建标[20031206号），施工中发生的脚手架费用应列入( )。",[384,386,388,390],{"key":20,"text":385,"correct":26},"措施项目费",{"key":24,"text":387,"correct":22},"直接工程费",{"key":28,"text":389,"correct":22},"企业管理费",{"key":31,"text":391,"correct":22},"规费",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":31,"analysis":33},90874,"在建筑安装工程费用中，脚手架搭、拆、运输费用应列入( )。",[396,397,398,399],{"key":20,"text":387,"correct":22},{"key":24,"text":389,"correct":22},{"key":28,"text":391,"correct":22},{"key":31,"text":385,"correct":26},{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},90875,"按照概算法分类，下列费用中应列入工程建设其他项目费用的是( )。",[404,406,407,408],{"key":20,"text":405,"correct":22},"预备费",{"key":24,"text":391,"correct":22},{"key":28,"text":389,"correct":22},{"key":31,"text":365,"correct":26},{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":28,"analysis":33},90877,"某建设项目建设期3年，各年计划投资额分别为1800万元、2400万元和1900 万元，年均价格上涨率为5％，则该项目建设期涨价预备费约为( ) 。",[413,415,417,419],{"key":20,"text":414,"correct":22},"305万元",{"key":24,"text":416,"correct":22},"463万元",{"key":28,"text":418,"correct":26},"636万元",{"key":31,"text":420,"correct":22},"961万元",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":31,"analysis":33},90878,"暂列金额是指招标人在工程量清单中暂列并包括在合同价款中的款项，在工程量清单中应列入（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"措施项目清单",{"key":24,"text":428,"correct":22},"分部分项工程量清单",{"key":28,"text":430,"correct":22},"规费项目清单",{"key":31,"text":432,"correct":26},"其他项目清单",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":31,"analysis":33},90879,"下列投资和费用构成项目中，属于建设项目总投资中的建设投资的是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"流动资金投资",{"key":24,"text":440,"correct":22},"建设期利息",{"key":28,"text":442,"correct":22},"经营成本",{"key":31,"text":405,"correct":26},{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":20,"analysis":33},90880,"下列工程费用中，应列入工程建设其他费用的是( )。",[448,450,452,454],{"key":20,"text":449,"correct":26},"建设单位管理费",{"key":24,"text":451,"correct":22},"设备安装费",{"key":28,"text":453,"correct":22},"工程排污费",{"key":31,"text":455,"correct":22},"施工企业管理费",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":28,"analysis":33},90882,"下列各种费用中，属于工程建设其他费用的是( )。",[460,462,464,465],{"key":20,"text":461,"correct":22},"设备购置费",{"key":24,"text":463,"correct":22},"间接费",{"key":28,"text":365,"correct":26},{"key":31,"text":466,"correct":22},"直接费",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":28,"analysis":33},90883,"措施项目是指为完成工程项目施工、发生于该工程施工准备和施工过程中的( )项目。",[471,473,475,477],{"key":20,"text":472,"correct":22},"工程暂列",{"key":24,"text":474,"correct":22},"工程实体",{"key":28,"text":476,"correct":26},"非工程实体",{"key":31,"text":478,"correct":22},"分部分项工程",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":28,"analysis":33},90884,"按照形成资产法，建设投资的估算应包括固定资产费用( )其他资产费用和预备费四个部分。",[483,485,486,488],{"key":20,"text":484,"correct":22},"工程费用",{"key":24,"text":440,"correct":22},{"key":28,"text":487,"correct":26},"无形资产费用",{"key":31,"text":489,"correct":22},"流动资产费用",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":28,"analysis":33},90885,"下列费用中，属于建筑安装企业管理费的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"加班加点工资",{"key":24,"text":497,"correct":22},"采购及保管费",{"key":28,"text":499,"correct":26},"劳动保护费",{"key":31,"text":501,"correct":22},"运杂费",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},90887,"项目实施时可能发生的难以预料的支出和需要预先预留的费用，应列入建设工程造价的( )。",[506,508,510,511],{"key":20,"text":507,"correct":26},"基本预备费",{"key":24,"text":509,"correct":22},"建设单位开办费",{"key":28,"text":484,"correct":22},{"key":31,"text":512,"correct":22},"涨价预备费",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},90888,"进口设备增值税额应以( )乘以增值税率计算。",[517,519,521,523],{"key":20,"text":518,"correct":26},"关税完税价格＋关税＋消费税",{"key":24,"text":520,"correct":22},"离岸价格",{"key":28,"text":522,"correct":22},"关税＋消费税",{"key":31,"text":524,"correct":22},"关税完税价格",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":31,"analysis":33},90890,"某建设项目从美国进口的设备重100吨，装运港船上交货价为1000万美元，海运费为300美元／吨，海运保险费为2万美元，美元兑人民币汇率按1：7计算。该设备的到岸价格为人民币（ ）万元。",[529,531,533,535],{"key":20,"text":530,"correct":22},"7000",{"key":24,"text":532,"correct":22},"7014",{"key":28,"text":534,"correct":22},"7021",{"key":31,"text":536,"correct":26},"7035",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},90891,"下列费用中，属于建筑安装工程费用中企业管理费的是( )。",[541,542,544,545],{"key":20,"text":453,"correct":22},{"key":24,"text":543,"correct":22},"奖金",{"key":28,"text":365,"correct":22},{"key":31,"text":367,"correct":26},{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":548,"answer":31,"analysis":33},90892,[549,550,551,552],{"key":20,"text":426,"correct":22},{"key":24,"text":428,"correct":22},{"key":28,"text":430,"correct":22},{"key":31,"text":432,"correct":26},{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},90894,"按照概算法分类，建设投资由工程费用、工程建设其他费用和( )三部分组成。",[557,558,559,561],{"key":20,"text":405,"correct":26},{"key":24,"text":440,"correct":22},{"key":28,"text":560,"correct":22},"形成无形资产的费用",{"key":31,"text":562,"correct":22},"形成流动资产费用",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},90895,"某新建企业在竣工验收前，按照设计规定的工程质量标准，需对整个车间进行负荷联合试运转。其发生的费用支出大于试运转收入的亏损部分应列入( )。",[567,569,571,572],{"key":20,"text":568,"correct":22},"安装工程费",{"key":24,"text":570,"correct":26},"联合试运转费",{"key":28,"text":461,"correct":22},{"key":31,"text":573,"correct":22},"生产准备费",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},90897,"建设工程为获得土地使用权而支付的土地使用权出让金，按规定应列入( )。",[578,580,582,584],{"key":20,"text":579,"correct":26},"工程建设其他费用",{"key":24,"text":581,"correct":22},"设备工器具费用",{"key":28,"text":583,"correct":22},"建筑安装工程费用",{"key":31,"text":405,"correct":22},{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},90898,"下列进口设备交货方式中，买方风险最大的是( )。",[589,591,593,595],{"key":20,"text":590,"correct":26},"内陆交货方式",{"key":24,"text":592,"correct":22},"装运港交货方式",{"key":28,"text":594,"correct":22},"目的地交货方式",{"key":31,"text":596,"correct":22},"抵达港交货方式",[598,601,604,607,610,612],{"id":599,"name":600,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":602,"name":603,"category":7,"favorite":8},30,"经济师",{"id":605,"name":606,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":608,"name":609,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":611,"category":7,"favorite":8},"(初级)保险专业",{"id":613,"name":614,"category":7,"favorite":8},51,"(初级)财政税收"]