[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,29,50,2598,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,318,330,342,354,366,377,388,400,412,424,435,446,458,470,482,490,499,511,523,535,547,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},93072,1,"单选题","招标人在工程量清单中提供的用于支付必然发生但暂时不能确定价格的工程设备的单价，应列入（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","暂列金额",false,{"key":24,"text":25,"correct":26},"B","工程设备暂估价",true,{"key":28,"text":29,"correct":22},"C","总承包服务费",{"key":31,"text":32,"correct":22},"D","规费","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},93073,"关于工程量清单计价模式下投标报价的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"投标人的投标报价高于招标控制价的，其投标会被拒绝",{"key":24,"text":41,"correct":22},"当招标文件描述的分部分项工程量清单项目特征与设计图纸不符时，投标人应依据设计图纸重新计算分部分项工程量",{"key":28,"text":43,"correct":22},"投标人可以自行计算分部分项工程量和综合单价，在此基础上计算出总标价",{"key":31,"text":45,"correct":22},"投标人所列的综合单价中不包括任何风险费用",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},93074,"根据工程量清单计价规范，下列费用项目中，不得作为措施项目清单中竞争性费用的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"安全文明施工费",{"key":24,"text":53,"correct":22},"职工教育经费",{"key":28,"text":55,"correct":22},"工会经费",{"key":31,"text":57,"correct":22},"工程保险费",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},93075,"关于工程量清单中暂列金额的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"暂列金额用于支付必然发生但暂时不能确定价格的材料等费用",{"key":24,"text":65,"correct":26},"暂列金额应列入其他项目清单",{"key":28,"text":67,"correct":22},"专业工程暂估价应列入暂列金额",{"key":31,"text":69,"correct":22},"承包人完成发包人提出的施工图纸以外的工作费用应列入暂列金额",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},93076,"关于招标控制价的说法，正确的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"招标控制价应在招标时公布",{"key":24,"text":77,"correct":22},"招标控制价在公布后可以上调",{"key":28,"text":79,"correct":22},"招标控制价在公布后可以下浮",{"key":31,"text":81,"correct":22},"投标人的投标报价低于招标控制价时，投标应予以拒绝",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},93077,"关于建设工程承包合同价格的说法，正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"采用成本加酬金合同，发包人不承担任何价格变化的风险",{"key":24,"text":89,"correct":22},"采用单价合同时，项目综合单价不允许调整",{"key":28,"text":91,"correct":26},"对于合同工期较短、建设规模较小、技术难度较低，且施工图设计已审查完备的建设工程，可以采用总价合同",{"key":31,"text":93,"correct":22},"紧急抢险、救灾以及施工技术特别复杂的建设工程，可以采用总价合同",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},93078,"关于合同价款期中结算时工程计量的说法，正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"对因承包人原因造成返工的工程量，发包人应适当予以计量",{"key":24,"text":101,"correct":22},"对承包人超出合同工程范围完成的工程量，发包人应适当予以计量",{"key":28,"text":103,"correct":22},"发包人需独立对工程进行计量，并完成已完工程量报告",{"key":31,"text":105,"correct":26},"施工中进行工程计量，当发现招标工程量清单中出现缺项时，应按承包人在履行合同义务中完成的工程量计算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},93079,"关于工程预付款的说法，正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"包工包料工程的预付款支付比例不得高于签约合同价的20%",{"key":24,"text":113,"correct":22},"包工包料工程的预付款支付比例不得低于签约合同价的15%",{"key":28,"text":115,"correct":26},"已支付的预付款应当以抵充各期工程进度款的方式陆续扣回",{"key":31,"text":117,"correct":22},"预付款必须在工程竣工结算时一次性扣回",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},93080,"在合同履行期间，实际施工设计图纸与招标工程量清单某一项目的特征描述不符，且引起工程造价增加，应按照（ ）重新确定工程量清单项目的综合单价。",[122,124,126,128],{"key":20,"text":123,"correct":22},"招标文件中的项目特征",{"key":24,"text":125,"correct":26},"实际施工的项目特征",{"key":28,"text":127,"correct":22},"设计图纸",{"key":31,"text":129,"correct":22},"投标文件中的项目特征",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},93081,"依照《建设工程工程量清单计价规范》（GB 50500—2013）规定，包工包料工程的预付款支付比例不得低于签约合同价（扣除暂列金额）的______，不宜高于签约合同价（扣除暂列金额）的______。（ ）",[134,136,138,140],{"key":20,"text":135,"correct":22},"10%；20%",{"key":24,"text":137,"correct":22},"10%；25%",{"key":28,"text":139,"correct":26},"10%；30%",{"key":31,"text":141,"correct":22},"15%；30%",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},93082,"在工程施工过程中，由于发包方提出工程变更，导致该清单项目的工程数量发生变化超过（ ）时，应调整项目单价。",[146,148,150,152],{"key":20,"text":147,"correct":22},"10%",{"key":24,"text":149,"correct":22},"12%",{"key":28,"text":151,"correct":26},"15%",{"key":31,"text":153,"correct":22},"21%",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},93083,"施工中进行工程计量，发现招标工程量清单中出现工程量偏差，工程量按（ ）计算。",[158,160,162,164],{"key":20,"text":159,"correct":22},"招标文件中的工程量清单",{"key":24,"text":161,"correct":22},"投标报价中的工程量清单",{"key":28,"text":163,"correct":22},"工程预算书中的工程量",{"key":31,"text":165,"correct":26},"承包人在履行合同义务中完成的工程量",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},93084,"根据《建设工程工程量清单计价规范》（GB 50500—2013），招标工程合同价款调整的基准日是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"招标文件发布前28天",{"key":24,"text":173,"correct":26},"投标截止日前28天",{"key":28,"text":175,"correct":22},"招标文件发布后28天",{"key":31,"text":177,"correct":22},"投标截止日后28天",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},93085,"某工程合同履行期间，工程量清单项目的工程量增加25%。关于该工程价款调整原则的说法，正确的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"应将该清单项目全部工程量的综合单价予以调高",{"key":24,"text":185,"correct":22},"应将该清单项目部分增加的工程量的综合单价予以调高",{"key":28,"text":187,"correct":22},"应将该清单项目全部工程量的综合单价予以调低",{"key":31,"text":189,"correct":26},"应将该清单项目部分增加的工程量的综合单价予以调低",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},93086,"工程预付款的扣回方式是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"以索赔方式扣回",{"key":24,"text":197,"correct":22},"在竣工结算后协商扣回",{"key":28,"text":199,"correct":22},"在开工后28天内以抵冲进度款的方式一次性扣回",{"key":31,"text":201,"correct":26},"以抵冲各期工程进度款的方式陆续扣回",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},93087,"在合同价款结算过程中，发承包双方要根据合同约定进行工程计量。关于工程计量的说法，正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"若发现招标工程量清单中出现工程量偏差，发包人不予计量",{"key":24,"text":209,"correct":22},"工程计量应在承包人提交竣工结算文件之后进行",{"key":28,"text":211,"correct":26},"因承包人原因造成超出合同工程范围施工的工程量，发包人不予计量",{"key":31,"text":213,"correct":22},"进行工程计量后，由发包人提交当期已完工程量报告",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},93088,"某建设项目第一年计划投资额为1000万元，第二年计划投资额为500万元，建设前期年限为1年，建设期价格上涨指数为5%，则涨价预备费是（ ）万元。",[218,220,222,224],{"key":20,"text":219,"correct":26},"140.79",{"key":24,"text":221,"correct":22},"62.66",{"key":28,"text":223,"correct":22},"75.00",{"key":31,"text":225,"correct":22},"101.25",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},93089,"某工程6月份已完成工程量金额为5000万元，合同中约定采用价格指数调整法进行合同价款调整。已知定值权重为0.25。可调因子有三项，权重分别为0.15、0.35和0.25。6月份价格指数比基准日期分别增长了15%、20%和25%。则6月份工程价款调整金额是（ ）万元。",[230,232,234,236],{"key":20,"text":231,"correct":22},"662",{"key":24,"text":233,"correct":22},"750",{"key":28,"text":235,"correct":26},"775",{"key":31,"text":237,"correct":22},"1000",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},93090,"在竣工验收阶段，建设单位要对从筹建到竣工投产全过程的全部实际支出的费用进行汇总，编制（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"竣工结算",{"key":24,"text":245,"correct":22},"施工结算",{"key":28,"text":247,"correct":26},"竣工决算",{"key":31,"text":249,"correct":22},"施工图预算",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},93092,"下列房地产开发项目前期策划的内容中，不属于项目客户定位的内容是 ( )。",[254,256,258,260],{"key":20,"text":255,"correct":26},"项目设计",{"key":24,"text":257,"correct":22},"市场细分",{"key":28,"text":259,"correct":22},"目标市场选择",{"key":31,"text":261,"correct":22},"目标客户选定",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},93093,"工程项目构思策划的首要任务是根据建设意图进行工程项目的( )。",[266,268,270,272],{"key":20,"text":267,"correct":26},"定义和定位",{"key":24,"text":269,"correct":22},"功能分析",{"key":28,"text":271,"correct":22},"方案比选",{"key":31,"text":273,"correct":22},"经济评价",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},93094,"房地产开发项目前期策划的任务中，分析“为谁建”的主要任务是对项目进行客观准确的( )。",[278,280,282,284],{"key":20,"text":279,"correct":22},"价格定位",{"key":24,"text":281,"correct":22},"产品定位",{"key":28,"text":283,"correct":22},"项目定位",{"key":31,"text":285,"correct":26},"客户定位",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},93095,"在房地产前期策划中，分析固定资产投资变化对房地产市场的影响，属于( )层次的市场分析。",[290,292,294,296],{"key":20,"text":291,"correct":22},"宇观",{"key":24,"text":293,"correct":26},"宏观",{"key":28,"text":295,"correct":22},"中观",{"key":31,"text":297,"correct":22},"微观",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},93096,"当房地产开发企业或项目存在短板，但外部机会很好时，可以采用( )，扭转劣势、抓住机遇。",[302,304,306,308],{"key":20,"text":303,"correct":22},"SO战略",{"key":24,"text":305,"correct":26},"WO战略",{"key":28,"text":307,"correct":22},"ST战略",{"key":31,"text":309,"correct":22},"WT战略",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},93097,"当房地产开发项目受到外部市场环境威胁而内部状况又不好时，可以考虑采用( )。",[314,315,316,317],{"key":20,"text":303,"correct":22},{"key":24,"text":305,"correct":22},{"key":28,"text":307,"correct":22},{"key":31,"text":309,"correct":26},{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":31,"analysis":33},93098,"下列要求中，不属于在进行项目空间尺度安排时应满足的要求是()。",[322,324,326,328],{"key":20,"text":323,"correct":22},"设计规范和用地规划指标要求",{"key":24,"text":325,"correct":22},"共享性和安全性要求",{"key":28,"text":327,"correct":22},"视觉审美要求",{"key":31,"text":329,"correct":26},"环境保护要求",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},93099,"要求房地产项目内各种不同功能的道路之间有合理的比例和密度，有较好的衔接，这体现了道路交通规划的()原则。",[334,336,338,340],{"key":20,"text":335,"correct":26},"系统性",{"key":24,"text":337,"correct":22},"安全性",{"key":28,"text":339,"correct":22},"畅通性",{"key":31,"text":341,"correct":22},"节地性",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},93100,"房地产开发项目产品定位的内容中，不包括( )。",[346,348,350,352],{"key":20,"text":347,"correct":22},"功能",{"key":24,"text":349,"correct":22},"档次",{"key":28,"text":351,"correct":22},"风格",{"key":31,"text":353,"correct":26},"广告",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":31,"analysis":33},93101,"下列策划内容中，属于工程项目实施策划的是( )。",[358,360,362,364],{"key":20,"text":359,"correct":22},"项目规模策划",{"key":24,"text":361,"correct":22},"项目功能策划",{"key":28,"text":363,"correct":22},"项目定义策划",{"key":31,"text":365,"correct":26},"项目目标策划",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":28,"analysis":33},93102,"对一个具体的房地产项目进行前期策划时，必须将项目纳入房地产开发企业总体层面、区域市场层面考虑。这遵循的是前期策划的( )原则。",[370,372,374,375],{"key":20,"text":371,"correct":22},"约束性",{"key":24,"text":373,"correct":22},"差异性",{"key":28,"text":335,"correct":26},{"key":31,"text":376,"correct":22},"预测性",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},93103,"对房地产开发项目的市场价值取向进行系统分析和设计，( )属于房地产开发项目前期策划的核心。",[381,383,385,387],{"key":20,"text":382,"correct":22},"环境分析",{"key":24,"text":384,"correct":26},"市场定位",{"key":28,"text":386,"correct":22},"运行建议",{"key":31,"text":273,"correct":22},{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":31,"analysis":33},93104,"在房地产开发项目前期策划中，房地产市场需求预期研判的重点是对潜在需求中的( )进行分析和预测。",[392,394,396,398],{"key":20,"text":393,"correct":22},"刚性需求",{"key":24,"text":395,"correct":22},"理性需求",{"key":28,"text":397,"correct":22},"总量需求",{"key":31,"text":399,"correct":26},"有效需求",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":28,"analysis":33},93105,"工程项目构思策划中，需要通过项目定位策划确定工程项目的()",[404,406,408,410],{"key":20,"text":405,"correct":22},"系统框架",{"key":24,"text":407,"correct":22},"系统组成",{"key":28,"text":409,"correct":26},"建设规模和水准",{"key":31,"text":411,"correct":22},"用途和性质",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":28,"analysis":33},93106,"工程项目构思策划需要完成的工作内容是( )。",[416,418,420,422],{"key":20,"text":417,"correct":22},"制定应急预案",{"key":24,"text":419,"correct":22},"比选项目融资方案",{"key":28,"text":421,"correct":26},"描述项目系统的总体功能",{"key":31,"text":423,"correct":22},"确定项目实施组织",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},93107,"在房地产项目前期策划中，分析“建什么”是解决()问题。",[428,429,431,433],{"key":20,"text":285,"correct":22},{"key":24,"text":430,"correct":26},"项目定位和产品定位",{"key":28,"text":432,"correct":22},"项目可行性的评价",{"key":31,"text":434,"correct":22},"项目总体运行",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},93108,"解决建设资金来源，控制资金使用成本，从而控制工程造价、降低工程风险所不可忽视的环节是()。",[439,441,443,444],{"key":20,"text":440,"correct":22},"项目组织策划",{"key":24,"text":442,"correct":26},"融资方案策划",{"key":28,"text":365,"correct":22},{"key":31,"text":445,"correct":22},"实施过程策划",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":24,"analysis":33},93109,"在进行房地产产品定位时，可以运用菲利普科特勒的产品三层次结构理论，将房地产产品看成由( )三个层次组成的复合体。",[450,452,454,456],{"key":20,"text":451,"correct":22},"品牌产品、实物产品和附加产品",{"key":24,"text":453,"correct":26},"核心产品、有形产品和附加产品",{"key":28,"text":455,"correct":22},"有形产品、无形产品和附加产品",{"key":31,"text":457,"correct":22},"品牌产品、核心产品和有形产品",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},93110,"将投资建设意图转换为定义明确、系统清晰、目标具体且具有策略性运作思路的高智力系统活动，称为（）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"工程项目投资",{"key":24,"text":465,"correct":26},"工程项目策划",{"key":28,"text":467,"correct":22},"工程项目设计",{"key":31,"text":469,"correct":22},"工程项目实施",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":31,"analysis":33},93111,"下列关于工程项目目标系统的说法，错误的是（）。",[474,476,478,480],{"key":20,"text":475,"correct":22},"工程项目三大目标是质量、投资和进度",{"key":24,"text":477,"correct":22},"工程项目目标系统的策划，是工程建设实施过程动态控制的前提",{"key":28,"text":479,"correct":22},"三大目标之间存在相互制约的关系",{"key":31,"text":481,"correct":26},"力求建设质量髙、投资省、工期短的项目",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":31,"analysis":33},93112,"下列不属于房地产开发项目市场定位的是()。",[486,487,488,489],{"key":20,"text":285,"correct":22},{"key":24,"text":283,"correct":22},{"key":28,"text":281,"correct":22},{"key":31,"text":279,"correct":26},{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},93113,"（ ）是以房地产需求者消费需求的某些特征或变量为依据 ，对具有不同需求的房地产消费群体进行区分的过程。",[494,495,496,497],{"key":20,"text":285,"correct":22},{"key":24,"text":257,"correct":26},{"key":28,"text":259,"correct":22},{"key":31,"text":498,"correct":22},"客户选定",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},93114,"在工程项目投资决策阶段进行的总体性策划活动指的是（ ）",[503,505,507,509],{"key":20,"text":504,"correct":26},"工程项目构思策划",{"key":24,"text":506,"correct":22},"工程项目设计策划",{"key":28,"text":508,"correct":22},"工程项目初步策划",{"key":31,"text":510,"correct":22},"工程项目实施策划",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},93115,"关于房地产开发项目前期策划的主要任务说法错误的是（ ）",[515,517,519,521],{"key":20,"text":516,"correct":26},"“建什么？ ” 是解决项目客户定位问题",{"key":24,"text":518,"correct":22},"“为谁建？ ”是解决项目客户定位问题。",{"key":28,"text":520,"correct":22},"“能否建？ ”是对项目可行性的评价。",{"key":31,"text":522,"correct":22},"“怎么建？ ”是解决项目总体运行问题。",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":20,"analysis":33},93116,"工程项目的可行性研究主要在( )来进行。",[527,529,531,533],{"key":20,"text":528,"correct":26},"投资决策前",{"key":24,"text":530,"correct":22},"投资决策后",{"key":28,"text":532,"correct":22},"初步设计",{"key":31,"text":534,"correct":22},"建设施工",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},93117,"在工程项目可行性研究的项目评估决策阶段，项目评估的主要任务是( )。",[539,541,543,545],{"key":20,"text":540,"correct":22},"对拟建项目进行财务评价",{"key":24,"text":542,"correct":22},"对拟建项目进行国民经济评价",{"key":28,"text":544,"correct":26},"对拟建项目的可行性研究报告提出评价意见",{"key":31,"text":546,"correct":22},"对拟建项目的立项报告提出评价意见",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},93118,"国民经济评价是在合理配置社会资源的前提下，从( )的角度计算项目对国民经济的贡献、效益和影响，从而评价项目在宏观经济上的合理性。",[551,553,555,557],{"key":20,"text":552,"correct":22},"项目",{"key":24,"text":554,"correct":26},"国家经济整体利益",{"key":28,"text":556,"correct":22},"环境保护与利用",{"key":31,"text":558,"correct":22},"自然资源的合理性开发",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},93119,"下列关于社会折现率的说法，错误的是( )。",[563,565,567,569],{"key":20,"text":564,"correct":22},"国民经济评价采用的是社会折现率",{"key":24,"text":566,"correct":22},"社会折现率在工程项目国民经济评价中可作为项目费用效益的折算率",{"key":28,"text":568,"correct":22},"社会折现率在工程项目国民经济评价中可作为项目经济效益要求的最低经济收益率",{"key":31,"text":570,"correct":26},"社会折现率可根据项目的具体情况酌情确定",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":28,"analysis":33},93120,"影子价格是进行项目( )专用的计算价格。",[575,577,579,581],{"key":20,"text":576,"correct":22},"资源分析",{"key":24,"text":578,"correct":22},"财务分析",{"key":28,"text":580,"correct":26},"国民经济评价",{"key":31,"text":582,"correct":22},"风险分析",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":31,"analysis":33},93121,"在进行建设项目国民经济评价时，采用的折现率是( )。",[587,589,591,593],{"key":20,"text":588,"correct":22},"行业折现率",{"key":24,"text":590,"correct":22},"外部收益率",{"key":28,"text":592,"correct":22},"资金成本率",{"key":31,"text":594,"correct":26},"社会折现率",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},93122,"房地产开发标准厂房项目，涉及环境敏感区及需自建配套污水处理设施的，应当编制( )。",[599,601,603,605],{"key":20,"text":600,"correct":22},"环境影响报告书",{"key":24,"text":602,"correct":26},"环境影响报告表",{"key":28,"text":604,"correct":22},"环境影响登记表",{"key":31,"text":606,"correct":22},"环境影响数据表",[608,611,614,617,620,622],{"id":609,"name":610,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":612,"name":613,"category":7,"favorite":8},30,"经济师",{"id":615,"name":616,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":618,"name":619,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":621,"category":7,"favorite":8},"(初级)保险专业",{"id":623,"name":624,"category":7,"favorite":8},51,"(初级)财政税收"]