[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-27":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,27,50,2598,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,188,200,210,222,234,246,258,270,282,293,305,316,328,340,352,364,376,387,399,411,423,432,444,456,467,479,491,503,515,527,536,547,559,570,582,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},92972,1,"单选题","某进口设备采用运费在内价(CFR)形式，在该价格中包含的费用是（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","出口国装运港至进口国目的港之间的运输保险费",false,{"key":24,"text":25,"correct":22},"B","进口国国内运费、装卸费",{"key":27,"text":28,"correct":22},"C","进口国国内运输保险费",{"key":30,"text":31,"correct":32},"D","出口国装运港至进口国目的港之间的海运费",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},92973,"分部分项工程量清单的要件是项目编码、项目名称、计量单位、工程量和（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"综合单价",{"key":24,"text":41,"correct":32},"项目特征",{"key":27,"text":43,"correct":22},"定额编号",{"key":30,"text":45,"correct":22},"工料机消耗量",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},92974,"某建设项目的建设期为2年，每年的贷款额预计均为600万元，货款年利率8％，则应计入建设工程造价的建设期利息是（）万元",[50,52,54,56],{"key":20,"text":51,"correct":22},"24．OO",{"key":24,"text":53,"correct":22},"48．00",{"key":27,"text":55,"correct":22},"73．92",{"key":30,"text":57,"correct":32},"97．92",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},92975,"某新建企业在竣工验收前，按照设计规定的工程质量标准，需对整个车间进行负荷联试运转。其发生的费用支出大于试运转收入的亏损部分应列入（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"安装工程费",{"key":24,"text":65,"correct":32},"联合试运转费",{"key":27,"text":67,"correct":22},"设备购置费",{"key":30,"text":69,"correct":22},"生产准备费",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},92976,"联合试运转费是指整个车间的负荷联合试运转发生的费用支出大于试运转收入的亏损部分，下列选项中属于联合试运转费的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"无负荷联合试运转中的试车费用",{"key":24,"text":77,"correct":22},"安装费用开支的单台设备调试费",{"key":27,"text":79,"correct":32},"安装单位参加联合试运转人员的工资",{"key":30,"text":81,"correct":22},"试运转产品销售收入和其他收入",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},92977,"措施项目是指为完成工程项目施工、发生于该工程施工准备和施工过程中的（）项目。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工程暂列",{"key":24,"text":89,"correct":22},"工程实体",{"key":27,"text":91,"correct":32},"非工程实体",{"key":30,"text":93,"correct":22},"分部分项工程",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},92978,"暂列金额是指招标人在工程量清单中暂列并包括在合同价款中的款项，在工程量清单中应列入（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"措施项目清单",{"key":24,"text":101,"correct":22},"分部分项工程量清单",{"key":27,"text":103,"correct":22},"规费项目清单",{"key":30,"text":105,"correct":32},"其他项目清单",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},92979,"人工工资单价是指一个建筑安装工人（）工作日在预算中应计人的全部人工费用。",[110,112,114,116],{"key":20,"text":111,"correct":32},"一个",{"key":24,"text":113,"correct":22},"基准",{"key":27,"text":115,"correct":22},"若干",{"key":30,"text":117,"correct":22},"十个",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},92980,"根据《建设工程工程量清单计价规范》(GB 50500--2013)，下列关于分部分项工程量清单的说法正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"分部分项工程量清单的项目编码应采用9位阿拉伯数字表示",{"key":24,"text":125,"correct":32},"同一招标工程的项目编码不得有重复",{"key":27,"text":127,"correct":22},"分部分项工程量清单的项目名称可由编制者根据需要自行拟定",{"key":30,"text":129,"correct":22},"分部分项工程量清单中所列工程量的有效位数均应保留小数点两位",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":30,"analysis":33},92981,"依照《建设工程工程量清单计价规范》(GB 50500--2013)规定，以下关于工程量清单的说法正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"工程量清单必须委托中介机构编制",{"key":24,"text":137,"correct":22},"措施项目清单列项内容主要包括暂列金额和零星工作项目费",{"key":27,"text":139,"correct":22},"其他项目清单列项内容主要包括利润和税金",{"key":30,"text":141,"correct":32},"工程量清单是招标文件的组成部分",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},92982,"某工程建设期为2年，第1年从银行贷款1 000万元，贷款年利率为8％；第2年无贷款，则建设期利息为（）万元。",[146,148,150,152],{"key":20,"text":147,"correct":22},"40．0",{"key":24,"text":149,"correct":22},"80．O",{"key":27,"text":151,"correct":22},"83．2",{"key":30,"text":153,"correct":32},"123．2",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},92983,"按照住房和城乡建设部财务部2013年7月实施的《建筑安装工程费用项目组成》(建标[2013]44号)的规定，下列费用中，不属于建筑安装工程费的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"工程排污费",{"key":24,"text":161,"correct":22},"仪器仪表使用费",{"key":27,"text":163,"correct":32},"土地使用费",{"key":30,"text":165,"correct":22},"工会经费",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":27,"analysis":33},92984,"下列不属于建筑安装工程费中措施项目费的有（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"冬雨季施工增加费",{"key":24,"text":173,"correct":22},"工程定位复测费",{"key":27,"text":175,"correct":32},"总承包服务费",{"key":30,"text":177,"correct":22},"已完工程及设备保护费",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},92985,"下列费用中，属于建筑安装工程措施费的是（）。",[182,183,185,187],{"key":20,"text":165,"correct":22},{"key":24,"text":184,"correct":32},"脚手架费",{"key":27,"text":186,"correct":22},"施工机械使用费",{"key":30,"text":159,"correct":22},{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":30,"analysis":33},92986,"在建筑安装工程费中，脚手架搭、拆、运输费用应列入（）。",[192,194,196,198],{"key":20,"text":193,"correct":22},"直接工程费",{"key":24,"text":195,"correct":22},"企业管理费",{"key":27,"text":197,"correct":22},"规费",{"key":30,"text":199,"correct":32},"措施项目费",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},92987,"根据《建筑安装工程费用项目组成》(建标[2013]44号)的费用构成要素划分，施工企业按职工工资的规定比例计提的职工教育经费应列入（）。",[204,205,207,208],{"key":20,"text":195,"correct":32},{"key":24,"text":206,"correct":22},"人工费",{"key":27,"text":197,"correct":22},{"key":30,"text":209,"correct":22},"建设单位管理费",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":20,"analysis":33},92988,"项目实施时可能发生的难以预料的支出和需要预留的费用，应列入建设工程造价的（）。",[214,216,218,220],{"key":20,"text":215,"correct":32},"基本预备费",{"key":24,"text":217,"correct":22},"建设单位开办费",{"key":27,"text":219,"correct":22},"工程费用",{"key":30,"text":221,"correct":22},"涨价预备费",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":27,"analysis":33},92989,"某生产性建设项目，建设期为3年，共向银行贷款1300万元。贷款情况为：第一年，300万元；第二年，600万元；第三年，400万元。年利率为6％，则建设期利息为（）万元。",[226,228,230,232],{"key":20,"text":227,"correct":22},"110．34",{"key":24,"text":229,"correct":22},"113．69",{"key":27,"text":231,"correct":32},"114．27",{"key":30,"text":233,"correct":22},"115．72",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":30,"analysis":33},92990,"某建设项目第一年计划投资额为1 000万元，第二年计划投资额为500万元，建设期价格上涨指数为5％，则涨价预备费是（）万元。",[238,240,242,244],{"key":20,"text":239,"correct":22},"50．00",{"key":24,"text":241,"correct":22},"51．25",{"key":27,"text":243,"correct":22},"75．00",{"key":30,"text":245,"correct":32},"101．25",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},92991,"关于分部分项工程量清单的说法，正确的是（）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"分部分项工程量清单的项目编码由10位阿拉伯数字表示",{"key":24,"text":253,"correct":32},"项目编码是指分部分项工程量清单项目名称的数字标识",{"key":27,"text":255,"correct":22},"招标人在编制分部分项工程量清单时，必须载明项目的综合单价",{"key":30,"text":257,"correct":22},"分部分项工程量清单中需要对项目特征进行简要的描述",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":30,"analysis":33},92992,"关于工程量清单的说法，正确的是（）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"工程量清单必须由招标人编制",{"key":24,"text":265,"correct":22},"工程量清单必须由投标人编制",{"key":27,"text":267,"correct":22},"工程量清单必须委托有资质的工程造价咨询人编制",{"key":30,"text":269,"correct":32},"采用清单工程量招标中，必须将工程量清单作为招标文件的组成部分",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":30,"analysis":33},92993,"分部分项工程量清单的项目编码采用12位阿拉伯数字表示，其中第10～12位表示的为（）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"工程分类顺序码",{"key":24,"text":277,"correct":22},"分部工程顺序码",{"key":27,"text":279,"correct":22},"分项工程名称顺序码",{"key":30,"text":281,"correct":32},"清单项目名称顺序码",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},92994,"下列费用中．不应列入工程量清单中其他项目清单的是（）。",[286,288,290,291],{"key":20,"text":287,"correct":22},"专业工程暂估价",{"key":24,"text":289,"correct":32},"安全文明施工费",{"key":27,"text":175,"correct":22},{"key":30,"text":292,"correct":22},"暂列金额",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":30,"analysis":33},92995,"相对于工程实体而言，对实际施工中必须发生的施工准备和施工过程中技术、生活、安全、环境保护等方面的非工程实体项目的总称是（）。",[297,299,301,303],{"key":20,"text":298,"correct":22},"其他项目",{"key":24,"text":300,"correct":22},"分部分项工程项目",{"key":27,"text":302,"correct":22},"规费项目",{"key":30,"text":304,"correct":32},"措施项目",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},92996,"概算定额的项目划分对象是（）。",[309,310,312,314],{"key":20,"text":93,"correct":22},{"key":24,"text":311,"correct":32},"扩大分部分项工程",{"key":27,"text":313,"correct":22},"单位工程",{"key":30,"text":315,"correct":22},"扩大单位工程",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":30,"analysis":33},92997,"采用不可调值总价合同时，由发包方承担的是（）风险。",[320,322,324,326],{"key":20,"text":321,"correct":22},"施工质量不良",{"key":24,"text":323,"correct":22},"地质条件不利",{"key":27,"text":325,"correct":22},"通货膨胀",{"key":30,"text":327,"correct":32},"设计和工程范围变更",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},92998,"某项目采用生产能力指数法估算拟建装置的投资。已建成类似装置的投资额为200万元，生产能力为20万吨；拟建装置的生产能力为25万吨。指数n的取值为1，综合调整系数为1．20，该拟建装置的投资估算额是（）万元。",[332,334,336,338],{"key":20,"text":333,"correct":22},"250",{"key":24,"text":335,"correct":32},"300",{"key":27,"text":337,"correct":22},"400",{"key":30,"text":339,"correct":22},"450",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":30,"analysis":33},92999,"关于运用生产能力指数法进行建设投资估算的说法正确的是（）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"建设投资需要根据已建成的同类项目或装置中各项费用所占百分比进行估算",{"key":24,"text":347,"correct":22},"生产能力指数n大于等于1",{"key":27,"text":349,"correct":22},"生产能力指数法是准确度最高的投资估算方法",{"key":30,"text":351,"correct":32},"若拟建项目或装置与类似项目或装置的生产规模比值在0．5～2．则其生产能力指数n的取值近似为1",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},93000,"下列建设工程计价方法中，属于建筑单位工程概算编制方法的是（）。",[356,358,360,362],{"key":20,"text":357,"correct":32},"类似工程预决算法",{"key":24,"text":359,"correct":22},"实物法",{"key":27,"text":361,"correct":22},"分项详细估算法",{"key":30,"text":363,"correct":22},"资金周转率法",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},93001,"根据《建设工程工程量清单计价规范》，关于建设工程工程量清单计价的说法，错误的是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"全部使用国有资金投资或国有资金投资为主的建设工程施工发承包，必须采用工程量清单计价",{"key":24,"text":371,"correct":32},"非国有资金投资的工程建设项目，不应采用工程量清单方式计价",{"key":27,"text":373,"correct":22},"分部分项工程量清单采用综合单价方式计价",{"key":30,"text":375,"correct":22},"实行工程量清单招标时，工程量清单应由具有编制能力的招标人或受其委托的具有相应资质的工程造价咨询人编制。",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},93002,"根建《建设工程工程量清单计价规范》，分部分项工程量清单的综合单价不应包括（ ）。",[380,381,383,385],{"key":20,"text":195,"correct":22},{"key":24,"text":382,"correct":32},"税金",{"key":27,"text":384,"correct":22},"风险费用",{"key":30,"text":386,"correct":22},"利润",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":30,"analysis":33},93003,"按照《建设工程工程量清单计价规范》规定，措施项目清单计价（ ）。",[391,393,395,397],{"key":20,"text":392,"correct":22},"应采用综合单价计价",{"key":24,"text":394,"correct":22},"应由招标人根据企业情况自行报价",{"key":27,"text":396,"correct":22},"应来用工料单价计价",{"key":30,"text":398,"correct":32},"应根据拟建工程的施工组织设计确定",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":20,"analysis":33},93004,"用资金周转率法估算某项目建设投资，已知该项目资金周转率的近似值为1．5，项目生产期产品的年产量为600万吨，产品价格为80元\u002F吨，该项目总投资估计应为（）万元。",[403,405,407,409],{"key":20,"text":404,"correct":32},"32000",{"key":24,"text":406,"correct":22},"36000",{"key":27,"text":408,"correct":22},"45000",{"key":30,"text":410,"correct":22},"72000",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":24,"analysis":33},93005,"编制施工图预算是确定建筑安装工程预算造价的文件。如果编制某单位工程施工图预算时，先根据地区统一单位估价表中的各分项定价，乘以相应的工程量并相加,得到单位工程的人工费、材料费和机械使用费之和，再加上措施费、间接费、利润和税金，汇总求和。这种编制预算的方法是（）。",[415,417,419,421],{"key":20,"text":416,"correct":22},"综合单价法",{"key":24,"text":418,"correct":32},"工料单价法",{"key":27,"text":420,"correct":22},"实物单价法",{"key":30,"text":422,"correct":22},"全费用单价法",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},93006,"根据《建设工程工程量清单计价规范》(GB50500--2013)，关于建设工程工程量清单计价的说法错误的是（）。",[427,428,429,430],{"key":20,"text":369,"correct":22},{"key":24,"text":371,"correct":32},{"key":27,"text":373,"correct":22},{"key":30,"text":431,"correct":22},"实行工程量清单招标时，工程量清单应由具有编制能力的招标人或受其委托的具有相应资质的工程造价咨询人编制",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":27,"analysis":33},93007,"工程变更引起已标价工程量清单项目或其工程数量发生变化，关于应依据的调整规定中错误的是（）。",[436,438,440,442],{"key":20,"text":437,"correct":22},"已标价工程量清单中有适用于变更工程项目的，采用该项目的单价",{"key":24,"text":439,"correct":22},"已标价工程量清单中没有适用，但有类似于变更工程项目的，可在合理范围内参照类似项目的单价",{"key":27,"text":441,"correct":32},"已标价工程量清单中没有适用也没有类似于变更工程项目的，由发包人根据变更工程资料、计量规则和计价办法、工程造价管理机构发布的信息价格和承包人报价浮 动率提出变更工程项目的单价，并报承包人确认后调整",{"key":30,"text":443,"correct":22},"已标价工程量清单中没有适用也没有类似于变更工程项目，且工程造价管理机构发布的信息价格缺价的，由承包人提出变更工程项目的单价，并报发包人确认后调整",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":27,"analysis":33},93008,"假定某一建筑承包工程的结算价款总额为2000万元，预付备料款占价款的25％，主要材料和结构件金额占工程价款的62．5％。按照理论扣回方式，预付备料款起扣点是（）万元。",[448,450,452,454],{"key":20,"text":449,"correct":22},"500",{"key":24,"text":451,"correct":22},"800",{"key":27,"text":453,"correct":32},"1200",{"key":30,"text":455,"correct":22},"1500",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},93009,"建设工程的可调值总价合同与不可调值总价合同的区别在于，发包方承担了（） 的风险。",[460,461,463,465],{"key":20,"text":325,"correct":32},{"key":24,"text":462,"correct":22},"生产条件恶劣",{"key":27,"text":464,"correct":22},"气候条件恶化",{"key":30,"text":466,"correct":22},"其他意外",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":30,"analysis":33},93010,"在工程量清单计价模式下，关于投标人编制其他项目费报价的说法，正确的是（）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"暂列金额应由投标人根据实际情况自主确定",{"key":24,"text":474,"correct":22},"材料暂估价应由投标人根据实际情况自主确定",{"key":27,"text":476,"correct":22},"专业工程暂估价应由投标人根据施工组织设计或施工方案自主确定",{"key":30,"text":478,"correct":32},"总承包服务费应由投标人根据招标文件中列出的内容和提出的要求自主确定",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},93011,"根据《建设工程工程量清单计价规范》(GB50500--2013)，关于确定因非承包人引起工程量增减的综合单价的说法，正确的是（）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"因合同中已有适用的综合单价，故应继续按合同中已有的综合单价执行",{"key":24,"text":486,"correct":22},"必须由承包人提出新的综合单价．经发包人确认后执行",{"key":27,"text":488,"correct":32},"若该工程量的变化在合同约定幅度以内．应执行原有的综合单价",{"key":30,"text":490,"correct":22},"若该项工程量变化在合同约定幅度以外．其综合单价应予以调整．但措施费不能调整",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":30,"analysis":33},93012,"下列工程施工过程发生的事件中，属于对合同款不予调整的是（）。",[495,497,499,501],{"key":20,"text":496,"correct":22},"招标T程量清单项目特征描述与图纸不符引起工程量增加",{"key":24,"text":498,"correct":22},"工程量清单缺项引起工程量增加",{"key":27,"text":500,"correct":22},"招标人提出的工程变更引起措施项目发生变化",{"key":30,"text":502,"correct":32},"因承包人导致工期延误，在原定竣丁时间后税收政策调整引起合同价款增加",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":30,"analysis":33},93013,"在采用成本加酬金合同价时，为了有效地控制工程投资，并能鼓励承包商最大限度地降低工程成本，最好采用（）确定的合同价。",[507,509,511,513],{"key":20,"text":508,"correct":22},"成本加奖罚",{"key":24,"text":510,"correct":22},"成本加固定百分比酬金",{"key":27,"text":512,"correct":22},"成本加固定金额酬金",{"key":30,"text":514,"correct":32},"最高限额成本加固定最大酬金",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":27,"analysis":33},93014,"招标工程以投标截止日前（）天，非招标工程以合同签订前（）天为基准日，其后国家的法律、法规、规章和政策发生变化引起工程造价增减变化的，发承包双方应按照省级或行业建设主管部门或其授权的工程造价管理机构据此发布的规定调整合同价款。",[519,521,523,525],{"key":20,"text":520,"correct":22},"28，14",{"key":24,"text":522,"correct":22},"14，7",{"key":27,"text":524,"correct":32},"28，28",{"key":30,"text":526,"correct":22},"42，42",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":30,"analysis":33},93015,"按照《建设工程工程量清单计价规范》(GB50500---2013)规定，措施项目清单计价（）。",[531,532,533,535],{"key":20,"text":392,"correct":22},{"key":24,"text":394,"correct":22},{"key":27,"text":534,"correct":22},"应采用工料单价计价",{"key":30,"text":398,"correct":32},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},93016,"实践中，绝大多数工程索赔采用（）计算索赔费用。",[540,541,543,545],{"key":20,"text":359,"correct":22},{"key":24,"text":542,"correct":32},"分项法",{"key":27,"text":544,"correct":22},"总费用法",{"key":30,"text":546,"correct":22},"修正的总费用法",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},93017,"某工程合同价的确定方式为：发包方不需对工程量做出任何规定，承包方在投标时只需按发包方给出的分部分项工程项目及工程范围做出报价，而工程量则按实际完成的数量结算。这种合同属于（）。",[551,553,555,557],{"key":20,"text":552,"correct":32},"纯单价合同",{"key":24,"text":554,"correct":22},"可调工程量单价合同",{"key":27,"text":556,"correct":22},"不可调值单价合同",{"key":30,"text":558,"correct":22},"可调值总价合同",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},93018,"具有设计任务书和总体设计，经济上实行独立核算，行政上具有独立组织形式的工程称为（）。",[563,565,566,568],{"key":20,"text":564,"correct":32},"建设项目",{"key":24,"text":313,"correct":22},{"key":27,"text":567,"correct":22},"单项工程",{"key":30,"text":569,"correct":22},"分项工程",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":27,"analysis":33},93019,"在工程量清单计价模式下，关于确定分部分项工程项目综合单价的说法，错误的是（）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"若分部分项工程量项目特征的描述与设计图纸不符，投标人应按分部分项工程量项目特征的描述确定综合单价",{"key":24,"text":577,"correct":22},"综合单价中需考虑招标文件中要求投标人承担的风险费用",{"key":27,"text":579,"correct":32},"综合单价中应考虑招标人和投标人共同承担的所有风险费用",{"key":30,"text":581,"correct":22},"招标文件中提供了暂估单价的材料，应按暂估单价计入综合单价",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},93020,"根据《建设工程量清单计价规范》(GB50500--2013)，分部分项工程量清单的综合单价不应包括（）。",[586,587,588,589],{"key":20,"text":195,"correct":22},{"key":24,"text":382,"correct":32},{"key":27,"text":384,"correct":22},{"key":30,"text":386,"correct":22},{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":30,"analysis":33},93021,"关于分部分项工程量清单计价的说法，正确的是（）。",[594,596,598,600],{"key":20,"text":595,"correct":22},"分部分项工程量清单应采用工料单价法计价",{"key":24,"text":597,"correct":22},"补充项目的编码由顺序码加表示补充项目的字母8．再加上2位阿拉伯数字组成",{"key":27,"text":599,"correct":22},"在分部分项工程量清单计价表中应填写单价与合价。中标后合价即为最终合同价",{"key":30,"text":601,"correct":32},"当招标文件描述的分部分项工程量清单项目特征与设计图纸不符时，投标人应以招标文件描述的分部分项工程量清单项目特征确定其报价",[603,606,609,612,615,617],{"id":604,"name":605,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":607,"name":608,"category":7,"favorite":8},30,"经济师",{"id":610,"name":611,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":613,"name":614,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":616,"category":7,"favorite":8},"(初级)保险专业",{"id":618,"name":619,"category":7,"favorite":8},51,"(初级)财政税收"]