[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,26,50,2598,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,213,225,237,249,261,273,285,296,308,320,328,337,349,361,372,384,396,407,419,431,443,455,467,479,491,503,514,526,536,547,557,569,579,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},92921,1,"单选题","在工程施工过程中，由于发包方提出工程变更，导致该清单项目的工程数量发生变化超过( )时，应调整项目单价。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","10％",false,{"key":24,"text":25,"correct":22},"B","12％",{"key":27,"text":28,"correct":29},"C","15％",true,{"key":31,"text":32,"correct":22},"D","21％","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},92922,"合同履行期间如出现工程量偏差，当工程量减少15％以上时，下列关于合同价款调整的说法正确的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"所有的工程量综合单价都应调低",{"key":24,"text":41,"correct":22},"减少后剩余部分的工程量综合单价应予调低",{"key":27,"text":43,"correct":29},"减少后剩余部分的工程量综合单价应予调高",{"key":31,"text":45,"correct":22},"所有的工程量综合单价都应调高",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},92923,"工程量清单计价应采用综合单价法，综合单价不包括( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"人工费",{"key":24,"text":53,"correct":22},"企业管理费",{"key":27,"text":55,"correct":22},"利润",{"key":31,"text":57,"correct":29},"税金",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},92924,"分部分项工程量清单的要件是项目编码、项目名称、项目特征、计量单位和( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"工作内容",{"key":24,"text":65,"correct":29},"工程量",{"key":27,"text":67,"correct":22},"综合单价",{"key":31,"text":69,"correct":22},"工料机消耗量",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},92925,"下列内容不属于规费项目清单的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"社会保险费",{"key":24,"text":77,"correct":22},"住房公积金",{"key":27,"text":79,"correct":22},"工程排污费",{"key":31,"text":81,"correct":29},"暂列金额",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},92926,"招标控制价是招标人根据国家或省级、行业建设主管部门颁发的有关计价依据和办法，以及拟定的招标文件和招标工程量清单，结合工程具体情况编制的招标工程的( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"最低投标限价",{"key":24,"text":89,"correct":29},"最高投标限价",{"key":27,"text":91,"correct":22},"投标参考价",{"key":31,"text":93,"correct":22},"评价参考价",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},92927,"下列关于招标控制价的说法，正确的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"招标人设有最高投标限价的，最高投标限价应保密",{"key":24,"text":101,"correct":29},"国有资金投资工程建设项目实行工程量清单招标，招标人必须编制招标控制价",{"key":27,"text":103,"correct":22},"招标控制价按照计价规范的规定编制，可以随意上调或下浮",{"key":31,"text":105,"correct":22},"招标控制价由分部分项工程费、措施项目费、其他项目费、规费四部分组成",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},92928,"关于工程量清单的说法，正确的是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"工程量清单计价应采用工料单价法",{"key":24,"text":113,"correct":29},"招标工程量清单是工程量清单计价的基础",{"key":27,"text":115,"correct":22},"招标工程量清单由分部分项工程项目清单、措施项目清单、其他项目清单组成",{"key":31,"text":117,"correct":22},"招标工程量清单应以整个建设项目为单位编制",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},92929,"（ ）是指为完成工程项目施工，发生于该工程施工准备和施工过程中的技术、生活、安全、环境保护等方面的项目。",[122,124,126,128],{"key":20,"text":123,"correct":29},"措施项目",{"key":24,"text":125,"correct":22},"分部工程项目",{"key":27,"text":127,"correct":22},"分项工程项目",{"key":31,"text":129,"correct":22},"其他项目",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},92930,"下列关于投标报价的编制说法错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"暂列金额应按招标工程量清单中列出的金额填写",{"key":24,"text":137,"correct":29},"安全文明施工费可以自主确定",{"key":27,"text":139,"correct":22},"暂估价中的材料、工程设备暂估价应按招标工程量清单中列出的单价计人综合单价",{"key":31,"text":141,"correct":22},"规费和税金应按照国家或省级、行业建设主管部门的有关规定计算",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},92931,"紧急抢险、救灾以及施工技术特别复杂的建设工程适合采用（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"纯单价合同",{"key":24,"text":149,"correct":29},"成本加酬金合同",{"key":27,"text":151,"correct":22},"可调值总价合同",{"key":31,"text":153,"correct":22},"不可调值总价合同",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},92932,"发承包双方在合同条款可以不进行约定的是（ ）",[158,160,162,164],{"key":20,"text":159,"correct":22},"预付工程款的数额",{"key":24,"text":161,"correct":22},"工程价款的调整因素",{"key":27,"text":163,"correct":29},"违约责任的界定",{"key":31,"text":165,"correct":22},"工程质量保证（保修）金的数额",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},92933,"下列关于招标控制价说法错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":29},"招标控制价是编制的招标工程的最低投标限价",{"key":24,"text":173,"correct":22},"国有资金投资的工程建设项目应实行工程量清单招标，招标人必须编制招标控制价",{"key":27,"text":175,"correct":22},"招标控制价由分部分项工程费、措施项目费、其他项目费、规费和税金组成",{"key":31,"text":135,"correct":22},{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},92934,"根据《建设工程工程量清单计价规范》(GB 50500---2013)，关于设计变更分部分项工程费的调整规定的说法，不正确的是( )。",[181,183,185,187],{"key":20,"text":182,"correct":22},"已标价工程量清单中有适用于变更工程项目的，采用该项目的单价",{"key":24,"text":184,"correct":22},"工程变更导致该清单项目的工程数量发生变化超过15％时，应调整项目单价",{"key":27,"text":186,"correct":22},"已标价工程量清单中没有适用但有类似于变更工程项目的，可在合理范围内参照类似项目的单价",{"key":31,"text":188,"correct":29},"已标价工程量清单中没有适用也没有类似于变更工程项目的，由发包人确定该项目的单价",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},92935,"某工程9月份已完成工程量金额为7000万元，合同中约定采用价格指数调整法进行合同价款调整。已知定值权重为0．20。可调因子有三项，权重分别为0．20、0．35和0．25。9月份价格指数比基准日期分别增长了16％、18％和25％。则9月份工程价款调整金额是( )万元。",[193,195,197,199],{"key":20,"text":194,"correct":22},"662",{"key":24,"text":196,"correct":22},"750",{"key":27,"text":198,"correct":29},"1102．5",{"key":31,"text":200,"correct":22},"2502．5",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},92936,"以下关于提前竣工说法正确的是( )。",[205,207,209,211],{"key":20,"text":206,"correct":22},"是否提前竣工由承包人决定",{"key":24,"text":208,"correct":29},"提前竣工由发包人提出，并经承包人同意",{"key":27,"text":210,"correct":22},"提前竣工导致的增加费用应列入合同文件中",{"key":31,"text":212,"correct":22},"压缩工期不得超过额定工期的10％",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},92937,"在合同约定的缺陷责任期终止后的( )天内，发包人应将剩余的质量保证金返还给承包人。",[217,219,221,223],{"key":20,"text":218,"correct":22},"7",{"key":24,"text":220,"correct":29},"14",{"key":27,"text":222,"correct":22},"15",{"key":31,"text":224,"correct":22},"28",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},92938,"发包人应在工程开工后的28天内预付不低于当年施工进度计划的安全文明施工费总额的( )。",[229,231,233,235],{"key":20,"text":230,"correct":22},"20％",{"key":24,"text":232,"correct":22},"30％",{"key":27,"text":234,"correct":22},"50％",{"key":31,"text":236,"correct":29},"60％",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},92939,"施工中进行工程计量，因工程变更引起工程量增减时，应按( )计算。",[241,243,245,247],{"key":20,"text":242,"correct":22},"由造价咨询人重新进行编制的工程量清单",{"key":24,"text":244,"correct":29},"承包人在履行合同义务中完成的工程量",{"key":27,"text":246,"correct":22},"承包人计量报告中所列的工程量",{"key":31,"text":248,"correct":22},"双方协商的工程量",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},92940,"在竣工结算时，暂列金额应减去工程价款调整与索赔、现场签证金额计算，如有余额归( )所有。",[253,255,257,259],{"key":20,"text":254,"correct":22},"承包人",{"key":24,"text":256,"correct":29},"发包人",{"key":27,"text":258,"correct":22},"发包人和承包人共同",{"key":31,"text":260,"correct":22},"监理人",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":27,"analysis":33},92941,"采用总费用法计算索赔，适用于( )。",[265,267,269,271],{"key":20,"text":266,"correct":22},"采取低价策略中标的工程",{"key":24,"text":268,"correct":22},"总索赔费用较大的工程",{"key":27,"text":270,"correct":29},"多个索赔事件混杂在一起的工程",{"key":31,"text":272,"correct":22},"采用固定总价合同的工程",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},92942,"根据《建设工程工程量清单计价规范》(GB50500---2013)规定，招标工程以投标截止日前( )天，非招标工程以合同签订前( )天为调整合同价款基准日。",[277,279,281,283],{"key":20,"text":278,"correct":22},"7；14",{"key":24,"text":280,"correct":22},"14；14",{"key":27,"text":282,"correct":22},"14；28",{"key":31,"text":284,"correct":29},"28；28",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},92943,"当合同中没有约定价格变化的范围或幅度，材料、工程设备单价变化超过( )时，超过部分的价格应按照价格指数调整法或造价信息差额调整法计算调整相关费用。",[289,291,293,295],{"key":20,"text":290,"correct":22},"1％",{"key":24,"text":292,"correct":22},"3％",{"key":27,"text":294,"correct":29},"5％",{"key":31,"text":21,"correct":22},{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},92944,"因不可抗力事件导致的人员伤亡、财产损失及其费用增加，发承包双方分别承担并调整合同价款和工期应遵循的原则错误的是( )。",[300,302,304,306],{"key":20,"text":301,"correct":22},"发包人、承包人人员伤亡由其所在单位负责，并应承担相应费用",{"key":24,"text":303,"correct":22},"承包人的施工机械设备损坏及停工损失，应由承包人承担",{"key":27,"text":305,"correct":22},"停工期间，承包人应发包人要求留在施工场地的必要的管理人员及保卫人员的费用，应由发包人承担",{"key":31,"text":307,"correct":29},"工程所需清理、修复费用，应由承包人承担",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},92945,"因承包人原因造成的超出合同工程范围施工或返工的工程量，发包人( )。",[312,314,316,318],{"key":20,"text":313,"correct":29},"不予计量",{"key":24,"text":315,"correct":22},"应予计量",{"key":27,"text":317,"correct":22},"应酌情计量",{"key":31,"text":319,"correct":22},"应予处罚",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},92946,"在合同约定的缺陷责任期终止后的（ ）天内，发包人应将剩余的质量保证金返还给承包人。",[324,325,326,327],{"key":20,"text":218,"correct":22},{"key":24,"text":220,"correct":29},{"key":27,"text":222,"correct":22},{"key":31,"text":224,"correct":22},{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":20,"analysis":33},92947,"发包人在付款期满后的（ ）天内仍未支付的，若发生安全事故，发包人应承担相应责任。",[332,333,334,336],{"key":20,"text":218,"correct":29},{"key":24,"text":220,"correct":22},{"key":27,"text":335,"correct":22},"21",{"key":31,"text":224,"correct":22},{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":27,"analysis":33},92948,"承包人采购材料和工程设备的，当没有约定主要材料、工程设备价格变化的范围或幅度，且材料、工程设备单价变化超过（ ）时，超过部分的价格应按照价格指数调整法或造价信息差额调整法计算调整材料、工程设备费。",[341,343,345,347],{"key":20,"text":342,"correct":22},"3%",{"key":24,"text":344,"correct":22},"4%",{"key":27,"text":346,"correct":29},"5%",{"key":31,"text":348,"correct":22},"6%",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":20,"analysis":33},92949,"交付使用资产明细表属于工程竣工决算中的( )。",[353,355,357,359],{"key":20,"text":354,"correct":29},"项目竣工财务决算报表",{"key":24,"text":356,"correct":22},"竣工财务决算说明书",{"key":27,"text":358,"correct":22},"竣工财务决(结)算审核情况",{"key":31,"text":360,"correct":22},"相关资料",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},92950,"下列工程费用中，应列入工程建设其他费用的是（）。",[365,367,369,371],{"key":20,"text":366,"correct":22},"施工企业管理费",{"key":24,"text":368,"correct":29},"建设单位管理费",{"key":27,"text":370,"correct":22},"工程定位复测费",{"key":31,"text":79,"correct":22},{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":27,"analysis":33},92952,"在竣工验收阶段，建设单位要对从筹建到竣工投产全过程的全部实际支出的费用进行汇总，编制（）。",[376,378,380,382],{"key":20,"text":377,"correct":22},"竣工结算",{"key":24,"text":379,"correct":22},"施工结算",{"key":27,"text":381,"correct":29},"竣工决算",{"key":31,"text":383,"correct":22},"施工图预算",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":27,"analysis":33},92953,"工程造价的计算要根据不同的建设阶段，按照不同的确定依据，分次进行。这体现了工程造价的（）计价特点。",[388,390,392,394],{"key":20,"text":389,"correct":22},"单件性计价",{"key":24,"text":391,"correct":22},"分部组合计价",{"key":27,"text":393,"correct":29},"多次性计价",{"key":31,"text":395,"correct":22},"按构成计价",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":31,"analysis":33},92954,"在建筑安装工程费用中，脚手架购置费的摊销(或租赁)费用应列入（）。",[400,402,403,405],{"key":20,"text":401,"correct":22},"直接工程费",{"key":24,"text":53,"correct":22},{"key":27,"text":404,"correct":22},"规费",{"key":31,"text":406,"correct":29},"措施项目费",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":24,"analysis":33},92955,"按照概算法分类，建设投资由工程费用、工程建设其他费用与( )三部分组成。",[411,413,415,417],{"key":20,"text":412,"correct":22},"建设期利息",{"key":24,"text":414,"correct":29},"预备费",{"key":27,"text":416,"correct":22},"土地使用费",{"key":31,"text":418,"correct":22},"无形资产费用",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":20,"analysis":33},92956,"关于工程造价的说法，正确的是（）。",[423,425,427,429],{"key":20,"text":424,"correct":29},"建筑安装工程造价是业主投资中应以价款的形式支付给施工企业的全部生产费用",{"key":24,"text":426,"correct":22},"建筑安装工程造价是指业主进行工程建设花费的全部固定资产投资",{"key":27,"text":428,"correct":22},"建设工程造价是指建筑安装产品的价格",{"key":31,"text":430,"correct":22},"建设工程造价是指建筑安装工程造价",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":27,"analysis":33},92957,"材料的定额消耗量包括（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"材料全部净耗量",{"key":24,"text":438,"correct":22},"材料全部耗用量",{"key":27,"text":440,"correct":29},"材料净耗量和不可避免损耗量",{"key":31,"text":442,"correct":22},"材料净耗量和全部损耗量",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},92958,"《建设工程工程量清单计价规范》规定，分部分项工程量清单的项目编码，应采用12位阿拉伯数字表示，其中第1、2位为（ ）。",[447,449,451,453],{"key":20,"text":448,"correct":22},"附录分类顺序码",{"key":24,"text":450,"correct":29},"专业工程代码",{"key":27,"text":452,"correct":22},"清单项目名称顺序码",{"key":31,"text":454,"correct":22},"分项工程名称顺序码",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":31,"analysis":33},92959,"某建设项目的建设期为2年，第一年贷款400万元，第二年没有增加新的贷款，贷款年利率为10%，假设贷款是分年均衡发放，则建设期的贷款利息为（ ）万元。",[459,461,463,465],{"key":20,"text":460,"correct":22},"20",{"key":24,"text":462,"correct":22},"40",{"key":27,"text":464,"correct":22},"60",{"key":31,"text":466,"correct":29},"62",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},92960,"建设工程造价中的工程费用是指（）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"工程建设其他费用和预备费之和",{"key":24,"text":474,"correct":29},"设备工器具购置费用与建筑安装工程费用之和",{"key":27,"text":476,"correct":22},"建设投资和建设期利息之和",{"key":31,"text":478,"correct":22},"基本预备费与涨价预备费之和",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":31,"analysis":33},92961,"有效控制工程造价应遵循的原则不包括（）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"以设计阶段为重点进行建设全过程造价控制原则",{"key":24,"text":486,"correct":22},"主动控制原则",{"key":27,"text":488,"correct":22},"令人满意原则",{"key":31,"text":490,"correct":29},"技术与经济相结合以经济为主原则",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":31,"analysis":33},92962,"我国进口设备时，若采用装运港船上交货价方式，卖方的责任有（）。",[495,497,499,501],{"key":20,"text":496,"correct":22},"负责租船和订舱，支付运费",{"key":24,"text":498,"correct":22},"负责办理保险及支付保险费",{"key":27,"text":500,"correct":22},"办理在目的港的进口手续",{"key":31,"text":502,"correct":29},"负责货物装船前的一切费用和风险",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":31,"analysis":33},92963,"下列工程费用中，属于企业管理费的是（）。",[507,508,510,512],{"key":20,"text":77,"correct":22},{"key":24,"text":509,"correct":22},"大型机械设备进出场及安拆费",{"key":27,"text":511,"correct":22},"施工机具使用费",{"key":31,"text":513,"correct":29},"职工教育经费",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},92964,"某建设工程项目进口一台大型生产设备，采用离岸价格(FO B)形式，则下列不属于该进口设备原价的是（）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"国际运费",{"key":24,"text":521,"correct":22},"国际运输保险费",{"key":27,"text":523,"correct":29},"国内运费",{"key":31,"text":525,"correct":22},"关税",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},92965,"下列投资和费用构成项目中，属于建设项目总投资中的建设投资的是（）。",[530,532,533,535],{"key":20,"text":531,"correct":22},"流动资金投资",{"key":24,"text":412,"correct":22},{"key":27,"text":534,"correct":22},"经营成本",{"key":31,"text":414,"correct":29},{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},92966,"工程造价控制应遵循的原则是（）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"最优化原则",{"key":24,"text":543,"correct":22},"经济为主、技术为辅原则",{"key":27,"text":545,"correct":22},"以决策阶段为重点进行建设全过程控制原则",{"key":31,"text":486,"correct":29},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":27,"analysis":33},92967,"按照形成资产法，建设投资应包括固定资产费用、无形资产费用、其他资产费用和（）。",[551,553,555,556],{"key":20,"text":552,"correct":22},"措施费用",{"key":24,"text":554,"correct":22},"流动资产费用",{"key":27,"text":414,"correct":29},{"key":31,"text":412,"correct":22},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":27,"analysis":33},92968,"业主进行工程建设花费的全部固定资产投资称为（）",[561,563,565,567],{"key":20,"text":562,"correct":22},"建筑安装产品价格",{"key":24,"text":564,"correct":22},"建筑安装工程造价",{"key":27,"text":566,"correct":29},"建设工程造价",{"key":31,"text":568,"correct":22},"建设项目总投资",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},92969,"在建筑安装工程费中，工会经费应列入（）",[573,574,575,577],{"key":20,"text":53,"correct":29},{"key":24,"text":404,"correct":22},{"key":27,"text":576,"correct":22},"措施费",{"key":31,"text":578,"correct":22},"工程建设其他费",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":31,"analysis":33},92970,"按照造价形成划分，下列费用中属于建筑安装工程费中措施项目费的是（）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"勘察设计费",{"key":24,"text":586,"correct":22},"检验试验费",{"key":27,"text":588,"correct":22},"总承包服务费",{"key":31,"text":370,"correct":29},{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},92971,"下列费用中，按照概算法分类，属于建筑安装工程费的是（）。",[594,596,597,598],{"key":20,"text":595,"correct":22},"联合试运转费",{"key":24,"text":576,"correct":29},{"key":27,"text":416,"correct":22},{"key":31,"text":513,"correct":22},[600,603,606,609,612,614],{"id":601,"name":602,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":604,"name":605,"category":7,"favorite":8},30,"经济师",{"id":607,"name":608,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":610,"name":611,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":613,"category":7,"favorite":8},"(初级)保险专业",{"id":615,"name":616,"category":7,"favorite":8},51,"(初级)财政税收"]