[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":557},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,24,50,2598,[13,34,46,58,70,82,94,106,116,128,136,148,160,172,184,193,205,217,225,233,245,257,265,277,289,301,313,325,334,346,358,370,382,391,403,415,423,435,443,451,461,469,481,489,497,505,513,525,533,545],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},92772,1,"单选题","某工程网络计划中，工作D有三项紧前工作，其最早开始时间分别是第25周、第21周和第19周，三项工作的持续时间分别是3周、8周和7周，则工作D的最早开始时间是第（）周。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","26",false,{"key":24,"text":25,"correct":22},"B","28",{"key":27,"text":28,"correct":29},"C","29",true,{"key":31,"text":32,"correct":22},"D","31","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},92774,"网络计划中的关键线路是指由（）构成的贯穿起终点的线路。",[38,40,42,44],{"key":20,"text":39,"correct":22},"关键节点",{"key":24,"text":41,"correct":22},"总时差为零的工作",{"key":27,"text":43,"correct":22},"自由时差为零的工作",{"key":31,"text":45,"correct":29},"总时差最小的工作",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},92775,"根据表中给出的逻辑关系绘制的双代号网络图如下图所示，图中绘制的错误是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"逻辑关系表达不正确",{"key":24,"text":53,"correct":29},"节点编号有错误",{"key":27,"text":55,"correct":22},"出现了相同代号的工作",{"key":31,"text":57,"correct":22},"有多余的虚工作",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},92776,"某项工作有3项紧后工作，其持续时间分别为4天、5天、6天；其最迟完成时间分别为19天、16天、15天，本工作的最迟完成时间是（）天。",[62,64,66,68],{"key":20,"text":63,"correct":22},"14",{"key":24,"text":65,"correct":22},"11",{"key":27,"text":67,"correct":29},"9",{"key":31,"text":69,"correct":22},"6",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},92777,"在网络计划中，所谓“虚工作”的特点是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"既消耗时间，又消耗资源",{"key":24,"text":77,"correct":22},"只消耗时间，不消耗资源",{"key":27,"text":79,"correct":22},"不消耗时间，只消耗资源",{"key":31,"text":81,"correct":29},"不消耗时间，也不消耗资源",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},92778,"从起点节点开始，沿箭头方向顺序通过一系列箭线与节点，最后达到终点节点的通路称为（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"节点",{"key":24,"text":89,"correct":29},"线路",{"key":27,"text":91,"correct":22},"自由时差",{"key":31,"text":93,"correct":22},"关键工作",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},92779,"下列关于双代号网络图中的节点说法错误的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"不占用空间",{"key":24,"text":101,"correct":22},"是个瞬间值",{"key":27,"text":103,"correct":29},"耗费资源",{"key":31,"text":105,"correct":22},"表示工作的开始或结束",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},92780,"某工程双代号时标网络计划中，工作H有三项紧后工作，其工作总时差分别为4．6和7周，工作H的自由时差为2周，则工作H的总时差是（）周。",[110,112,113,115],{"key":20,"text":111,"correct":22},"4",{"key":24,"text":69,"correct":29},{"key":27,"text":114,"correct":22},"7",{"key":31,"text":67,"correct":22},{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":24,"analysis":33},92781,"在网络计划中，工作最迟完成时间应是其所有紧后工作（）。",[120,122,124,126],{"key":20,"text":121,"correct":22},"最迟完成时间的最小值",{"key":24,"text":123,"correct":29},"最迟开始时间的最小值",{"key":27,"text":125,"correct":22},"最迟完成时间的最大值",{"key":31,"text":127,"correct":22},"最迟开始时间的最大值",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":24,"analysis":33},92782,"在双代号网络计划中，某工作的最迟完成时间等于其所有紧后工作（）。",[132,133,134,135],{"key":20,"text":121,"correct":22},{"key":24,"text":123,"correct":29},{"key":27,"text":125,"correct":22},{"key":31,"text":127,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":31,"analysis":33},92783,"在某工程网络计划中，工作H的最早开始时间和最迟开始时间分别为第20天和第25天，其持续时间为9天。该工作有两项紧后工作．它们的最早开始时间分别为第32天和第34天，则工作H的总时差和自由时差分别为（）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"3天和0天",{"key":24,"text":143,"correct":22},"3天和2天",{"key":27,"text":145,"correct":22},"5天和0天",{"key":31,"text":147,"correct":29},"5天和3天",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":20,"analysis":33},92786,"网络计划中，工作M的最早开始时间是第8天，持续时间为5天．该工作有三项紧后工作，其最早开始时间分别为第16、18、21天，则工作M的自由时差是（）天。",[152,154,156,158],{"key":20,"text":153,"correct":29},"3",{"key":24,"text":155,"correct":22},"5",{"key":27,"text":157,"correct":22},"8",{"key":31,"text":159,"correct":22},"10",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":27,"analysis":33},92788,"在网络计划执行过程中，发现工作G尚需5天完成，至该工作最迟完成时间还有3天，则该事项造成的影响是（）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"工作G的实际进度比计划进度拖后3天",{"key":24,"text":167,"correct":22},"工作G的实际进度比计划进度拖后5天",{"key":27,"text":169,"correct":29},"将使总工期拖后2天",{"key":31,"text":171,"correct":22},"将使总工期拖后3天",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},92790,"某网络计划执行过程中，发现工作F还需工作8天，但该工作至最早完成时间尚有2天，最迟完成时间有4天，则该工作使总工期（）。",[176,178,180,182],{"key":20,"text":177,"correct":22},"拖后2天",{"key":24,"text":179,"correct":29},"拖后4天",{"key":27,"text":181,"correct":22},"拖后6天",{"key":31,"text":183,"correct":22},"拖后8天",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},92792,"在单代号网络计划中，工作A的最早开始时间为第16天，持续时间为8天，工作A有三项紧后工作，其最早开始时间分别为第32、28、30天，则工作A的自由时差为（）天。",[188,190,191,192],{"key":20,"text":189,"correct":22},"2",{"key":24,"text":111,"correct":29},{"key":27,"text":69,"correct":22},{"key":31,"text":157,"correct":22},{"id":194,"libraryId":5,"type":15,"typeLabel":16,"stem":195,"options":196,"answer":31,"analysis":33},92794,"下列有关工程网络计划叙述正确的是（）。",[197,199,201,203],{"key":20,"text":198,"correct":22},"总时差为零的工作为关键工作",{"key":24,"text":200,"correct":22},"关键线路上不允许有虚工作的存在",{"key":27,"text":202,"correct":22},"自由时差为零时，总时差必为零",{"key":31,"text":204,"correct":29},"除了以网络计划终点为完成节点的工作．其他工作的最迟完成时间应等于其紧后工作最迟开始时间的最小值",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":24,"analysis":33},92796,"某项工作估计可能完成的最长时间为18天，最短为14天，最有可能的时间为16天，则该工作的持续时间为（）天。",[209,211,213,215],{"key":20,"text":210,"correct":22},"15",{"key":24,"text":212,"correct":29},"16",{"key":27,"text":214,"correct":22},"17",{"key":31,"text":216,"correct":22},"18",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":27,"analysis":33},92799,"某单代号网络计划中．工作N与其紧后工作 H、M的时间间隔分别为5周和3周，工作H和M的总时差分别为2周和6周，则工作N的总时差是（）周。",[221,222,223,224],{"key":20,"text":153,"correct":22},{"key":24,"text":155,"correct":22},{"key":27,"text":114,"correct":29},{"key":31,"text":67,"correct":22},{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":27,"analysis":33},92801,"某单代号网络计划中，工作B与其紧后工作 E、G之间的时间间隔分别是3天和6天，工作E和G的总时差分别为5天和3天，则工作B的总时差应为（）天。",[229,230,231,232],{"key":20,"text":153,"correct":22},{"key":24,"text":69,"correct":22},{"key":27,"text":157,"correct":29},{"key":31,"text":67,"correct":22},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":31,"analysis":33},92802,"下列关于工作总时差的说法中，正确的是（）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"总时差是在不影响其紧后工作最早开始时间的前提下，本工作可以利用的机动时间",{"key":24,"text":240,"correct":22},"总时差是在不影响其后续工作最迟开始时间的前提下，本工作可以利用的机动时间",{"key":27,"text":242,"correct":22},"总时差是在不影响其后续工作最早完成时间的前提下，本工作可以利用的机动时间",{"key":31,"text":244,"correct":29},"总时差是在不影响总工期的前提下，本工作可以利用的机动时间",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":24,"analysis":33},92805,"工作E是某工程网络计划中的非关键工作，在该计划执行过程中，工作E的实际进度比计划进度拖后，且拖后的时间超过了其自由时差，则工作E将影响（）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"紧前工作的最迟开始时问",{"key":24,"text":252,"correct":29},"紧后工作的最早开始时间",{"key":27,"text":254,"correct":22},"紧后工作的最迟开始时间",{"key":31,"text":256,"correct":22},"后续工作的最迟完成时间",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},92807,"某工程单代号网络计划中，工作G的最早开始时间为第18天，持续时间为5天，工作G有三项紧后工作，其最早开始时间分别为第28．30和32天，则工作G的自由时差是（）天。",[261,262,263,264],{"key":20,"text":155,"correct":29},{"key":24,"text":114,"correct":22},{"key":27,"text":67,"correct":22},{"key":31,"text":159,"correct":22},{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":24,"analysis":33},92809,"网络计划的调整，可以（），也可以根据计划检查的结果在必要时进行调整。",[269,271,273,275],{"key":20,"text":270,"correct":22},"经常进行",{"key":24,"text":272,"correct":29},"定期进行",{"key":27,"text":274,"correct":22},"必要时进行",{"key":31,"text":276,"correct":22},"甲方要求时",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":24,"analysis":33},92811,"在网络计划执行过程中，发现A工作还需工作6天，但至该工作最迟完成时间尚有4 天，则该工作（）。",[281,283,285,287],{"key":20,"text":282,"correct":22},"超前2天",{"key":24,"text":284,"correct":29},"影响总工期2天",{"key":27,"text":286,"correct":22},"影响总工期4天",{"key":31,"text":288,"correct":22},"影响总工期6天",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":27,"analysis":33},92813,"在网络计划实施过程中，当某项工作进度比原计划最早开始时间拖后，拖延的时间刚好等于其总时差，则该工作（）。",[293,295,297,299],{"key":20,"text":294,"correct":22},"不影响其紧后工作的最早开始时间",{"key":24,"text":296,"correct":22},"必将影响工程总工期",{"key":27,"text":298,"correct":29},"不影响其紧后工作的最迟开始时间",{"key":31,"text":300,"correct":22},"对其后续工作及工程总工期均无影响",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":27,"analysis":33},92815,"若某工程网络计划的计算工期等于计划工期，则该网络计划中的关键工作是（）的工作。",[305,307,309,311],{"key":20,"text":306,"correct":22},"时标网络计划中没有波形线",{"key":24,"text":308,"correct":22},"与紧后工作之间时间间隔为零",{"key":27,"text":310,"correct":29},"最早完成时间等于最迟完成时间",{"key":31,"text":312,"correct":22},"开始节点与完成节点均为关键节点",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":24,"analysis":33},92817,"所谓双代号网络计划，是以箭线及其两端节点编号表示工作的( )。",[317,319,321,323],{"key":20,"text":318,"correct":22},"成本计划",{"key":24,"text":320,"correct":29},"进度计划",{"key":27,"text":322,"correct":22},"质量控制计划",{"key":31,"text":324,"correct":22},"合同管理计划",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":24,"analysis":33},92818,"某工程双代号网络计划中，工作E的持续时间为7天，总时差为5天，其最早完成时间是第12天，则工作E的最迟开始时间是第()天。",[329,330,331,332],{"key":20,"text":67,"correct":22},{"key":24,"text":159,"correct":29},{"key":27,"text":65,"correct":22},{"key":31,"text":333,"correct":22},"12",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},92820,"工程网络计划中，关于各项工作之间的逻辑关系，下列叙述不正确的是( )。",[338,340,342,344],{"key":20,"text":339,"correct":22},"逻辑关系包括工艺关系和组织关系",{"key":24,"text":341,"correct":29},"生产性工作之间的顺序由工作程序决定",{"key":27,"text":343,"correct":22},"非生产性工作之间由工作程序决定先后顺序关系",{"key":31,"text":345,"correct":22},"组织关系是指工作之间由于组织安排需要或资源调配需要而确定的先后顺序关系",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},92822,"某工程网络计划实施过程中，工作B的总时差刚好全部被占用，则（ ）不会受到影响。",[350,352,354,356],{"key":20,"text":351,"correct":22},"该工作的最早完成时间",{"key":24,"text":353,"correct":22},"其紧后工作的最早开始时间",{"key":27,"text":355,"correct":22},"其后续工作的最早完成时间",{"key":31,"text":357,"correct":29},"工程总工期",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},92824,"下列不属于网络计划优化的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":29},"质量优化",{"key":24,"text":365,"correct":22},"工期优化",{"key":27,"text":367,"correct":22},"费用优化",{"key":31,"text":369,"correct":22},"资源优化",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},92825,"下列关于双代号网络计划绘图规则，说法正确的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"网络图可以有两个起点节点",{"key":24,"text":377,"correct":22},"网络图中可以出现双向箭头的连线",{"key":27,"text":379,"correct":22},"网络图中的节点都必须有编号，其编号可以重复",{"key":31,"text":381,"correct":29},"应尽量避免网络图中工作箭线的交叉",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":27,"analysis":33},92827,"某工程双代号网络计划中，工作Z的持续时间为6天，最早完成时间是第12天，工作Z的总时差为7天，则工作Z的最迟开始时间是第（ ）天。",[386,387,388,390],{"key":20,"text":114,"correct":22},{"key":24,"text":159,"correct":22},{"key":27,"text":389,"correct":29},"13",{"key":31,"text":216,"correct":22},{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":27,"analysis":33},92829,"关于网络计划中虚箭线的说法，正确的是（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"虚箭线是一项工作，不占用时间，只消耗资源",{"key":24,"text":398,"correct":22},"虚箭线是一项虚拟工作，不消耗资源，只占用时间",{"key":27,"text":400,"correct":29},"虚箭线是一项虚拟工作，不占用时间，也不消耗资源",{"key":31,"text":402,"correct":22},"虚箭线是一项工作，既占用时间，又消耗资源",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},92831,"关于在网络计划中工作自由时差的说法，正确的是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"它是在不影响整个任务按期完成的前提下，该工作的机动时间",{"key":24,"text":410,"correct":29},"它是在不影响其紧后工作最早开始时间的前提下，该工作的机动时间",{"key":27,"text":412,"correct":22},"它是在不影响其紧后工作最迟开始时间的前提下，该工作的机动时间",{"key":31,"text":414,"correct":22},"它是在不影响其紧前工作最早完成时间的前提下，该工作的机动时间",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},92833,"在某工程网络计划中，工作E的持续时间为3周，其最早开始时间是第8周，该工作的总时差和自由时差分别为4周和2周，则工作E的最迟完成时间是第（ ）周。",[419,420,421,422],{"key":20,"text":65,"correct":22},{"key":24,"text":389,"correct":22},{"key":27,"text":210,"correct":29},{"key":31,"text":214,"correct":22},{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":24,"analysis":33},92836,"双代号网络计划中，当某网络计划的计算工期等于计划工期时，关于工作总时差和自由时差的说法，正确的是（ ）。",[427,429,431,433],{"key":20,"text":428,"correct":22},"自由时差为零，总时差必定为零",{"key":24,"text":430,"correct":29},"总时差为零，自由时差必定为零",{"key":27,"text":432,"correct":22},"关键工作的总时差大于其自由时差",{"key":31,"text":434,"correct":22},"非关键工作的总时差等于其自由时差",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":20,"analysis":33},92838,"某工程双代号网络计划中，工作M的最早开始时间是第8天，其持续时间为5天。该工作有三项紧后工作，其最迟开始时间分别为第16天、第18天、第19天。则工作M的总时差是（ ）天。",[439,440,441,442],{"key":20,"text":153,"correct":29},{"key":24,"text":155,"correct":22},{"key":27,"text":69,"correct":22},{"key":31,"text":157,"correct":22},{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":20,"analysis":33},92840,"在双代号网络计划中，工作N的持续时间是5天，最早完成时间是第12天，其总时差为4天，则工作N的最迟开始时间是第（ ）天。",[447,448,449,450],{"key":20,"text":65,"correct":29},{"key":24,"text":333,"correct":22},{"key":27,"text":389,"correct":22},{"key":31,"text":216,"correct":22},{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},92841,"某工程的双代号网络计划中，工作G的最早开始时间是第21天，其持续时间为6天、总时差为4天，则工作G的最迟完成时间是第（ ）天。",[455,457,459,460],{"key":20,"text":456,"correct":22},"25",{"key":24,"text":458,"correct":22},"27",{"key":27,"text":28,"correct":22},{"key":31,"text":32,"correct":29},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":20,"analysis":33},92843,"某单代号网络计划中，工作M有三项紧后工作，工作M与各项紧后工作之间的时间间隔分别为3天、5天和6天，则工作M的自由时差是（ ）天。",[465,466,467,468],{"key":20,"text":153,"correct":29},{"key":24,"text":155,"correct":22},{"key":27,"text":69,"correct":22},{"key":31,"text":63,"correct":22},{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":31,"analysis":33},92845,"单代号网络计划中，关键线路的判定条件是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":22},"工作总时差为零的工作线路",{"key":24,"text":476,"correct":22},"工作自由时差为零的工作线路",{"key":27,"text":478,"correct":22},"时间间隔为零的工作线路",{"key":31,"text":480,"correct":29},"全由关键工作构成，且相邻工作之间时间间隔均为零的工作线路",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},92847,"某工程单代号网络计划中，工作B的最早开始时间为第6天，持续时间为5天。工作B有三项紧后工作，其最早开始时间分别为第14天、第16天、第17天。则工作B的自由时差是（ ）天。",[485,486,487,488],{"key":20,"text":153,"correct":29},{"key":24,"text":155,"correct":22},{"key":27,"text":69,"correct":22},{"key":31,"text":157,"correct":22},{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":31,"analysis":33},92849,"在某单代号网络计划中，工作C有 D、 E、G三项紧后工作，其总时差分别为3天、5天、6天，工作C与紧后工作 D、 E、G之间的时间间隔分别为7天、2天、3天，则工作C的总时差是（ ）天。",[493,494,495,496],{"key":20,"text":153,"correct":22},{"key":24,"text":155,"correct":22},{"key":27,"text":69,"correct":22},{"key":31,"text":114,"correct":29},{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},92851,"在双代号时标网络计划中，工作H有三项紧后工作，其工作总时差分别为4周、7周和8周，工作H的自由时差为3周，则工作H的总时差是（ ）周。",[501,502,503,504],{"key":20,"text":153,"correct":22},{"key":24,"text":111,"correct":22},{"key":27,"text":114,"correct":29},{"key":31,"text":157,"correct":22},{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":27,"analysis":33},92852,"某双代号时标网络计划中，工作D有两项紧后工作，两项紧后工作的总时差分别为4天和6天，工作D的自由时差为2天，则工作D的总时差是（ ）天。",[509,510,511,512],{"key":20,"text":189,"correct":22},{"key":24,"text":111,"correct":22},{"key":27,"text":69,"correct":29},{"key":31,"text":157,"correct":22},{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":27,"analysis":33},92854,"在某工程网络计划的执行过程中，工作D的实际进度比计划进度滞后，滞后的时间大于其自由时差、小于其总时差，则关于工作D实际进度的说法，正确的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"工作D不会影响自身的最早完工时间",{"key":24,"text":520,"correct":22},"工作D不会影响其紧后工作的最早开始时间",{"key":27,"text":522,"correct":29},"工作D不会影响该工程的总工期",{"key":31,"text":524,"correct":22},"工作D不会影响其后续工作的最早完成时间",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},92856,"在单代号网络计划中，工作H的最早开始时间为第12天，持续时间为6天。工作H有三项紧后工作，最早开始时间分别为第22天、第24天、第26天。则工作H的自由时差是（ ）天。",[529,530,531,532],{"key":20,"text":111,"correct":29},{"key":24,"text":69,"correct":22},{"key":27,"text":157,"correct":22},{"key":31,"text":159,"correct":22},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},92858,"在检查某工程网络计划实际执行情况时，发现工作K的实际进度比计划进度滞后5周，工作K的总时差和自由时差分别为3周和1周，则工作K（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":29},"将使其紧后工作的最早开始时间推迟4周",{"key":24,"text":540,"correct":22},"将使其后续工作的最早开始时间推迟5周",{"key":27,"text":542,"correct":22},"将使总工期延误3周",{"key":31,"text":544,"correct":22},"将不影响其紧后工作的自由时差",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},92859,"在时标网络计划中，通过绘制某检查时刻工程实际进度前锋线，进行工程实际进度与计划进度比较的方法是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"横道图比较法",{"key":24,"text":552,"correct":29},"前锋线比较法",{"key":27,"text":554,"correct":22},"列表比较法",{"key":31,"text":556,"correct":22},"香蕉曲线比较法",[558,561,564,567,570,572],{"id":559,"name":560,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":562,"name":563,"category":7,"favorite":8},30,"经济师",{"id":565,"name":566,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":568,"name":569,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":571,"category":7,"favorite":8},"(初级)保险专业",{"id":573,"name":574,"category":7,"favorite":8},51,"(初级)财政税收"]