[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":574},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,23,50,2598,[13,34,46,58,70,81,93,101,113,125,137,149,160,172,184,196,208,220,232,244,254,266,278,290,302,314,326,338,348,360,370,379,391,402,414,424,434,441,453,465,473,485,494,502,510,522,534,546,554,562],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},92675,1,"单选题","项目监理机构对工程的关键部位或关键工序的施工质量进行的监督活动属于监理工作（ ）方式。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","巡视",false,{"key":24,"text":25,"correct":22},"B","平行检验",{"key":27,"text":28,"correct":29},"C","旁站",true,{"key":31,"text":32,"correct":22},"D","见证取样","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},92677,"建设工程网络计划编制程序中，属于绘制网络图阶段的是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"确定网络计划目标",{"key":24,"text":41,"correct":29},"分析逻辑关系",{"key":27,"text":43,"correct":22},"计算工作持续时间",{"key":31,"text":45,"correct":22},"优化网络计划",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},92679,"在工程网络计划执行过程中，如果发现某工作进度拖后，则受影响的工作一定是该工作的()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"平行工作",{"key":24,"text":53,"correct":29},"后续工作",{"key":27,"text":55,"correct":22},"先行工作",{"key":31,"text":57,"correct":22},"紧前工作",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},92681,"网络计划按有无时间坐标可以分为( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"双代号网络计划和单代号网络计划",{"key":24,"text":65,"correct":22},"肯定型网络计划和非肯定型网络计划",{"key":27,"text":67,"correct":29},"时标网络计划和非时标网络计划",{"key":31,"text":69,"correct":22},"单目标网络计划和多目标网络计划",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},92682,"网络计划应用程序中，绘制网络图阶段不包括( )步骤。",[74,76,78,79],{"key":20,"text":75,"correct":22},"工程项目分解",{"key":24,"text":77,"correct":22},"关系逻辑分析",{"key":27,"text":43,"correct":29},{"key":31,"text":80,"correct":22},"绘制网络图",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},92684,"建设工程网络计划编制程序中，紧接“绘制网络图阶段”之后的程序是( )。",[85,87,89,91],{"key":20,"text":86,"correct":22},"计划准备阶段",{"key":24,"text":88,"correct":29},"计算时间参数阶段",{"key":27,"text":90,"correct":22},"网络计划优化阶段",{"key":31,"text":92,"correct":22},"网络计划执行阶段",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},92686,"相对于某工作而言 ，从网络计划起点节点开始，顺箭头方向经过一系列箭线与节点到达该工作为止的各条通路上的所有工作，都称为该工作的（ ）。",[97,98,99,100],{"key":20,"text":55,"correct":29},{"key":24,"text":53,"correct":22},{"key":27,"text":57,"correct":22},{"key":31,"text":51,"correct":22},{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":27,"analysis":33},92688,"关于双代号网络计划中虚工作的说法，正确的是( )。",[105,107,109,111],{"key":20,"text":106,"correct":22},"虚工作只占用时间，不消耗资源",{"key":24,"text":108,"correct":22},"虚工作不占用时间，只消耗资源",{"key":27,"text":110,"correct":29},"虚工作既不占时间，又不消耗资源",{"key":31,"text":112,"correct":22},"虚工作既占用时间，又消耗资源",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":31,"analysis":33},92690,"双代号网络计划中，有时存在虚工作，虚工作的特点是( )。",[117,119,121,123],{"key":20,"text":118,"correct":22},"既消耗时间，又消耗资源",{"key":24,"text":120,"correct":22},"只消耗时间，不消耗资源",{"key":27,"text":122,"correct":22},"不消耗时间，只消耗资源",{"key":31,"text":124,"correct":29},"既不消耗时间，也不消耗资源",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":31,"analysis":33},92692,"下列关于工程双代号网络计划的叙述，正确的是( )。",[129,131,133,135],{"key":20,"text":130,"correct":22},"总时差为零的工作为关键工作",{"key":24,"text":132,"correct":22},"关键线路上不允许有虚工作存在",{"key":27,"text":134,"correct":22},"自由时差为零时，总时差必为零",{"key":31,"text":136,"correct":29},"工作的最迟开始时间等于本工作的最迟完成时间与其持续时间之差。",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":20,"analysis":33},92694,"某分部工程双代号网络计划如下图所示，图中的错误是( )。",[141,143,145,147],{"key":20,"text":142,"correct":29},"节点编号有误",{"key":24,"text":144,"correct":22},"工作代号重复",{"key":27,"text":146,"correct":22},"有多个起点节点",{"key":31,"text":148,"correct":22},"出现了没有外向箭线的节点",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":24,"analysis":33},92696,"根据下表给定的逻辑关系绘制的双代号网络图如下图所示，图中的错误是( )。",[153,155,157,158],{"key":20,"text":154,"correct":22},"有循环回路",{"key":24,"text":156,"correct":29},"有多个终点节点",{"key":27,"text":146,"correct":22},{"key":31,"text":159,"correct":22},"出现没有箭尾节点的箭线",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":27,"analysis":33},92698,"在网络计划的执行过程中，当某项非关键工作的实际进度拖延，且拖后的时间超过其自由时差时，则必定影响( )。",[164,166,168,170],{"key":20,"text":165,"correct":22},"项目的总工期",{"key":24,"text":167,"correct":22},"其紧后工作的最迟开始时间",{"key":27,"text":169,"correct":29},"其紧后工作的最早开始时间",{"key":31,"text":171,"correct":22},"其后续工作的最迟完成时间",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":27,"analysis":33},92700,"某工程网络计划中，工作D有三项紧前工作，其最早开始时间分别是第20周、第18周和第16周，三项工作的持续时间分别是3周、4周和8周，则工作D的最早开始时间是第( )周。",[176,178,180,182],{"key":20,"text":177,"correct":22},"22",{"key":24,"text":179,"correct":22},"23",{"key":27,"text":181,"correct":29},"24",{"key":31,"text":183,"correct":22},"25",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":27,"analysis":33},92702,"在工程双代号网络计划中，某项工作的最早完成时间是指其( )。",[188,190,192,194],{"key":20,"text":189,"correct":22},"在各紧前工作全部完成后，工作有可能开始的最早时刻",{"key":24,"text":191,"correct":22},"开始节点的最早时间与工作自由时差之和",{"key":27,"text":193,"correct":29},"在各紧前工作全部完成后，本工作有可能完成的最早时刻",{"key":31,"text":195,"correct":22},"开始节点的最早时间与工作总时差之和",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":27,"analysis":33},92704,"在不影响紧后工作最早开始时间的前提下，本工作可利用的机动时间为( )。",[200,202,204,206],{"key":20,"text":201,"correct":22},"总时差",{"key":24,"text":203,"correct":22},"最迟开始时间",{"key":27,"text":205,"correct":29},"自由时差",{"key":31,"text":207,"correct":22},"最迟完成时间",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":27,"analysis":33},92706,"在双代号网络计划中，相邻两项工作之间的时间间隔等于( )。",[212,214,216,218],{"key":20,"text":213,"correct":22},"本工作的最早完成时间与本工作的最早开始时间的差值",{"key":24,"text":215,"correct":22},"本工作的最迟完成时间与其紧后工作的最迟完成时间的差值",{"key":27,"text":217,"correct":29},"本工作的最早完成时间与其紧后工作的最早开始时间的差值",{"key":31,"text":219,"correct":22},"工作的最早完成时间与其持续时间的差值",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},92709,"除以网络计划起点节点为开始节点的工作外，其他工作的最早开始时间等于其紧前工作( )。",[224,226,228,230],{"key":20,"text":225,"correct":22},"最早完成时间的最小值",{"key":24,"text":227,"correct":29},"最早完成时间的最大值",{"key":27,"text":229,"correct":22},"最迟完成时间的最小值",{"key":31,"text":231,"correct":22},"最迟完成时间的最大值",{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":20,"analysis":33},92711,"下列关于自由时差和总时差的说法错误的是( )。",[236,238,240,242],{"key":20,"text":237,"correct":29},"自由时差为零，总时差必定为零",{"key":24,"text":239,"correct":22},"总时差为零，自由时差必定为零",{"key":27,"text":241,"correct":22},"在不影响总工期的前提下，本工作的机动时间为总时差",{"key":31,"text":243,"correct":22},"在不影响紧后工作最早开始时间的前提下，本工作的机动时间为自由时差",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":31,"analysis":33},92713,"在工程双代号网络计划中，工作M有 B、 D、E三项紧前工作，其持续时间和工作最早开始时间见下表，则工作M的最早开始时间是第( )天。",[248,250,251,252],{"key":20,"text":249,"correct":22},"20",{"key":24,"text":177,"correct":22},{"key":27,"text":181,"correct":22},{"key":31,"text":253,"correct":29},"26",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":24,"analysis":33},92715,"下列关于双代号网络计划中关键工作和关键线路的说法，错误的是( )。",[258,260,262,264],{"key":20,"text":259,"correct":22},"总持续时间最长的线路称为关键线路",{"key":24,"text":261,"correct":29},"在双代号网络计划中，关键线路有且只有一条",{"key":27,"text":263,"correct":22},"关键线路上的工作称为关键工作",{"key":31,"text":265,"correct":22},"在关键线路上可能有虚工作存在",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},92717,"双代号网络计划中的节点表示( )。",[270,272,274,276],{"key":20,"text":271,"correct":22},"工作",{"key":24,"text":273,"correct":22},"工作的开始",{"key":27,"text":275,"correct":22},"工作的结束",{"key":31,"text":277,"correct":29},"工作的开始或结束",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},92718,"在绘制双代号网络图时，一般应遵循的基本规则中不正确的是( )。",[282,284,286,288],{"key":20,"text":283,"correct":29},"网络图必须按照已定的递进关系绘制",{"key":24,"text":285,"correct":22},"网络图中严禁出现从一个节点出发，顺箭头方向又回到原出发点的循环回路",{"key":27,"text":287,"correct":22},"网络图中严禁出现双向箭头和无箭头的连线",{"key":31,"text":289,"correct":22},"网络图中严禁出现没有箭尾节点的箭线和没有箭头节点的箭线",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},92720,"某网络计划执行过程中，发现工作M还需工作9天，但该工作至最早完成时间尚有2天，最迟完成时间有5天，则该工作使总工期( )。",[294,296,298,300],{"key":20,"text":295,"correct":22},"拖后2天",{"key":24,"text":297,"correct":29},"拖后4天",{"key":27,"text":299,"correct":22},"拖后6天",{"key":31,"text":301,"correct":22},"拖后8天",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":20,"analysis":33},92722,"下列关于工作总时差的说法中，正确的是()。",[306,308,310,312],{"key":20,"text":307,"correct":29},"总时差是指在不影响总工期的前提下，本工作可以利用的最大机动时间",{"key":24,"text":309,"correct":22},"总时差是在不影响其紧后工作最早开始时间的前提下，本工作可以利用的机动时间",{"key":27,"text":311,"correct":22},"总时差是在不影响其后续工作最迟开始时间的前提下，本工作可以利用的机动时间",{"key":31,"text":313,"correct":22},"总时差是在不影响其后续工作最早完成时间的前提下，本工作可以利用的机动时间",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":31,"analysis":33},92724,"工程网络计划技术应用程序可分为五个阶段：①绘制网络图阶段；②计算时间参数阶段；③计划准备阶段；④网络计划执行阶段；⑤网络计划优化阶段。下列排序正确的是()。",[318,320,322,324],{"key":20,"text":319,"correct":22},"①②③④⑤",{"key":24,"text":321,"correct":22},"③②①④⑤",{"key":27,"text":323,"correct":22},"③②①⑤④",{"key":31,"text":325,"correct":29},"③①②⑤④",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},92726,"某工程双代号网络计划中，工作M的最早开始时间为第6天，其持续时间为5天，其紧后工作的最早开始时间和最迟开始时间分别为第14天和第16天，则工作M的自由时差为（ ）天。",[330,332,334,336],{"key":20,"text":331,"correct":29},"3",{"key":24,"text":333,"correct":22},"4",{"key":27,"text":335,"correct":22},"5",{"key":31,"text":337,"correct":22},"6",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},92728,"根据下表给定的逻辑关系绘制的双代号网络图如下所示，图中的错误是( )。",[342,344,345,346],{"key":20,"text":343,"correct":22},"有循环线路",{"key":24,"text":156,"correct":29},{"key":27,"text":146,"correct":22},{"key":31,"text":347,"correct":22},"逻辑关系不正确",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},92730,"根据表中给出的逻辑关系绘制的双代号网络图如下图所示，图中绘图的错误是（ ）。",[352,354,356,358],{"key":20,"text":353,"correct":22},"逻辑关系表达不正确",{"key":24,"text":355,"correct":29},"节点编号有错误",{"key":27,"text":357,"correct":22},"出现了相同代号的工作",{"key":31,"text":359,"correct":22},"有多余的虚工作",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":27,"analysis":33},92732,"（ ）是指在不影响整个任务按期完成的前提下，本工作必须开始的最迟时刻。",[364,366,368,369],{"key":20,"text":365,"correct":22},"最早开始时间",{"key":24,"text":367,"correct":22},"最早完成时间",{"key":27,"text":203,"correct":29},{"key":31,"text":207,"correct":22},{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},92734,"某工程双代号网络计划中，工作M的最早开始时间是第9天，其持续时间为6天。该工作有三项紧后工作，其最迟开始时间分别为第l7天、第18天和第19天。则工作M的总时差是( )天。",[374,376,377,378],{"key":20,"text":375,"correct":29},"2",{"key":24,"text":331,"correct":22},{"key":27,"text":333,"correct":22},{"key":31,"text":337,"correct":22},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":27,"analysis":33},92736,"在某工程网络计划中，工作H的持续时间为4周，其最早开始时间是第7周。该工作的总时差和自由时差分别为5周和3周。则工作H的最迟完成时间是第( )周。",[383,385,387,389],{"key":20,"text":384,"correct":22},"13",{"key":24,"text":386,"correct":22},"14",{"key":27,"text":388,"correct":29},"16",{"key":31,"text":390,"correct":22},"17",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},92737,"在工程网络计划中，工作M有两项紧前工作，其最早开始时间分别是第15周、第21周，两项工作的持续时间分别是9周、10周，则工作M的最早开始时间是第( )周。",[395,396,398,400],{"key":20,"text":181,"correct":22},{"key":24,"text":397,"correct":22},"27",{"key":27,"text":399,"correct":22},"29",{"key":31,"text":401,"correct":29},"31",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},92739,"在网络计划执行过程中，发现B工作还需工作7天完成，但至该工作最迟完成时间还有4天，则该工作( )。",[406,408,410,412],{"key":20,"text":407,"correct":22},"超前3天",{"key":24,"text":409,"correct":29},"影响总工期3天",{"key":27,"text":411,"correct":22},"影响总工期4天",{"key":31,"text":413,"correct":22},"影响总工期7天",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},92741,"当网络图中有多项结束工作时，应增设一项（ ），作为该网络图的终点节点。",[418,419,420,422],{"key":20,"text":51,"correct":22},{"key":24,"text":57,"correct":22},{"key":27,"text":421,"correct":22},"紧后工作",{"key":31,"text":423,"correct":29},"虚工作",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":27,"analysis":33},92743,"双代号时标网络计划中，工作D有四项紧后工作，其工作总时差分别为6周、4周、7周和5周，工作D自由时差为3周，则工作D的总时差是( )周。",[428,429,430,432],{"key":20,"text":331,"correct":22},{"key":24,"text":337,"correct":22},{"key":27,"text":431,"correct":29},"7",{"key":31,"text":433,"correct":22},"8",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":436,"answer":31,"analysis":33},92745,[437,438,439,440],{"key":20,"text":249,"correct":22},{"key":24,"text":177,"correct":22},{"key":27,"text":181,"correct":22},{"key":31,"text":253,"correct":29},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},92747,"通过改变某些工作间逻辑关系的方法调整进度计划时，应选择( )。",[445,447,449,451],{"key":20,"text":446,"correct":22},"具有工艺逻辑关系的有关工作",{"key":24,"text":448,"correct":29},"超过计划工期的非关键线路上的有关工作",{"key":27,"text":450,"correct":22},"可以增加资源投入的有关工作",{"key":31,"text":452,"correct":22},"持续时间可以压缩的有关工作",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},92749,"前锋线比较法步骤中，最后一步是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"绘制时标网络计划图",{"key":24,"text":460,"correct":22},"绘制实际进度前锋线",{"key":27,"text":462,"correct":22},"进行实际进度与计划进度的比较",{"key":31,"text":464,"correct":29},"预测工作进度偏差对后续工作及总工期的影响",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":27,"analysis":33},92751,"双代号时标网络计划中，工作D有四项紧后工作，其工作总时差分别为6周、4周、7周和5周，工作D的自由时差为3周，则工作D的总时差是（）周。",[469,470,471,472],{"key":20,"text":331,"correct":22},{"key":24,"text":337,"correct":22},{"key":27,"text":431,"correct":29},{"key":31,"text":433,"correct":22},{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},92753,"所谓网络计划，是用网络图表达任务构成、工作顺序，并加注时间参数的（）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"成本计划",{"key":24,"text":480,"correct":29},"进度计划",{"key":27,"text":482,"correct":22},"质量控制计划",{"key":31,"text":484,"correct":22},"合同管理计划",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},92755,"某工程网络计划中，工作A的持续时间为7天，总时差为5天，自由时差为3天。通过计划执行过程检查，发现工作A的实际进度拖延了10天，则将影响工程计划工期（）天。",[489,490,491,492],{"key":20,"text":331,"correct":22},{"key":24,"text":335,"correct":29},{"key":27,"text":431,"correct":22},{"key":31,"text":493,"correct":22},"10",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},92756,"在工程网络计划中，工作M的持续时间为8天，其最早开始时间是第5天。该工作有三项紧后工作，最迟开始时间分别为第17天、20天、22天。则工作M的总时差是（）天。",[498,499,500,501],{"key":20,"text":375,"correct":22},{"key":24,"text":333,"correct":29},{"key":27,"text":337,"correct":22},{"key":31,"text":433,"correct":22},{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},92758,"在网络计划的执行过程中，当某项非关键工作的实际进度拖延，且拖后的时间超过其自由时差时，则必定影响（ ）。",[506,507,508,509],{"key":20,"text":165,"correct":22},{"key":24,"text":167,"correct":22},{"key":27,"text":169,"correct":29},{"key":31,"text":171,"correct":22},{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},92760,"在网络图中，既有内向箭线又有外向箭线的节点被称为（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"开始节点",{"key":24,"text":517,"correct":29},"中间节点",{"key":27,"text":519,"correct":22},"起点节点",{"key":31,"text":521,"correct":22},"终点起点",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":20,"analysis":33},92762,"下列关于单代号网络图节点与箭线的说法中，正确的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":29},"节点一般用圆形或矩形表示",{"key":24,"text":529,"correct":22},"节点必须编号，号码不能间断，也不能重复",{"key":27,"text":531,"correct":22},"箭尾节点编号应大于箭头节点编号",{"key":31,"text":533,"correct":22},"箭线只表示相邻工作之间的逻辑关系，占时间，但不消耗资源",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":24,"analysis":33},92764,"下列关于单代号网络图的说法中，正确的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"节点表示工作，箭线表示工作的开始或结束",{"key":24,"text":541,"correct":29},"节点表示工作，箭线表示工作之间的逻辑关系",{"key":27,"text":543,"correct":22},"箭线表示工作及其进行的方向，节点表示工作的开始或结束",{"key":31,"text":545,"correct":22},"箭线表示工作及其进行的方向，节点表示工作之间的逻辑关系",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":31,"analysis":33},92766,"在工程网络计划中，工作M有 B、 D、E三项紧前工作，其持续时间和工作最早开始时间如下表所示，则工作M的最早开始时间是第（ ）天。",[550,551,552,553],{"key":20,"text":249,"correct":22},{"key":24,"text":177,"correct":22},{"key":27,"text":181,"correct":22},{"key":31,"text":253,"correct":29},{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":24,"analysis":33},92768,"某项工作有两项紧后工作E和 F，E的最迟完成时间是12天．F的最迟完成时间是18天，E的持续时间是7天，F的持续时间是15天，则本工作的最迟完成时间是（）天。",[558,559,560,561],{"key":20,"text":433,"correct":22},{"key":24,"text":331,"correct":29},{"key":27,"text":335,"correct":22},{"key":31,"text":337,"correct":22},{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":31,"analysis":33},92770,"在双代号网络计划中，关键工作是（）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"关键节点",{"key":24,"text":569,"correct":22},"总时差为零的工作",{"key":27,"text":571,"correct":22},"自由时差为零的工作",{"key":31,"text":573,"correct":29},"总时差最小的工作",[575,578,581,584,587,589],{"id":576,"name":577,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":579,"name":580,"category":7,"favorite":8},30,"经济师",{"id":582,"name":583,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":585,"name":586,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":588,"category":7,"favorite":8},"(初级)保险专业",{"id":590,"name":591,"category":7,"favorite":8},51,"(初级)财政税收"]