[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,22,50,2598,[13,34,46,58,70,82,94,102,110,122,134,146,158,170,182,194,206,214,226,238,250,262,273,285,295,307,319,331,343,355,367,379,391,402,414,424,436,447,459,471,483,495,506,518,530,542,554,566,578,590],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},92579,1,"单选题","建设工程监理的理论基础是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","建筑学",false,{"key":24,"text":25,"correct":22},"B","建筑经济学",{"key":27,"text":28,"correct":29},"C","建设项目管理学",true,{"key":31,"text":32,"correct":22},"D","统筹学","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},92581,"下列法规中．属于建设行政法规的是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"《中华人民共和国建筑法》",{"key":24,"text":41,"correct":29},"《建设工程质量管理条例》",{"key":27,"text":43,"correct":22},"《工程建设监理规定》",{"key":31,"text":45,"correct":22},"《建设工程监理企业资质管理规定》",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},92583,"以下（）事项，总监理工程师可以委托总监理工程师代表。",[50,52,54,56],{"key":20,"text":51,"correct":22},"主持编写项目监理规划",{"key":24,"text":53,"correct":22},"审核签认竣工结算",{"key":27,"text":55,"correct":22},"调换不称职的监理人员",{"key":31,"text":57,"correct":29},"检查和监督监理人员的工作",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},92584,"下列属于总监理工程师职责的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"编制监理实施细则",{"key":24,"text":65,"correct":22},"验收检验批、隐蔽工程、分项工程",{"key":27,"text":67,"correct":29},"组织编制监理规划",{"key":31,"text":69,"correct":22},"复核工程计量有关数据",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},92586,"关于工程监理单位的说法，正确的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"工程监理单位应与工程承包单位订立建设工程监理合同",{"key":24,"text":77,"correct":22},"工程监理单位拥有确定建设工程规模、标准等的决定权",{"key":27,"text":79,"correct":29},"工程监理单位是依法从事建设工程监理活动的服务机构",{"key":31,"text":81,"correct":22},"工程监理单位可以获得施工单位降低成本的利润分成",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},92588,"由纵横两套管理系统组成的（ ），它的优点是加强了各职能部门的横向联系，缺点是纵横向协调工作量大，处理不当会造成扯皮现象，产生矛盾。",[86,88,90,92],{"key":20,"text":87,"correct":22},"职能式监理组织形式",{"key":24,"text":89,"correct":22},"直线式监理组织形式",{"key":27,"text":91,"correct":22},"直线职能式监理组织形式",{"key":31,"text":93,"correct":29},"矩阵式监理组织形式",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},92590,"总监理工程师可以委托总监理工程师代表的工作是（ ）",[98,99,100,101],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":22},{"key":31,"text":57,"correct":29},{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":20,"analysis":33},92592,"( )的特点是项目监理机构中任何一个下级只接受唯一上级的命令。",[106,107,108,109],{"key":20,"text":89,"correct":29},{"key":24,"text":87,"correct":22},{"key":27,"text":91,"correct":22},{"key":31,"text":93,"correct":22},{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":20,"analysis":33},92594,"根据《建设工程监理规范和规范标准规定》，“组织编制监理规划，审批监理实施细则”属于（）应履行的职责。",[114,116,118,120],{"key":20,"text":115,"correct":29},"总监理工程师",{"key":24,"text":117,"correct":22},"总监理工程师代表",{"key":27,"text":119,"correct":22},"专业监理工程师",{"key":31,"text":121,"correct":22},"专业监理人员",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":27,"analysis":33},92596,"能够解决工程项目传统控制过程中存在的时滞影响，并降低偏差发生的概率及其严重程度，这类控制称为（ ）。",[126,128,130,132],{"key":20,"text":127,"correct":22},"反馈控制",{"key":24,"text":129,"correct":22},"事中控制",{"key":27,"text":131,"correct":29},"主动控制",{"key":31,"text":133,"correct":22},"被动控制",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":24,"analysis":33},92598,"下列不属于委托监理合同特征的是（）。",[138,140,142,144],{"key":20,"text":139,"correct":22},"委托监理合同的标的是劳务",{"key":24,"text":141,"correct":29},"委托合同是实践合同、非要式合同",{"key":27,"text":143,"correct":22},"委托合同是双务合同",{"key":31,"text":145,"correct":22},"委托合同可以是有偿的，也可以是无偿的",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":31,"analysis":33},92600,"落实项目目标控制的组织机构和人员，明确各级目标控制人员的任务和职能分工、权利和责任，制定目标控制的工作流程，这些是建设工程目标控制的（）。",[150,152,154,156],{"key":20,"text":151,"correct":22},"合同措施",{"key":24,"text":153,"correct":22},"经济措施",{"key":27,"text":155,"correct":22},"技术措施",{"key":31,"text":157,"correct":29},"组织措施",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":24,"analysis":33},92601,"建设工程监理工作的主要内容有：①编制建设工程监理规划；②制定监理实施细则：③确定总监理工程师和成立项目监理机构；④开展监理工作；⑤提交监理档案和工作总结：⑥参与验收并签署监理意见。其正确的实施程序是（）。",[162,164,166,168],{"key":20,"text":163,"correct":22},"①-②-③-④-⑤-⑥",{"key":24,"text":165,"correct":29},"③-①-②-④-⑥-⑤",{"key":27,"text":167,"correct":22},"⑧-②-①-④-⑤-⑥",{"key":31,"text":169,"correct":22},"⑥-⑤-④-③-②-①",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":24,"analysis":33},92603,"关于建设工程项目管理目标系统的说法，错误的是（）。",[174,176,178,180],{"key":20,"text":175,"correct":22},"建设工程项目管理的目标主要包括质量、投资和进度",{"key":24,"text":177,"correct":29},"建设工程项目管理目标系统的制定应保证质量、投资和进度均达到最优",{"key":27,"text":179,"correct":22},"项目的质量、投资和进度之间为对立统一关系",{"key":31,"text":181,"correct":22},"项目的质量、投资和进度目标可度量，管理效果可验证",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":31,"analysis":33},92605,"下列不属于监理信息自身特征的是（）。",[186,188,190,192],{"key":20,"text":187,"correct":22},"动态性强",{"key":24,"text":189,"correct":22},"来源广、信息量大",{"key":27,"text":191,"correct":22},"形式多样",{"key":31,"text":193,"correct":29},"形式单一",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},92607,"处置发现的质量问题和安全事故隐患是（）的职责。",[198,200,202,204],{"key":20,"text":199,"correct":22},"决策层",{"key":24,"text":201,"correct":29},"执行层",{"key":27,"text":203,"correct":22},"操作层",{"key":31,"text":205,"correct":22},"核心层",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":27,"analysis":33},92609,"根据《建设工程监理规范和规模标准规定》，“进行工程计量”属于（）应履行的职责。",[210,211,212,213],{"key":20,"text":115,"correct":22},{"key":24,"text":117,"correct":22},{"key":27,"text":119,"correct":29},{"key":31,"text":121,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},92611,"下列关于项目监理机构组织形式的说法，错误的是（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"直线制监理组织形式要求总监理工程师博晓各种业务，通晓多种技能",{"key":24,"text":221,"correct":22},"职能制监理组织形式的优点是加强了项目监理目标控制的职能分工，能够发挥职能机构的专业管理作用",{"key":27,"text":223,"correct":29},"直线职能制监理组织形式的特点是监理机构中任何一个下级只接受唯一上级的命令",{"key":31,"text":225,"correct":22},"矩阵制监理组织形式的缺点是纵横向协调工作量大。处理不当会造成扯皮现象，产生矛盾",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},92613,"矩阵式监理组织形式的主要优点是（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"管理职责分明、决策迅速",{"key":24,"text":233,"correct":29},"加强了各职能部门的横向联系",{"key":27,"text":235,"correct":22},"纵横向协调工作量小",{"key":31,"text":237,"correct":22},"权利集中、命令统一",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},92615,"关于建设工程项目目标主动控制的说法，正确的是（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"主动控制是一种反馈式控制",{"key":24,"text":245,"correct":22},"主动控制是一种闭环式控制",{"key":27,"text":247,"correct":22},"主动控制是一种事后控制",{"key":31,"text":249,"correct":29},"主动控制是一种事前控制",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},92617,"关于监理工程师在建设工程施工招标阶段进行项目目标活动的说法，正确的是（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"编制施工招标文件",{"key":24,"text":257,"correct":22},"确定招标控制价",{"key":27,"text":259,"correct":22},"协助业主进行投标资格预审工作",{"key":31,"text":261,"correct":29},"协助业主选择施工单位",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},92618,"对建设工程项目目标进行主动控制的主要作用在于（）。",[266,268,270,271],{"key":20,"text":267,"correct":22},"质量检查",{"key":24,"text":269,"correct":29},"防患于未然",{"key":27,"text":129,"correct":22},{"key":31,"text":272,"correct":22},"进度纠偏",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},92620,"建设工程项目管理的投资、质量、进度三个基本目标之间的关系是（）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"相互独立",{"key":24,"text":280,"correct":22},"统一协调",{"key":27,"text":282,"correct":29},"对立统一",{"key":31,"text":284,"correct":22},"相互矛盾",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":24,"analysis":33},92622,"监理规划作为指导项目监理机构全面开展监理工作的指导性文件，应经（）审核批准。",[289,291,293,294],{"key":20,"text":290,"correct":22},"项目业主单位负责人",{"key":24,"text":292,"correct":29},"监理单位技术负责人",{"key":27,"text":115,"correct":22},{"key":31,"text":117,"correct":22},{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},92624,"监理工程师应首先严格遵守国家的建设管理法律、法规、标准等，以高度负责的态度和责任感，既要对业主负责，谋求最大的经济效益，又要对国家和社会负责，取得最佳的综合效益。这属于建设工程监理实施的（）原则。",[299,301,303,305],{"key":20,"text":300,"correct":22},"公正、独立、自主的原则",{"key":24,"text":302,"correct":22},"权责一致的原则",{"key":27,"text":304,"correct":22},"严格监理、热情服务的原则",{"key":31,"text":306,"correct":29},"综合效益的原则",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":20,"analysis":33},92626,"下列情况中，属于监理人违约的是( )。",[311,313,315,317],{"key":20,"text":312,"correct":29},"监理人转让监理工作",{"key":24,"text":314,"correct":22},"主持监理例会并根据工程需要主持或参加专题会议",{"key":27,"text":316,"correct":22},"审查施工承包人提交的施工组织设计",{"key":31,"text":318,"correct":22},"审查工程开工条件，对条件具备的签发开工令",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},92628,"对于项目监理机构处理施工单位提出的工程变更，下列说法正确的是( )。",[323,325,327,329],{"key":20,"text":324,"correct":22},"总监理工程师组织监理员审查施工单位提出的工程变更申请，提出审查意见",{"key":24,"text":326,"correct":22},"对涉及工程设计文件修改的工程变更，应由监理单位转交原设计单位修改工程设计文件。",{"key":27,"text":328,"correct":22},"必要时，项目监理机构应组织设计、施工等单位召开论证工程设计文件的修改方案的专题会议",{"key":31,"text":330,"correct":29},"总监理工程师组织专业监理工程师对工程变更费用及工期影响作出评估",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":27,"analysis":33},92630,"根据《建设工程质量管理条例》规定，监理工程师因过错造成质量事故的处理，正确的是()。",[335,337,339,341],{"key":20,"text":336,"correct":22},"责令停止执业2年",{"key":24,"text":338,"correct":22},"造成重大质量事故的，吊销执业资格证书，3年以内不予注册",{"key":27,"text":340,"correct":29},"造成重大质量事故的，吊销执业资格证书，5年以内不予注册",{"key":31,"text":342,"correct":22},"情节特别恶劣的，10年内不予注册",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":24,"analysis":33},92632,"下列关于工程建设监理的理解，错误的是( )。",[347,349,351,353],{"key":20,"text":348,"correct":22},"建设工程监理制度推行具有强制性",{"key":24,"text":350,"correct":29},"工程监理的行为主体是工程建设单位",{"key":27,"text":352,"correct":22},"工程监理的实施前提是建设单位的委托和授权",{"key":31,"text":354,"correct":22},"工程监理的实施范围主要在施工阶段",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":27,"analysis":33},92633,"关于工程风险分类的说法，正确的是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"根据其造成的不同后果分为纯风险和有利可图的风险",{"key":24,"text":362,"correct":22},"根据其造成的后果可以有经济风险、金融风险和管理风险",{"key":27,"text":364,"correct":29},"按工程项目参与方分为业主或投资商风险、承包商风险和咨询单位风险",{"key":31,"text":366,"correct":22},"从风险作用的强度可分为纯风险和投机风险",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},92635,"下列单位中，属于建设工程监理行为主体的是（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"工程建设单位",{"key":24,"text":374,"correct":29},"工程监理单位",{"key":27,"text":376,"correct":22},"工程设计单位",{"key":31,"text":378,"correct":22},"工程施工单位",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},92637,"工程监理行业能够长期生存和发展的基本职业道德准则是（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"服务性",{"key":24,"text":386,"correct":22},"科学性",{"key":27,"text":388,"correct":22},"独立性",{"key":31,"text":390,"correct":29},"公平性",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":27,"analysis":33},92639,"关于我国现阶段建设工程监理含义的说法，错误的是（ ）。",[395,397,398,400],{"key":20,"text":396,"correct":22},"工程监理的行为主体是工程监理单位",{"key":24,"text":354,"correct":22},{"key":27,"text":399,"correct":29},"工程监理单位受建设行政主管部门的授权为建设单位提供服务",{"key":31,"text":401,"correct":22},"工程监理的基本职责是“三控两管一协调”",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":27,"analysis":33},92641,"根据《建设工程安全生产管理条例》规定，关于工程监理单位的职责的说法，错误的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"工程监理单位应当审查施工组织设计中的专项施工方案是否符合工程建设强制性标准",{"key":24,"text":409,"correct":22},"工程监理单位在实施监理过程中，发现存在安全事故隐患的，应当要求施工单位整改",{"key":27,"text":411,"correct":29},"工程监理单位在实施监理过程中，发现存在安全事故隐患的，应当要求施工单位暂时停止施工",{"key":31,"text":413,"correct":22},"工程监理单位在实施监理过程中，发现存在严重安全事故隐患，应当要求施工单位暂时停止施工",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":27,"analysis":33},92643,"关于建设工程监理人监理工作内容的说法，错误的是（ ）。",[418,419,420,422],{"key":20,"text":314,"correct":22},{"key":24,"text":318,"correct":22},{"key":27,"text":421,"correct":29},"无须经委托人同意，直接签发工程暂停令和复工令",{"key":31,"text":423,"correct":22},"审查施工承包人提交的工程变更申请",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},92645,"根据《建设工程质量管理条例》，可以不实行工程监理的是（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"国家重点建设工程",{"key":24,"text":431,"correct":29},"仅一栋楼的住宅小区工程",{"key":27,"text":433,"correct":22},"大中型公用事业工程",{"key":31,"text":435,"correct":22},"利用外国政府或国际组织贷款、援助资金工程",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":24,"analysis":33},92647,"关于建设工程监理的说法，正确的是（ ）。",[440,442,443,445],{"key":20,"text":441,"correct":22},"工程监理单位拥有确定建设规模、标准的决定权",{"key":24,"text":79,"correct":29},{"key":27,"text":444,"correct":22},"建设工程监理是行政性的监督管理",{"key":31,"text":446,"correct":22},"建设工程监理属于工程承包",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":24,"analysis":33},92648,"目前我国建设工程监理的实施范围主要是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":22},"项目建议书阶段",{"key":24,"text":454,"correct":29},"工程施工阶段",{"key":27,"text":456,"correct":22},"项目运营阶段",{"key":31,"text":458,"correct":22},"项目后评估阶段",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},92650,"在下列监理人员的职责中，属于监理员职责的是（ ）。",[463,465,467,469],{"key":20,"text":464,"correct":29},"进行见证取样",{"key":24,"text":466,"correct":22},"进行工程计量",{"key":27,"text":468,"correct":22},"验收检验批和隐蔽工程",{"key":31,"text":470,"correct":22},"调解建设单位与施工单位的合同争议",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},92652,"总监理工程师不得委托给总监理工程师代表的工作是（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":29},"签发工程开工令、暂停令和复工令",{"key":24,"text":478,"correct":22},"组织召开监理例会",{"key":27,"text":480,"correct":22},"组织审核分包单位资格",{"key":31,"text":482,"correct":22},"组织检查施工单位现场质量、安全生产管理体系的建立",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},92654,"关于监理实施细则的说法，正确的是（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"监理实施细则是指导项目监理机构具体开展专项监理工作的规划性文件",{"key":24,"text":490,"correct":29},"监理实施细则由专业监理工程师编制，用于指导本专业或本子项目具体监理业务的开展",{"key":27,"text":492,"correct":22},"监理实施细则应制定完善的监理工作制度",{"key":31,"text":494,"correct":22},"监理实施细则不需经总监理工程师批准，即可在监理业务中实施",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},92656,"下列属于监理员职责的是（ ）。",[499,501,502,504],{"key":20,"text":500,"correct":22},"检查进场的工程材料、构配件、设备的质量",{"key":24,"text":69,"correct":29},{"key":27,"text":503,"correct":22},"组织编写监理日志，参与编写监理月报",{"key":31,"text":505,"correct":22},"参与工程竣工预验收和竣工验收",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":20,"analysis":33},92658,"根据《建设工程监理规范》（GB\u002FT 50319—2013）规定，下列不属于监理实施细则内容的是（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":29},"监理工作的范围、内容、目标",{"key":24,"text":513,"correct":22},"监理工作流程",{"key":27,"text":515,"correct":22},"监理工作要点",{"key":31,"text":517,"correct":22},"监理工作方法及措施",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":24,"analysis":33},92662,"以下情形中，总监理工程师不应及时签发工程暂停令的是（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":22},"建设单位要求暂停施工且工程需要暂停施工",{"key":24,"text":525,"correct":29},"施工单位将隐蔽工程隐蔽",{"key":27,"text":527,"correct":22},"施工单位违反工程建设强制性标准",{"key":31,"text":529,"correct":22},"施工存在重大安全事故隐患",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":27,"analysis":33},92663,"下列不属于建设工程监理目标控制任务的是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":22},"工程质量控制任务",{"key":24,"text":537,"correct":22},"工程造价控制任务",{"key":27,"text":539,"correct":29},"工程环境控制任务",{"key":31,"text":541,"correct":22},"工程进度控制任务",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},92665,"关于安全生产管理监理工作的说法，正确的是（ ）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"监理机构应制定施工单位的现场安全生产管理规章制度",{"key":24,"text":549,"correct":29},"监理机构应审查施工单位报审的专项施工方案",{"key":27,"text":551,"correct":22},"对危险较大的分部工程施工方案，监理机构应组织专家论证",{"key":31,"text":553,"correct":22},"发现工程存在安全事故隐患时，应签发停工令",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":20,"analysis":33},92667,"项目监理机构在审查施工单位报审的专项施工方案时，应审查的基本内容是（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":29},"安全技术措施是否符合工程建设强制性标准",{"key":24,"text":561,"correct":22},"安全技术措施是否附具安全验算结果",{"key":27,"text":563,"correct":22},"专项施工方案是否已经通过专家论证",{"key":31,"text":565,"correct":22},"专项施工方案需要的资金是否已经落实",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":27,"analysis":33},92669,"下列不属于工程监理工作主要方式的是（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":22},"巡视",{"key":24,"text":573,"correct":22},"平行检验",{"key":27,"text":575,"correct":29},"指令性文件",{"key":31,"text":577,"correct":22},"见证取样",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":31,"analysis":33},92671,"工程监理单位实施监理时，需要在施工现场派驻项目监理机构，不属于设立要求的是（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":22},"遵循适应、精简、高效原则",{"key":24,"text":585,"correct":22},"一名注册监理工程师可担任一项工程监理合同的总监理工程师",{"key":27,"text":587,"correct":22},"工程监理单位调换总监理工程师时，应征得建设单位书面同意",{"key":31,"text":589,"correct":29},"调换专业监理工程师时，总监理工程师应口头通知建设单位",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},92673,"下列不属于工程监理信息系统或信息平台的主要作用的是（ ）。",[594,596,598,600],{"key":20,"text":595,"correct":22},"利用计算机数据存储技术，存储和管理与工程项目有关的信息",{"key":24,"text":597,"correct":29},"利用计算机虚拟现实技术，可快速、准确地处理工程监理所需要的信息",{"key":27,"text":599,"correct":22},"利用计算机分析运算功能，可快速提供高质量决策支持信息和备选方",{"key":31,"text":601,"correct":22},"利用计算机虚拟现实技术，可直观展示工程项目大量数据和信息",[603,606,609,612,615,617],{"id":604,"name":605,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":607,"name":608,"category":7,"favorite":8},30,"经济师",{"id":610,"name":611,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":613,"name":614,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":616,"category":7,"favorite":8},"(初级)保险专业",{"id":618,"name":619,"category":7,"favorite":8},51,"(初级)财政税收"]