[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,20,50,2598,[13,34,46,58,70,82,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,356,368,380,392,404,416,428,440,452,462,474,486,498,510,519,531,543,555,566,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},92382,1,"单选题","下列风险中，不属于按风险发生原因分类的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","自然风险",false,{"key":24,"text":25,"correct":22},"B","社会风险",{"key":27,"text":28,"correct":29},"C","投机风险",true,{"key":31,"text":32,"correct":22},"D","经济风险","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},92384,"下列风险处理的方法中，属于风险回避的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"预防危险源的发生",{"key":24,"text":41,"correct":29},"主动放弃项目",{"key":27,"text":43,"correct":22},"危险的基本特征",{"key":31,"text":45,"correct":22},"减少构成危险的数量因素",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},92386,"下列咨询设计服务单位风险中，属于来自业主或开发商的风险是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"咨询设计服务单位的能力和水平不适应",{"key":24,"text":53,"correct":29},"可行性研究缺乏严肃性和客观性",{"key":27,"text":55,"correct":22},"勘察设计单位提供的设计方案不合理",{"key":31,"text":57,"correct":22},"工程咨询单位编制的投资估算不准",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},92388,"下列关于风险管理过程的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"风险管理过程由风险估计、风险应对活动组成",{"key":24,"text":65,"correct":22},"风险估计包括风险识别和风险评价",{"key":27,"text":67,"correct":22},"风险评价包括风险识别和风险估计",{"key":31,"text":69,"correct":29},"工程风险识别是风险管理的第一步",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},92389,"在工程项目决策阶段，属于业主或开发商承担的风险是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"设计疏忽与错误",{"key":24,"text":77,"correct":22},"报价策略选择失当",{"key":27,"text":79,"correct":29},"政策风险",{"key":31,"text":81,"correct":22},"施工方案选择失当",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},92391,"下列建设项目风险中，属于承包商承担的风险是（ ）。",[86,88,89,91],{"key":20,"text":87,"correct":29},"投标相关信息取舍失误或信息失真的风险",{"key":24,"text":32,"correct":22},{"key":27,"text":90,"correct":22},"监理工程师失职的风险",{"key":31,"text":92,"correct":22},"指定分包商履约不力的风险",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},92393,"风险转移是工程风险管理广泛采用的应对策略。关于风险转移的说法，错误的是（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":29},"风险转移的目的是降低风险发生的概率",{"key":24,"text":100,"correct":22},"风险转移的目的不是减轻不利后果",{"key":27,"text":102,"correct":22},"将风险损失的一部分转移到有能力承受或控制工程风险的个人或组织",{"key":31,"text":104,"correct":22},"风险转移有保险转移和非保险转移两种途径",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":27,"analysis":33},92395,"关于工程保险特征的说法，正确的是（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"被保险人具有单一性",{"key":24,"text":112,"correct":22},"保险期限具有确定性",{"key":27,"text":114,"correct":29},"保障具有综合性",{"key":31,"text":116,"correct":22},"保险金额具有稳定性",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":31,"analysis":33},92397,"工程保险是针对工程建设过程中的因（ ）而造成的物质损失和依法应对第三者人身伤亡和财产损失承担的经济赔偿责任提供保障的一种综合性保险。",[121,123,125,127],{"key":20,"text":122,"correct":22},"资金短缺和资源不足",{"key":24,"text":124,"correct":22},"机构变更和人员调整",{"key":27,"text":126,"correct":22},"刑事责任和行政责任",{"key":31,"text":128,"correct":29},"自然灾害和意外事故",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":20,"analysis":33},92399,"关于工程保险特征的说法，错误的是（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":29},"工程保险只承保被保险人财产损失的风险",{"key":24,"text":136,"correct":22},"工程保险涉及较多的利害关系人",{"key":27,"text":138,"correct":22},"工程保险针对承保风险的特殊性提供的保障具有综合性",{"key":31,"text":140,"correct":22},"工程保险的保险期限具有不确定性",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},92401,"下列风险事件中，适用建筑工程保险第三者责任险责任免除的是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"建筑工程因意外事故造成工地第三者人身伤亡",{"key":24,"text":148,"correct":22},"建筑工程因意外事故造成邻近地区第三者人身伤亡",{"key":27,"text":150,"correct":22},"建筑工程因意外事故造成工地第三者财产损失",{"key":31,"text":152,"correct":29},"工程承包人雇用的职员所照管的财产发生的损失",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},92403,"下列损失和费用中，属于建筑工程一切险中第三者责任部分的责任范围的是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":22},"民众骚乱引起的损失",{"key":24,"text":160,"correct":29},"意外事故造成工地邻近地区的第三者人身伤亡",{"key":27,"text":162,"correct":22},"工程建设过程中污染环境造成的罚款",{"key":31,"text":164,"correct":22},"由于震动引起的房屋损失",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":31,"analysis":33},92405,"下列风险事件中，属于安装工程一切险除外责任的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"由于洪水造成保险财产的物质损失",{"key":24,"text":172,"correct":22},"由于地面下沉下陷造成保险财产的物质损失",{"key":27,"text":174,"correct":22},"由于火灾和爆炸造成保险财产本身的损失",{"key":31,"text":176,"correct":29},"由于超负荷、超电压造成电气设备本身的损失",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},92407,"安装工程风险最大的阶段是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"施工阶段",{"key":24,"text":184,"correct":22},"使用阶段",{"key":27,"text":186,"correct":29},"试车、考核和保证阶段",{"key":31,"text":188,"correct":22},"维护阶段",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":31,"analysis":33},92408,"对工程竣工时未发现的工程设计、建筑材料、技术缺陷导致后续使用过程中产生的质量问题提供风险保障的保险是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"建筑工程一切险",{"key":24,"text":196,"correct":22},"安装工程一切险",{"key":27,"text":198,"correct":22},"工程设计责任险",{"key":31,"text":200,"correct":29},"工程质量保证保险",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},92410,"某工程项目质量保修期内发现存在因施工原因造成的质量缺陷，监理单位出具了鉴定结论，则修复工作应由（ ）承担。",[205,207,209,211],{"key":20,"text":206,"correct":22},"发包人",{"key":24,"text":208,"correct":22},"监理单位",{"key":27,"text":210,"correct":29},"承包人",{"key":31,"text":212,"correct":22},"发包人和承包人共同",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},92412,"工程质量保证保险保障建筑工程在正常使用情况下，因（ ）而造成的建筑物损坏。",[217,219,221,223],{"key":20,"text":218,"correct":22},"自然灾害",{"key":24,"text":220,"correct":29},"潜在质量缺陷",{"key":27,"text":222,"correct":22},"人为过失",{"key":31,"text":224,"correct":22},"意外事故",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},92414,"工程质量保证保险的被保险人通常是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":29},"开发商",{"key":24,"text":232,"correct":22},"总承包单位",{"key":27,"text":234,"correct":22},"分包单位",{"key":31,"text":236,"correct":22},"工程监理单位",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},92416,"下列不属于工程质量保证保险的保险责任的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":29},"屋顶严重漏水",{"key":24,"text":244,"correct":22},"主体结构整体倾斜",{"key":27,"text":246,"correct":22},"雨篷构件出现坍塌",{"key":31,"text":248,"correct":22},"主体结构部位出现影响结构安全的裂缝",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},92418,"将风险分为纯粹风险和投机风险的依据是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"风险产生的根源",{"key":24,"text":256,"correct":29},"风险造成的后果",{"key":27,"text":258,"correct":22},"风险分布的情况",{"key":31,"text":260,"correct":22},"风险控制的角度",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":27,"analysis":33},92421,"下列不属于建设工程监理工作三大目标的是( )。",[265,267,269,271],{"key":20,"text":266,"correct":22},"质量目标",{"key":24,"text":268,"correct":22},"造价目标",{"key":27,"text":270,"correct":29},"文明施工目标",{"key":31,"text":272,"correct":22},"进度目标",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":20,"analysis":33},92423,"为了有效控制建设工程目标，监理单位应从组织、技术、经济、合同等多方面采取措施，其中( )是其他各类措施的前提和保障。",[277,279,281,283],{"key":20,"text":278,"correct":29},"组织措施",{"key":24,"text":280,"correct":22},"技术措施",{"key":27,"text":282,"correct":22},"经济措施",{"key":31,"text":284,"correct":22},"合同措施",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},92425,"下列关于工程暂停及复工处理的说法，错误的是( )。",[289,291,293,295],{"key":20,"text":290,"correct":29},"专业监理工程师签发工程暂停令，应事先征得建设单位同意",{"key":24,"text":292,"correct":22},"总监理工程师应会同有关各方按施工合同约定，处理因工程暂停引起的与工期、费用有关的问题",{"key":27,"text":294,"correct":22},"总监理工程师应及时签署复工申请的审查意见，并应报建设单位批准后签发工程复工令",{"key":31,"text":296,"correct":22},"施工单位未提出复工申请的，总监理工程师应根据工程实际情况指令施工单位恢复施工",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":20,"analysis":33},92427,"施工单位违反工程建设强制性标准的，应由( )及时签发工程暂停令。",[301,303,305,307],{"key":20,"text":302,"correct":29},"总监理工程师",{"key":24,"text":304,"correct":22},"总监理工程师代表",{"key":27,"text":306,"correct":22},"专业监理工程师",{"key":31,"text":308,"correct":22},"监理员",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},92429,"项目监理机构与设计单位的协调属于项目监理机构的()。",[313,315,317,319],{"key":20,"text":314,"correct":22},"内部协调",{"key":24,"text":316,"correct":22},"近内部协调",{"key":27,"text":318,"correct":29},"近外层协调",{"key":31,"text":320,"correct":22},"远外层协调",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":27,"analysis":33},92431,"下列单位中，属于项目监理机构远外层协调范围的单位是()。",[325,327,329,331],{"key":20,"text":326,"correct":22},"材料供应商和设备供应商",{"key":24,"text":328,"correct":22},"设备供应商和政府部门",{"key":27,"text":330,"correct":29},"政府部门和社会团体",{"key":31,"text":332,"correct":22},"社会团体和材料供应商",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},92433,"下列不属于项目监理机构的内部协调的是()。",[337,339,341,343],{"key":20,"text":338,"correct":22},"在项目监理机构内部建立信息沟通制度",{"key":24,"text":340,"correct":29},"与建设单位、政府建设行政主管机构的协调",{"key":27,"text":342,"correct":22},"项目监理机构内部及时交流信息、处理矛盾，建立良好的人际关系",{"key":31,"text":344,"correct":22},"明确监理人员分工及各自的岗位职责",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":24,"analysis":33},92434,"项目监理机构应审查施工单位报审的专项施工方案，符合要求的，应由总监理工程师签认后报( )。",[349,351,353,355],{"key":20,"text":350,"correct":22},"政府主管部门",{"key":24,"text":352,"correct":29},"建设单位",{"key":27,"text":354,"correct":22},"安全生产监督机构",{"key":31,"text":236,"correct":22},{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":27,"analysis":33},92436,"项目监理机构监理人员对施工现场进行定期或不定期的检查活动称为( )。",[360,362,364,366],{"key":20,"text":361,"correct":22},"平行检查",{"key":24,"text":363,"correct":22},"旁站",{"key":27,"text":365,"correct":29},"巡视检查",{"key":31,"text":367,"correct":22},"见证取样",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":27,"analysis":33},92438,"项目监理机构系统外部协调分为近外层协调和远外层协调，建设单位与近外层关联单位一般()",[372,374,376,378],{"key":20,"text":373,"correct":22},"无合同关系",{"key":24,"text":375,"correct":22},"有委托关系",{"key":27,"text":377,"correct":29},"有合同关系",{"key":31,"text":379,"correct":22},"有利害关系",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":27,"analysis":33},92440,"在实施施工监理过程中，发现存在安全事故隐患，情况严重的，其正确的处理方法是( )。",[384,386,388,390],{"key":20,"text":385,"correct":22},"签发监理工程师通知单",{"key":24,"text":387,"correct":22},"要求施工单位整改",{"key":27,"text":389,"correct":29},"总监理工程师应签发工程暂停令，并应及时报告建设单位",{"key":31,"text":391,"correct":22},"应及时向有关主管部门报送监理报告",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":20,"analysis":33},92442,"监理人员实施旁站监理时，发现施工企业有违反工程建设强制性标准行为时，应当( )。",[396,398,400,402],{"key":20,"text":397,"correct":29},"责令施工企业立即整改",{"key":24,"text":399,"correct":22},"向施工企业项目经理报告",{"key":27,"text":401,"correct":22},"向建设单位驻工地代表报告",{"key":31,"text":403,"correct":22},"向建设行政主管部门报告",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":31,"analysis":33},92444,"下列措施中，不属于工程监理目标控制措施中技术措施的是( )。",[408,410,412,414],{"key":20,"text":409,"correct":22},"对多个可能的建设方案、施工方案等进行技术可行性分析",{"key":24,"text":411,"correct":22},"对施工组织设计、施工方案等进行审查、论证",{"key":27,"text":413,"correct":22},"采用工程网络计划技术、信息化技术等实施动态控制",{"key":31,"text":415,"correct":29},"加强动态控制过程中的激励措施",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},92446,"项目监理机构控制工程质量、造价、进度三大目标的重要手段是( )。",[420,422,424,426],{"key":20,"text":421,"correct":22},"质量管理",{"key":24,"text":423,"correct":29},"合同管理",{"key":27,"text":425,"correct":22},"安全管理",{"key":31,"text":427,"correct":22},"信息管理",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":31,"analysis":33},92448,"下列关于项目监理机构文件资料管理的基本职责说法，错误的是()。",[432,434,436,438],{"key":20,"text":433,"correct":22},"设立专人进行监理文件资料的管理",{"key":24,"text":435,"correct":22},"宜采用信息技术进行监理文件资料管理",{"key":27,"text":437,"correct":22},"应及时整理、分类汇总监理文件资料，并按规定组卷，形成监理档案",{"key":31,"text":439,"correct":29},"监理单位保存监理档案，无须移交监理文件资料",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},92450,"项目监理机构在施工合同争议处理过程中，对未达到施工合同约定的暂停履行合同条件的，应要求施工合同双方( )履行合同。",[444,446,448,450],{"key":20,"text":445,"correct":22},"中止",{"key":24,"text":447,"correct":22},"终止",{"key":27,"text":449,"correct":22},"暂缓",{"key":31,"text":451,"correct":29},"继续",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":27,"analysis":33},92452,"项目监理机构对工程的关键部位或关键工序的施工质量进行的监督活动属于监理工作（）方式。",[456,458,460,461],{"key":20,"text":457,"correct":22},"巡视",{"key":24,"text":459,"correct":22},"平行检验",{"key":27,"text":363,"correct":29},{"key":31,"text":367,"correct":22},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":27,"analysis":33},92454,"下列不属于建设工程监理目标控制任务的是（）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"工程质量控制任务",{"key":24,"text":469,"correct":22},"工程造价控制任务",{"key":27,"text":471,"correct":29},"工程环境控制任务",{"key":31,"text":473,"correct":22},"工程进度控制任务",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},92455,"下列不属于工程监理信息系统或信息平台的主要作用的是（）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"利用计算机数据存储技术，存储和管理与工程项目有关的信息",{"key":24,"text":481,"correct":29},"利用计算机虚拟现实技术，可快速、准确地处理工程监理所需要的信息",{"key":27,"text":483,"correct":22},"利用计算机分析运算功能，可快速提供高质量决策支持信息和备选方",{"key":31,"text":485,"correct":22},"利用计算机虚拟现实技术，可直观展示工程项目大量数据和信息",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},92459,"下列不属于项目监理机构在进行组织协调时采用的方式是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"会议",{"key":24,"text":493,"correct":22},"交谈",{"key":27,"text":495,"correct":22},"书面方式",{"key":31,"text":497,"correct":29},"口头方式",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":27,"analysis":33},92461,"下列关于项目监理机构进行安全生产管理表述不正确的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"审查施工单位的管理制度、人员资格及验收手续",{"key":24,"text":505,"correct":22},"项目监理机构应审查施工单位报审的专项施工方案，符合要求 的，应由总监理工程师签认后报建设单位",{"key":27,"text":507,"correct":29},"项目监理机构在实施监理过程中，发现工程存在安全事故隐患时，应立即签发工程暂停令",{"key":31,"text":509,"correct":22},"紧急情况下，项目监理机构可通过电话、传真或者电子邮件向有关主管部门报告，事后应形成监理报告",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":27,"analysis":33},92463,"下列不属于工程监理工作主要方式的是（）。",[514,515,516,518],{"key":20,"text":457,"correct":22},{"key":24,"text":459,"correct":22},{"key":27,"text":517,"correct":29},"指令性文件",{"key":31,"text":367,"correct":22},{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},92465,"项目监理机构在审查施工单位报审的专项施工方案时，应审查的基本内容是（）。",[523,525,527,529],{"key":20,"text":524,"correct":29},"安全技术措施是否符合工程建设强制性标准",{"key":24,"text":526,"correct":22},"安全技术措施是否附具安全验算结果",{"key":27,"text":528,"correct":22},"专项施工方案是否已经通过专家论证",{"key":31,"text":530,"correct":22},"专项施工方案需要的资金是否已经落实",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":27,"analysis":33},92467,"下列关于工程暂停及复工处理中表述不正确的是（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"总监理工程师签发工程暂停令，应事先征得建设单位同意",{"key":24,"text":538,"correct":22},"总监理工程师在紧急情况下未能事先报告时，应在事后及时向建设单位作出书面报告",{"key":27,"text":540,"correct":29},"当暂停施工原因解除、具备复工条件时，施工单位提出复工申请的，项目监理机构应审查施工单位报送的有关材料，符合要求后的总监理工程师应及时签署审查意见批准签发工程复工令",{"key":31,"text":542,"correct":22},"当暂停施工原因解除、具备复工条件时，施工单位未提出复工申请的，总监理工程师应根据工程实际情况指令施工单位恢复施工。",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":20,"analysis":33},92471,"关于安全生产管理监理工作的说法，正确的是（）。",[547,549,551,553],{"key":20,"text":548,"correct":29},"应将安全生产管理的监理工作内容、方法和措施纳人监理规划及监理实施细则",{"key":24,"text":550,"correct":22},"由施工单位报审的专项施工方案，经审查符合要求的，由专业监理工程师签认后报建设单位",{"key":27,"text":552,"correct":22},"项目监理机构应抽样检查危险性较大的分部分项工程专项施工方案实施情况",{"key":31,"text":554,"correct":22},"项目监理机构发现工程存在严重的安全事故隐患时，应签发监理通知单，要求施工单位整改",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},92473,"建设工程监理行为实施的前提是( )的委托和授权。",[559,560,562,564],{"key":20,"text":352,"correct":29},{"key":24,"text":561,"correct":22},"施工单位",{"key":27,"text":563,"correct":22},"设计单位",{"key":31,"text":565,"correct":22},"行政主管部门",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":31,"analysis":33},92475,"下列关于工程监理服务性的理解，错误的是( )。",[570,572,574,576],{"key":20,"text":571,"correct":22},"工程监理人员为建设单位提供管理和技术服务",{"key":24,"text":573,"correct":22},"工程监理单位不直接进行工程设计",{"key":27,"text":575,"correct":22},"工程监理单位不向建设单位承包工程造价",{"key":31,"text":577,"correct":29},"工程监理单位参与施工单位的利润分成",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":27,"analysis":33},92476,"关于建设工程监理的含义正确的表述是( )。",[582,584,586,588],{"key":20,"text":583,"correct":22},"工程监理的行为与政府主管部门的监督管理是相同的",{"key":24,"text":585,"correct":22},"建设工程实施监理，既可受建设单位的委托，也可受施工单位的委托",{"key":27,"text":587,"correct":29},"在工程勘察、设计、保修等阶段提供的服务活动均为建设工程监理相关服务",{"key":31,"text":589,"correct":22},"建设工程监理服务的内容仅指对工程质量、造价、进度进行控制，对合同、信息进行管理，对工程建设相关方的关系进行协调，即“三控两管一协调”",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":24,"analysis":33},92478,"根据国家有关法规规定，下列()不属于必须实施工程监理的建设工程的范围。",[594,596,598,600],{"key":20,"text":595,"correct":22},"国家重点建设工程",{"key":24,"text":597,"correct":29},"零散开发建设的住宅小区",{"key":27,"text":599,"correct":22},"大中型公用事业工程",{"key":31,"text":601,"correct":22},"使用国外资金的建设项目",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":20,"analysis":33},92480,"下列关于工程监理单位和监理人员职责的表述中，正确的是()。",[606,608,610,612],{"key":20,"text":607,"correct":29},"工程监理人员认为工程施工不符合工程设计要求、施工技术标准和合同约定的，有权要求施工企业整改",{"key":24,"text":609,"correct":22},"工程监理人员发现工程设计不符合建筑工程质量标准或者合同约定的质量要求的，有权要求设计单位改正",{"key":27,"text":611,"correct":22},"未经总监理工程师签字，建筑材料、建筑构配件和设备不得在工程上使用或安装",{"key":31,"text":613,"correct":22},"工程监理单位在实施监理过程中，发现存在安全事故隐患且情况严重的，应当及时向有关主管部门报告",[615,618,621,624,627,629],{"id":616,"name":617,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":619,"name":620,"category":7,"favorite":8},30,"经济师",{"id":622,"name":623,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":625,"name":626,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":628,"category":7,"favorite":8},"(初级)保险专业",{"id":630,"name":631,"category":7,"favorite":8},51,"(初级)财政税收"]