[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-64-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},64,"(中级) 建筑与房地产经济","经济金融",0,17,50,2598,[13,34,46,58,70,79,91,103,115,125,137,149,161,173,185,197,209,221,233,245,257,269,280,292,304,316,328,340,352,364,376,387,399,409,421,433,445,455,467,479,489,501,513,525,536,548,559,571,583,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},92109,1,"单选题","人与机器人协作成果能获得直接体现的重要原因是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","一体化",false,{"key":24,"text":25,"correct":22},"B","体外化",{"key":27,"text":28,"correct":22},"C","性能化模拟",{"key":30,"text":31,"correct":32},"D","虚拟化\u002F物质化的数字孪生",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},92110,"应用BIM技术进行设计和分析，使建筑物可以更好地适应环境变化，体现了BIM的( )应用价值。",[38,40,42,44],{"key":20,"text":39,"correct":22},"提高生产效率",{"key":24,"text":41,"correct":22},"提高业主对设计方案的评估能力",{"key":27,"text":43,"correct":22},"有利于缩短工期",{"key":30,"text":45,"correct":32},"提高建设设施的可持续性",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},92112,"施工图设计是建筑设计的重要阶段，以下不属于BIM技术在施工图设计阶段的应用的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"专业模型深化",{"key":24,"text":53,"correct":22},"辅助模型信息深化",{"key":27,"text":55,"correct":32},"场地建模",{"key":30,"text":57,"correct":22},"专项设计",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},92114,"以下内容不属于BIM 5D模型的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"建筑构件信息",{"key":24,"text":65,"correct":22},"进度信息",{"key":27,"text":67,"correct":32},"质量信息",{"key":30,"text":69,"correct":22},"预算信息",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},92116,"利用BIM技术可以大大加强各参与方协同工作，提高信息交流的有效性，使得决策速度和有效性均有提高，这体现的BIM技术（ ）。",[74,75,76,78],{"key":20,"text":41,"correct":22},{"key":24,"text":39,"correct":32},{"key":27,"text":77,"correct":22},"有利于缩短项目工期",{"key":30,"text":45,"correct":22},{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":20,"analysis":33},92118,"BIM的主要技术是（ ）。",[83,85,87,89],{"key":20,"text":84,"correct":32},"参数化建模技术",{"key":24,"text":86,"correct":22},"CAD技术",{"key":27,"text":88,"correct":22},"三维技术",{"key":30,"text":90,"correct":22},"模拟技术",{"id":92,"libraryId":5,"type":15,"typeLabel":16,"stem":93,"options":94,"answer":24,"analysis":33},92120,"BIM构件信息的（ ）特征，使BIM技术除具有一般3D模型的功能外，还可模拟建筑设施的一些非几何属性。",[95,97,99,101],{"key":20,"text":96,"correct":22},"三维化",{"key":24,"text":98,"correct":32},"多元化",{"key":27,"text":100,"correct":22},"存量大",{"key":30,"text":102,"correct":22},"时效性",{"id":104,"libraryId":5,"type":15,"typeLabel":16,"stem":105,"options":106,"answer":27,"analysis":33},92122,"以下标准中，不属于BIM技术应用标准的是（ ）。",[107,109,111,113],{"key":20,"text":108,"correct":22},"数据标准",{"key":24,"text":110,"correct":22},"内容标准",{"key":27,"text":112,"correct":32},"效率标准",{"key":30,"text":114,"correct":22},"协同工作标准",{"id":116,"libraryId":5,"type":15,"typeLabel":16,"stem":117,"options":118,"answer":20,"analysis":33},92124,"建筑信息模型（BIM）是以为（ ）基础、集成工程项目各种相关信息的数据模型。",[119,121,122,124],{"key":20,"text":120,"correct":32},"三维数字技术",{"key":24,"text":86,"correct":22},{"key":27,"text":123,"correct":22},"3D打印",{"key":30,"text":90,"correct":22},{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":20,"analysis":33},92126,"BIM技术发展意味着其要素的发展，这些要素中，源头是（ ）。",[129,131,133,135],{"key":20,"text":130,"correct":32},"BIM应用点",{"key":24,"text":132,"correct":22},"BIM应用软件",{"key":27,"text":134,"correct":22},"BIM应用标准",{"key":30,"text":136,"correct":22},"CAD应用标注",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":27,"analysis":33},92128,"在项目设计前期阶段，BIM技术可应用于场地设计。场地设计的内部不包括（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"场地分析",{"key":24,"text":144,"correct":22},"场地平整",{"key":27,"text":146,"correct":32},"土方开挖深度",{"key":30,"text":148,"correct":22},"边坡处理",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":24,"analysis":33},92129,"以下不属于应用BIM进行建筑生态模拟分析的内容的是（ ）。",[153,155,157,159],{"key":20,"text":154,"correct":22},"能耗模拟",{"key":24,"text":156,"correct":32},"居住模拟",{"key":27,"text":158,"correct":22},"自然采光模拟",{"key":30,"text":160,"correct":22},"自然通风模拟",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":27,"analysis":33},92131,"BIM 5D模型是在3D信息模型的基础上，与进度计划、（ ）集成，扩展成为BIM 5D模型。",[165,167,169,171],{"key":20,"text":166,"correct":22},"安全模型",{"key":24,"text":168,"correct":22},"质量模型",{"key":27,"text":170,"correct":32},"预算模型",{"key":30,"text":172,"correct":22},"环境模型",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},92133,"应用BIM进行施工现场临时设施规划的流程的第一步为（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":32},"标准化族库建立",{"key":24,"text":180,"correct":22},"主体模型简化",{"key":27,"text":182,"correct":22},"模型信息建立",{"key":30,"text":184,"correct":22},"平面布置模拟",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":27,"analysis":33},92135,"交付BIM模型和深化图纸时由建设单位质量管理者来执行验收，指的是BIM模型质量控制的（ ）环节。",[189,191,193,195],{"key":20,"text":190,"correct":22},"事前质量控制",{"key":24,"text":192,"correct":22},"事后质量控制",{"key":27,"text":194,"correct":32},"质量验收",{"key":30,"text":196,"correct":22},"成果交付",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":20,"analysis":33},92137,"BIM模型的核心元素是（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":32},"模型图元",{"key":24,"text":204,"correct":22},"视图图元",{"key":27,"text":206,"correct":22},"标注图元",{"key":30,"text":208,"correct":22},"颜色图元",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":27,"analysis":33},92139,"智能建筑的组成系统中，对建筑设备监控和公共安全系统等实施综合管理的系统的是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"智能化集成系统",{"key":24,"text":216,"correct":22},"信息设施系统",{"key":27,"text":218,"correct":32},"建筑设备管理系统",{"key":30,"text":220,"correct":22},"应急响应系统",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},92141,"总建筑面积大于（ ）m2的公共建筑所设置的应急响应系统，必须配置与上一级信息互联的通信接口。",[225,227,229,231],{"key":20,"text":226,"correct":22},"15000",{"key":24,"text":228,"correct":32},"20000",{"key":27,"text":230,"correct":22},"30000",{"key":30,"text":232,"correct":22},"25000",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},92143,"智慧城市评价指标体系可分为能力类、成效类两类指标。以下不属于成效类一级指标的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"公共服务",{"key":24,"text":240,"correct":32},"服务便捷度",{"key":27,"text":242,"correct":22},"社会管理",{"key":30,"text":244,"correct":22},"生态宜居",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},92145,"以下不属于智能建筑的目标的是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":32},"应用3D技术",{"key":24,"text":252,"correct":22},"增强建筑物科技功能",{"key":27,"text":254,"correct":22},"提升智能化系统的技术功效",{"key":30,"text":256,"correct":22},"绿色建筑",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":30,"analysis":33},92146,"开展智慧城市顶层设计过程中应考虑政府、企业、居民等不同角色的意见及建议，体现的是智慧城市顶层设计的（ ）原则。",[261,263,265,267],{"key":20,"text":262,"correct":22},"以人为本",{"key":24,"text":264,"correct":22},"因城施策",{"key":27,"text":266,"correct":22},"融合共享",{"key":30,"text":268,"correct":32},"多元参与",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},92148,"新一代智能制造系统最本质的特征是其信息系统增加了（ ）功能。",[273,275,277,278],{"key":20,"text":274,"correct":22},"三维模拟",{"key":24,"text":276,"correct":32},"认知和学习",{"key":27,"text":123,"correct":22},{"key":30,"text":279,"correct":22},"模仿",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":30,"analysis":33},92152,"下列系统中，揭示了新一代智能制造技术机理的是（ ）。",[284,286,288,290],{"key":20,"text":285,"correct":22},"人—物理系统",{"key":24,"text":287,"correct":22},"信息—物理系统",{"key":27,"text":289,"correct":22},"人—信息系统",{"key":30,"text":291,"correct":32},"人—信息—物理系统",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":27,"analysis":33},92154,"综合考虑工程项目各风险之间的相互影响、相互作用，以及对工程项目的总体影响，然后与风险评价基准比较，确定是否采取控制措施的过程是( )。",[296,298,300,302],{"key":20,"text":297,"correct":22},"风险识别",{"key":24,"text":299,"correct":22},"风险估计",{"key":27,"text":301,"correct":32},"风险评价",{"key":30,"text":303,"correct":22},"风险应对",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":27,"analysis":33},92156,"工程风险按是否可管理分类，可以将风险分为( )。",[308,310,312,314],{"key":20,"text":309,"correct":22},"纯粹风险和投机风险",{"key":24,"text":311,"correct":22},"自然风险、政治风险、经济风险、社会风险和金融风险",{"key":27,"text":313,"correct":32},"可管理风险和不可管理风险",{"key":30,"text":315,"correct":22},"高度风险、中度风险和低度风险",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":20,"analysis":33},92158,"下列风险中，不属于承包商在签约履约阶段风险的是()",[320,322,324,326],{"key":20,"text":321,"correct":32},"选择投标代理人不当",{"key":24,"text":323,"correct":22},"合同管理不善",{"key":27,"text":325,"correct":22},"工程施工管理能力不足或技术不熟练",{"key":30,"text":327,"correct":22},"分包单位管理水平低下",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},92160,"工程风险管理是一项非常复杂的管理过程，包括：①风险评价；②风险估计；③风险识别；④风险监督；⑤风险应对。风险管理流程是( )。",[332,334,336,338],{"key":20,"text":333,"correct":22},"①②③④⑤",{"key":24,"text":335,"correct":32},"③②①⑤④",{"key":27,"text":337,"correct":22},"③①②⑤④",{"key":30,"text":339,"correct":22},"③①②④⑤",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":30,"analysis":33},92162,"建立建设工程初始风险清单的有效途径是( )。",[344,346,348,350],{"key":20,"text":345,"correct":22},"采用保险公司公布的潜在损失一览表",{"key":24,"text":347,"correct":22},"采用风险管理学会公布的潜在损失一览表",{"key":27,"text":349,"correct":22},"采用风险管理协会公布的潜在损失一览表",{"key":30,"text":351,"correct":32},"通过适当的风险分解方式来识别风险",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},92164,"工程风险估计的首要任务是分析和估计( )。",[356,358,360,362],{"key":20,"text":357,"correct":22},"风险事件发生时间",{"key":24,"text":359,"correct":32},"风险事件发生的概率与概率分布",{"key":27,"text":361,"correct":22},"风险事件发生可能产生的后果",{"key":30,"text":363,"correct":22},"风险事件发生的影响范围",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":30,"analysis":33},92166,"以下属于确定型风险估计的方法是()。",[368,370,372,374],{"key":20,"text":369,"correct":22},"头脑风暴法",{"key":24,"text":371,"correct":22},"悲观准则",{"key":27,"text":373,"correct":22},"乐观准则",{"key":30,"text":375,"correct":32},"盈亏平衡分析",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":20,"analysis":33},92167,"工程风险事件发生概率估计方法不包括( )。",[380,381,383,385],{"key":20,"text":369,"correct":32},{"key":24,"text":382,"correct":22},"理论概率分布法",{"key":27,"text":384,"correct":22},"主观概率法",{"key":30,"text":386,"correct":22},"综合推断法",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},92169,"工程风险指标估计时，需要采用风险损失的标准差来衡量风险后果的严重性。标准差越小，风险程度就( )。",[391,393,395,397],{"key":20,"text":392,"correct":22},"越大",{"key":24,"text":394,"correct":32},"越小",{"key":27,"text":396,"correct":22},"越难控制",{"key":30,"text":398,"correct":22},"越难估计",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":24,"analysis":33},92171,"采用等风险图法进行风险评价时，等风险图中，曲线距离原点越远，一般认为风险就( )。",[403,404,405,407],{"key":20,"text":394,"correct":22},{"key":24,"text":392,"correct":32},{"key":27,"text":406,"correct":22},"一样大",{"key":30,"text":408,"correct":22},"不能比较",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},92173,"某承包商经过分析认定，所承包的工程很有可能亏损，因此主动放弃了该项目。这种风险应对措施是( )。",[413,415,417,419],{"key":20,"text":414,"correct":22},"风险转移",{"key":24,"text":416,"correct":32},"风险回避",{"key":27,"text":418,"correct":22},"风险减轻",{"key":30,"text":420,"correct":22},"风险预防",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},92175,"工程风险减轻的途径不包括( )。",[425,427,429,431],{"key":20,"text":426,"correct":22},"减少风险发生概率",{"key":24,"text":428,"correct":32},"把风险转移出去",{"key":27,"text":430,"correct":22},"分散风险",{"key":30,"text":432,"correct":22},"分离风险",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":20,"analysis":33},92177,"下列关于风险预防的说法，不正确的是()。",[437,439,441,443],{"key":20,"text":438,"correct":32},"风险预防是一种被动的风险应对策略",{"key":24,"text":440,"correct":22},"风险预防常分为有形和无形两种手段",{"key":27,"text":442,"correct":22},"结合工程特性采取一定的工程技术手段属于有形预防措施",{"key":30,"text":444,"correct":22},"对工程项目管理人员广泛开展教育属于无形预防措施",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":27,"analysis":33},92179,"工程建设参与方有意识地选择自己承担风险后果的一种风险应对策略是( )。",[449,450,451,453],{"key":20,"text":414,"correct":22},{"key":24,"text":420,"correct":22},{"key":27,"text":452,"correct":32},"风险自留",{"key":30,"text":454,"correct":22},"风险利用",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},92181,"应对风险的更高层次是风险利用。风险利用是仅对( )采取的措施。",[459,461,463,465],{"key":20,"text":460,"correct":22},"纯粹风险",{"key":24,"text":462,"correct":32},"投机风险",{"key":27,"text":464,"correct":22},"高度风险",{"key":30,"text":466,"correct":22},"低度风险",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":20,"analysis":33},92183,"在工程风险监控时发现一些新的风险产生时，就要能随机应变，及时提出应对措施，这属于工程风险控制的( )。",[471,473,475,477],{"key":20,"text":472,"correct":32},"权变措施",{"key":24,"text":474,"correct":22},"纠正措施",{"key":27,"text":476,"correct":22},"项目变更申请",{"key":30,"text":478,"correct":22},"项目变更建议",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},92185,"承包商考虑到工程存在风险，将部分工程进行分包的行为属于风险应对措施中的( )。",[483,484,486,488],{"key":20,"text":416,"correct":22},{"key":24,"text":485,"correct":22},"保险转移",{"key":27,"text":487,"correct":32},"非保险转移",{"key":30,"text":420,"correct":22},{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":30,"analysis":33},92187,"下列风险中，属于承包商风险的是( )。",[493,495,497,499],{"key":20,"text":494,"correct":22},"基础设施落后",{"key":24,"text":496,"correct":22},"恶劣的现场条件",{"key":27,"text":498,"correct":22},"工程所在国发生战争",{"key":30,"text":500,"correct":32},"报价失误",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},92189,"工程项目风险识别的最主要成果是( )。",[505,507,509,511],{"key":20,"text":506,"correct":22},"风险流程",{"key":24,"text":508,"correct":22},"风险发生的概率",{"key":27,"text":510,"correct":32},"风险清单",{"key":30,"text":512,"correct":22},"风险后果集",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":27,"analysis":33},92191,"将工程风险分为高度、中度、低度风险的依据是( )。",[517,519,521,523],{"key":20,"text":518,"correct":22},"风险造成的后果",{"key":24,"text":520,"correct":22},"风险发生的原因",{"key":27,"text":522,"correct":32},"风险作用的强度",{"key":30,"text":524,"correct":22},"风险是否可管理",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},92193,"下列风险中，不属于咨询设计服务单位风险的是()。",[529,531,532,534],{"key":20,"text":530,"correct":22},"工程投资预算不足",{"key":24,"text":325,"correct":32},{"key":27,"text":533,"correct":22},"勘察设计单位提供的设计方案不合理",{"key":30,"text":535,"correct":22},"咨询设计服务单位的能力和水平不适应",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":27,"analysis":33},92195,"风险识别的步骤有：①建立工程风险初始清单；②收集和整理相关信息资料；③编制工程风险清单；④进行风险归集和分类。其正确的次序是()。",[540,542,544,546],{"key":20,"text":541,"correct":22},"①②③④",{"key":24,"text":543,"correct":22},"②①③④",{"key":27,"text":545,"correct":32},"②①④③",{"key":30,"text":547,"correct":22},"①②④③",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":30,"analysis":33},92197,"工程风险识别常用的方法不包括( )",[552,554,555,557],{"key":20,"text":553,"correct":22},"核对表法",{"key":24,"text":369,"correct":22},{"key":27,"text":556,"correct":22},"常识、经验和判断法",{"key":30,"text":558,"correct":32},"蒙特卡洛法",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":27,"analysis":33},92198,"以下情况中，属于风险转移的是()。",[563,565,567,569],{"key":20,"text":564,"correct":22},"从项目中取消一项风险高的工作",{"key":24,"text":566,"correct":22},"选用比较稳定的供应商",{"key":27,"text":568,"correct":32},"要求供应商提供履约担保",{"key":30,"text":570,"correct":22},"建立应急储备",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},92200,"下列建设项目风险中，属于承包商承担的风险是（)。",[575,577,579,581],{"key":20,"text":576,"correct":32},"项目选择中蕴藏的风险",{"key":24,"text":578,"correct":22},"经济风险",{"key":27,"text":580,"correct":22},"监理工程师失职的风险",{"key":30,"text":582,"correct":22},"指定分包商履约不力的风险",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":20,"analysis":33},92202,"风险转移是工程风险管理广泛采用的应对策略。关于风险转移的说法，错误的是（）。",[587,589,591,593],{"key":20,"text":588,"correct":32},"风险转移的目的是降低风险发生的概率",{"key":24,"text":590,"correct":22},"风险转移的目的不是减轻不利后果",{"key":27,"text":592,"correct":22},"将风险损失的一部分转移到有能力承受或控制工程风险的个人或组织",{"key":30,"text":594,"correct":22},"风险转移有保险转移和非保险转移两种途径",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":24,"analysis":33},92204,"将风险分为纯粹风险和投机风险的依据是（）。",[599,601,602,604],{"key":20,"text":600,"correct":22},"风险产生的根源",{"key":24,"text":518,"correct":32},{"key":27,"text":603,"correct":22},"风险分布的情况",{"key":30,"text":605,"correct":22},"风险控制的角度",[607,610,613,616,619,621],{"id":608,"name":609,"category":7,"favorite":15},109,"发布证券研究报告业务",{"id":611,"name":612,"category":7,"favorite":8},30,"经济师",{"id":614,"name":615,"category":7,"favorite":8},31,"(初级)银行从业资格",{"id":617,"name":618,"category":7,"favorite":8},49,"初级经济师",{"id":10,"name":620,"category":7,"favorite":8},"(初级)保险专业",{"id":622,"name":623,"category":7,"favorite":8},51,"(初级)财政税收"]