[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-94253":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},94253,64,2,"多选题","重大工程和技术复杂工程的设计阶段有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","初步设计阶段",true,{"key":16,"text":17,"correct":14},"B","技术设计阶段",{"key":19,"text":20,"correct":14},"C","施工图设计阶段",{"key":22,"text":23,"correct":24},"D","任务书设计阶段",false,{"key":26,"text":27,"correct":24},"E","规划设计阶段","ABC","工程设计工作一般划分为两个阶段，即初步设计和施工图设计。重大工程和技术复杂工程，可根据需要增加技术设计阶段。",{"id":6,"name":31,"category":32,"favorite":33},"(中级) 建筑与房地产经济","经济金融",0]